Unincorporated Sumter County: Single-Family Impact Fees
A new single-family home in unincorporated Sumter County pays $6,507.00 per unit in impact fees (rates sourced October 29, 2026). Of that, Sumter County-levied fees account for $3,332.00 and municipal or utility fees for $3,175.00.
The largest line items are Road Impact Fee (Sumter County) ($3,332.00), Sewer Connection Fee (Unincorporated Sumter County) ($2,336.00) and Water Connection Fee (Unincorporated Sumter County) ($839.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Sumter County Impact Fee Schedule
- Water Connection Fee (Unincorporated Sumter County)$839.00North Sumter Utilities, 5/8"North Sumter UtilitiesIn unincorporated Sumter County the one-time water connection (contribution-in-aid-of-construction) charge depends on the district utility serving the parcel. North Sumter Utilities, the largest, charges $839 for a 5/8-inch residential connection ($1,259 for 3/4-inch, $2,098 for 1-inch). Other districts: Central Sumter $1,119, Little Sumter $780 (5/8-inch), South Sumter (Wildwood) $1,916. Rates as of October 1, 2025. Parcels outside these service areas are on private wells.
- Sewer Connection Fee (Unincorporated Sumter County)$2,336.00Central Sumter UtilitiesVaries (Villages utility districts / private septic)In unincorporated Sumter County the one-time sewer connection (contribution-in-aid-of-construction) charge depends on which district utility serves the parcel. Central Sumter Utilities charges $2,336. Other districts: South Sumter (Wildwood) $2,251, North Sumter $1,461, Little Sumter $840 (each for a 5/8-inch residential meter). Parcels outside these service areas are on septic with no connection charge.
- Municipal Impact Fees (Unincorporated Sumter County)$0.00N/A (unincorporated)Unincorporated Sumter County levies no municipal impact fees. A new home pays the countywide Sumter County Road Impact Fee and, within the northern Fire & EMS service area, the county Fire Impact Fee, plus water and sewer connection charges from the district utility serving the parcel.
- Road Impact Fee (Sumter County)$3,332.00Sumter CountySumter County Road Impact Fee, single-family detached: $3,332 per home (Phase II, effective 1/1/2026). Levied countywide, including in incorporated cities. Scheduled increases: $3,665 on 1/1/2027 and $3,999 on 1/1/2028.
- Fire Impact Fee (Sumter County Fire & EMS) — Outside fire impact area$0.00Outside fire impact area (incl. The Villages)Sumter CountyMost of unincorporated Sumter County, including The Villages and everything south of Florida's Turnpike, pays no county fire impact fee. The county charges it only in its fire regional impact area, north of the Turnpike and east to The Villages Public Safety Department boundary (see the other option).
Where in Sumter County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Sumter County: Multifamily Impact Fees
A new multifamily unit in unincorporated Sumter County pays $4,948.00 per unit in impact fees (rates sourced October 29, 2026). Of that, Sumter County-levied fees account for $1,773.00 and municipal or utility fees for $3,175.00.
The largest line items are Sewer Connection Fee (Unincorporated Sumter County, MF) ($2,336.00), Road Impact Fee (Sumter County, MF) ($1,773.00) and Water Connection Fee (Unincorporated Sumter County, MF) ($839.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Sumter County Impact Fee Schedule
- Water Connection Fee (Unincorporated Sumter County, MF)$839.00North Sumter Utilities, 5/8"North Sumter UtilitiesIn unincorporated Sumter County the one-time water connection (contribution-in-aid-of-construction) charge depends on the district utility serving the parcel and is charged per residential connection; this assumes one connection per unit, and a building on a single connection pays once. North Sumter Utilities, the largest, charges $839 for a 5/8-inch connection. Rates as of October 1, 2025.
- Sewer Connection Fee (Unincorporated Sumter County, MF)$2,336.00Central Sumter UtilitiesCentral Sumter UtilitiesIn unincorporated Sumter County the one-time sewer connection (contribution-in-aid-of-construction) charge depends on the district utility serving the parcel and is charged per residential connection; this assumes one connection per unit, and a building on a single connection pays once. Central Sumter Utilities charges $2,336. Rates as of October 1, 2025.
- Municipal Impact Fees (Unincorporated Sumter County, MF)$0.00N/A (unincorporated)Unincorporated Sumter County levies no municipal impact fees. Multifamily development pays the countywide Sumter County Road Impact Fee and, within the northern Fire & EMS service area, the county Fire Impact Fee, plus water and sewer connection charges from the district utility serving the parcel.
- Road Impact Fee (Sumter County, MF)$1,773.00Mid/High-Rise 4+ floorsSumter CountySumter County Road Impact Fee, multifamily (4+ floors): $1,773 per unit (Phase II, effective 1/1/2026). Levied countywide. Scheduled increases: $1,950 on 1/1/2027 and $2,128 on 1/1/2028. This is the default multifamily tier; units in 1-3 floor buildings pay $2,389.
- Fire Impact Fee (Sumter County Fire & EMS, MF) — Outside fire impact area$0.00Outside fire impact area (incl. The Villages)Sumter CountyMost of unincorporated Sumter County, including The Villages and everything south of Florida's Turnpike, pays no county fire impact fee. The county charges it only in its fire regional impact area, north of the Turnpike and east to The Villages Public Safety Department boundary (see the other option).
Where in Sumter County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Sumter County: Commercial Impact Fees
Commercial development in unincorporated Sumter County pays $4.72 per square foot in impact fees (rates sourced October 29, 2026).
For a 50,000 sq ft building, that comes to at least $235,900.00. The calculator below adjusts to your exact square footage.
The largest line items are Road Impact Fee (Sumter County, Commercial) ($4.72/sq ft).
Sewer Connection Charge (Unincorporated Sumter County) — Central Sumter Utilities, per gallon, Water Connection Charge (Unincorporated Sumter County) — Central Sumter Utilities, per gallon, Sewer Connection Charge (Unincorporated Sumter County) — South Sumter Utilities, $20.94 + $5.23 per gallon, Water Connection Charge (Unincorporated Sumter County) — South Sumter Utilities, per gallon, Water Connection Charge (Unincorporated Sumter County) — North Sumter Utilities, per gallon, Water Connection Charge (Unincorporated Sumter County) — Little Sumter Service Area, per gallon, Sewer Connection Charge (Unincorporated Sumter County) — North Sumter Utilities, per gallon, and Sewer Connection Charge (Unincorporated Sumter County) — Little Sumter Service Area, per gallon are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.
View the Full Sumter County Impact Fee Schedule
- Water Connection Charge (Unincorporated Sumter County) — Central Sumter Utilities, per gallonContact jurisdiction/utility to verifyCentral Sumter UtilitiesCentral Sumter Utilities one-time commercial water contribution in aid of construction: $13.01 per gallon of the project's projected daily flow, rates as of October 1, 2025. Applies to parcels in the Central Sumter service area.
- Water Connection Charge (Unincorporated Sumter County) — South Sumter Utilities, per gallonContact jurisdiction/utility to verifySouth Sumter UtilitiesSouth Sumter Utilities (Wildwood Utility Dependent District) one-time commercial water main extension contribution in aid of construction: $22.28 per gallon of the project's projected daily flow, rates as of October 1, 2025.
- Water Connection Charge (Unincorporated Sumter County) — North Sumter Utilities, per gallonContact jurisdiction/utility to verifyNorth Sumter UtilitiesIn unincorporated Sumter County, commercial water service in The Villages area comes from one of four district utilities, and each charges a one-time water contribution in aid of construction per gallon of the project's projected daily flow (rates as of October 1, 2025): North Sumter Utilities $6.71, Central Sumter Utilities $13.01, Little Sumter Service Area $2.59, South Sumter Utilities $22.28. Parcels outside the district service areas are on private wells or private utilities.
- Water Connection Charge (Unincorporated Sumter County) — Little Sumter Service Area, per gallonContact jurisdiction/utility to verifyLittle Sumter Service AreaLittle Sumter Service Area (Village Center Community Development District) one-time commercial water contribution in aid of construction: $2.59 per gallon of the project's projected daily flow, rates as of October 1, 2025.
- Sewer Connection Charge (Unincorporated Sumter County) — Central Sumter Utilities, per gallonContact jurisdiction/utility to verifyCentral Sumter UtilitiesIn unincorporated Sumter County, commercial sewer service in The Villages area comes from one of four district utilities, and each charges a one-time wastewater contribution in aid of construction per gallon of the project's projected daily flow (rates as of October 1, 2025): Central Sumter Utilities $27.17, North Sumter Utilities $12.59, Little Sumter Service Area $3.54, South Sumter Utilities $26.17 ($20.94 main extension plus $5.23 plant capacity). Parcels outside the district service areas use septic systems or private utilities.
- Sewer Connection Charge (Unincorporated Sumter County) — South Sumter Utilities, $20.94 + $5.23 per gallonContact jurisdiction/utility to verifySouth Sumter UtilitiesSouth Sumter Utilities (Wildwood Utility Dependent District) one-time commercial wastewater contribution in aid of construction: $26.17 per gallon of the project's projected daily flow ($20.94 main extension plus $5.23 plant capacity), rates as of October 1, 2025.
- Sewer Connection Charge (Unincorporated Sumter County) — North Sumter Utilities, per gallonContact jurisdiction/utility to verifyNorth Sumter UtilitiesNorth Sumter Utilities one-time commercial wastewater contribution in aid of construction: $12.59 per gallon of the project's projected daily flow, rates as of October 1, 2025.
- Sewer Connection Charge (Unincorporated Sumter County) — Little Sumter Service Area, per gallonContact jurisdiction/utility to verifyLittle Sumter Service AreaLittle Sumter Service Area (Village Center Community Development District) one-time commercial sewer contribution in aid of construction: $3.54 per gallon of the project's projected daily flow, rates as of October 1, 2025.
- Municipal Impact Fee (Sumter County - Unincorporated, Commercial)$0.00N/A (unincorporated)The unincorporated county has no municipal government, so no city impact fee applies. Commercial development pays the county road impact fee and, inside the Fire and EMS regional impact area, the county fire impact fee.
- Road Impact Fee (Sumter County, Commercial)$4.72/sq ftRetail 40,000-150,000 SFGLASumter CountyCurrent rate effective January 1, 2026 (Phase II of four annual installments) for general retail of 40,000 to 150,000 sq ft GLA. Scheduled increases: $5,190 per 1,000 sq ft on January 1, 2027 and $5,661 on January 1, 2028. Smaller (under 40,000 sq ft) and larger (over 150,000 sq ft) retail are separate tiers. Applies countywide, including in the unincorporated area.
- Fire Impact Fee (Sumter County Fire & EMS, Commercial) — Outside fire impact area$0.00/sq ftOutside fire impact area (incl. The Villages)Sumter County Fire & EMSMost of unincorporated Sumter County, including The Villages and everything south of Florida's Turnpike, pays no county fire impact fee. The county charges it only in its fire regional impact area, north of the Turnpike and east to The Villages Public Safety Department boundary (see the other option).
Where in Sumter County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Sumter County: Industrial Impact Fees
Industrial development in unincorporated Sumter County pays $1.51 per square foot in impact fees (rates sourced October 29, 2026).
For a 50,000 sq ft building, that comes to at least $75,300.00. The calculator below adjusts to your exact square footage.
The largest line items are Road Impact Fee (Sumter County, Industrial) ($1.51/sq ft).
Sewer Connection Charge (Unincorporated Sumter County) — Central Sumter Utilities, per gallon, Water Connection Charge (Unincorporated Sumter County) — Central Sumter Utilities, per gallon, Sewer Connection Charge (Unincorporated Sumter County) — South Sumter Utilities, $20.94 + $5.23 per gallon, Water Connection Charge (Unincorporated Sumter County) — South Sumter Utilities, per gallon, Water Connection Charge (Unincorporated Sumter County) — North Sumter Utilities, per gallon, Water Connection Charge (Unincorporated Sumter County) — Little Sumter Service Area, per gallon, Sewer Connection Charge (Unincorporated Sumter County) — North Sumter Utilities, per gallon, and Sewer Connection Charge (Unincorporated Sumter County) — Little Sumter Service Area, per gallon are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.
View the Full Sumter County Impact Fee Schedule
- Water Connection Charge (Unincorporated Sumter County) — Central Sumter Utilities, per gallonContact jurisdiction/utility to verifyCentral Sumter UtilitiesCentral Sumter Utilities one-time commercial water contribution in aid of construction: $13.01 per gallon of the project's projected daily flow, rates as of October 1, 2025. Applies to parcels in the Central Sumter service area.
- Water Connection Charge (Unincorporated Sumter County) — South Sumter Utilities, per gallonContact jurisdiction/utility to verifySouth Sumter UtilitiesSouth Sumter Utilities (Wildwood Utility Dependent District) one-time commercial water main extension contribution in aid of construction: $22.28 per gallon of the project's projected daily flow, rates as of October 1, 2025.
- Water Connection Charge (Unincorporated Sumter County) — North Sumter Utilities, per gallonContact jurisdiction/utility to verifyNorth Sumter UtilitiesIn unincorporated Sumter County, commercial water service in The Villages area comes from one of four district utilities, and each charges a one-time water contribution in aid of construction per gallon of the project's projected daily flow (rates as of October 1, 2025): North Sumter Utilities $6.71, Central Sumter Utilities $13.01, Little Sumter Service Area $2.59, South Sumter Utilities $22.28. Parcels outside the district service areas are on private wells or private utilities.
- Water Connection Charge (Unincorporated Sumter County) — Little Sumter Service Area, per gallonContact jurisdiction/utility to verifyLittle Sumter Service AreaLittle Sumter Service Area (Village Center Community Development District) one-time commercial water contribution in aid of construction: $2.59 per gallon of the project's projected daily flow, rates as of October 1, 2025.
- Sewer Connection Charge (Unincorporated Sumter County) — Central Sumter Utilities, per gallonContact jurisdiction/utility to verifyCentral Sumter UtilitiesIn unincorporated Sumter County, commercial sewer service in The Villages area comes from one of four district utilities, and each charges a one-time wastewater contribution in aid of construction per gallon of the project's projected daily flow (rates as of October 1, 2025): Central Sumter Utilities $27.17, North Sumter Utilities $12.59, Little Sumter Service Area $3.54, South Sumter Utilities $26.17 ($20.94 main extension plus $5.23 plant capacity). Parcels outside the district service areas use septic systems or private utilities.
- Sewer Connection Charge (Unincorporated Sumter County) — South Sumter Utilities, $20.94 + $5.23 per gallonContact jurisdiction/utility to verifySouth Sumter UtilitiesSouth Sumter Utilities (Wildwood Utility Dependent District) one-time commercial wastewater contribution in aid of construction: $26.17 per gallon of the project's projected daily flow ($20.94 main extension plus $5.23 plant capacity), rates as of October 1, 2025.
- Sewer Connection Charge (Unincorporated Sumter County) — North Sumter Utilities, per gallonContact jurisdiction/utility to verifyNorth Sumter UtilitiesNorth Sumter Utilities one-time commercial wastewater contribution in aid of construction: $12.59 per gallon of the project's projected daily flow, rates as of October 1, 2025.
- Sewer Connection Charge (Unincorporated Sumter County) — Little Sumter Service Area, per gallonContact jurisdiction/utility to verifyLittle Sumter Service AreaLittle Sumter Service Area (Village Center Community Development District) one-time commercial sewer contribution in aid of construction: $3.54 per gallon of the project's projected daily flow, rates as of October 1, 2025.
- Municipal Impact Fee (Sumter County - Unincorporated, Industrial)$0.00N/A (unincorporated)The unincorporated county has no municipal government, so no city impact fee applies. Industrial development pays the county road impact fee and, inside the Fire and EMS regional impact area, the county fire impact fee.
- Road Impact Fee (Sumter County, Industrial)$1.51/sq ftSumter CountyCurrent rate effective January 1, 2026 (Phase II of a four-phase adoption). Scheduled increases: $1,657 per 1,000 sq ft on January 1, 2027; $1,806 on January 1, 2028. Applies countywide, including within incorporated municipalities.
- Fire Impact Fee (Sumter County Fire & EMS, Industrial) — Outside fire impact area$0.00/sq ftOutside fire impact area (incl. The Villages)Sumter County Fire & EMSMost of unincorporated Sumter County, including The Villages and everything south of Florida's Turnpike, pays no county fire impact fee. The county charges it only in its fire regional impact area, north of the Turnpike and east to The Villages Public Safety Department boundary (see the other option).
Where in Sumter County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Sumter County: Office Impact Fees
Office development in unincorporated Sumter County pays $2.96 per square foot in impact fees (rates sourced October 29, 2026).
For a 25,000 sq ft building, that comes to at least $73,975.00. The calculator below adjusts to your exact square footage.
The largest line items are Road Impact Fee (Sumter County, Office) ($2.96/sq ft).
Sewer Connection Charge (Unincorporated Sumter County) — Central Sumter Utilities, per gallon, Water Connection Charge (Unincorporated Sumter County) — Central Sumter Utilities, per gallon, Sewer Connection Charge (Unincorporated Sumter County) — South Sumter Utilities, $20.94 + $5.23 per gallon, Water Connection Charge (Unincorporated Sumter County) — South Sumter Utilities, per gallon, Water Connection Charge (Unincorporated Sumter County) — North Sumter Utilities, per gallon, Water Connection Charge (Unincorporated Sumter County) — Little Sumter Service Area, per gallon, Sewer Connection Charge (Unincorporated Sumter County) — North Sumter Utilities, per gallon, and Sewer Connection Charge (Unincorporated Sumter County) — Little Sumter Service Area, per gallon are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.
View the Full Sumter County Impact Fee Schedule
- Water Connection Charge (Unincorporated Sumter County) — Central Sumter Utilities, per gallonContact jurisdiction/utility to verifyCentral Sumter UtilitiesCentral Sumter Utilities one-time commercial water contribution in aid of construction: $13.01 per gallon of the project's projected daily flow, rates as of October 1, 2025. Applies to parcels in the Central Sumter service area.
- Water Connection Charge (Unincorporated Sumter County) — South Sumter Utilities, per gallonContact jurisdiction/utility to verifySouth Sumter UtilitiesSouth Sumter Utilities (Wildwood Utility Dependent District) one-time commercial water main extension contribution in aid of construction: $22.28 per gallon of the project's projected daily flow, rates as of October 1, 2025.
- Water Connection Charge (Unincorporated Sumter County) — North Sumter Utilities, per gallonContact jurisdiction/utility to verifyNorth Sumter UtilitiesIn unincorporated Sumter County, commercial water service in The Villages area comes from one of four district utilities, and each charges a one-time water contribution in aid of construction per gallon of the project's projected daily flow (rates as of October 1, 2025): North Sumter Utilities $6.71, Central Sumter Utilities $13.01, Little Sumter Service Area $2.59, South Sumter Utilities $22.28. Parcels outside the district service areas are on private wells or private utilities.
- Water Connection Charge (Unincorporated Sumter County) — Little Sumter Service Area, per gallonContact jurisdiction/utility to verifyLittle Sumter Service AreaLittle Sumter Service Area (Village Center Community Development District) one-time commercial water contribution in aid of construction: $2.59 per gallon of the project's projected daily flow, rates as of October 1, 2025.
- Sewer Connection Charge (Unincorporated Sumter County) — Central Sumter Utilities, per gallonContact jurisdiction/utility to verifyCentral Sumter UtilitiesIn unincorporated Sumter County, commercial sewer service in The Villages area comes from one of four district utilities, and each charges a one-time wastewater contribution in aid of construction per gallon of the project's projected daily flow (rates as of October 1, 2025): Central Sumter Utilities $27.17, North Sumter Utilities $12.59, Little Sumter Service Area $3.54, South Sumter Utilities $26.17 ($20.94 main extension plus $5.23 plant capacity). Parcels outside the district service areas use septic systems or private utilities.
- Sewer Connection Charge (Unincorporated Sumter County) — South Sumter Utilities, $20.94 + $5.23 per gallonContact jurisdiction/utility to verifySouth Sumter UtilitiesSouth Sumter Utilities (Wildwood Utility Dependent District) one-time commercial wastewater contribution in aid of construction: $26.17 per gallon of the project's projected daily flow ($20.94 main extension plus $5.23 plant capacity), rates as of October 1, 2025.
- Sewer Connection Charge (Unincorporated Sumter County) — North Sumter Utilities, per gallonContact jurisdiction/utility to verifyNorth Sumter UtilitiesNorth Sumter Utilities one-time commercial wastewater contribution in aid of construction: $12.59 per gallon of the project's projected daily flow, rates as of October 1, 2025.
- Sewer Connection Charge (Unincorporated Sumter County) — Little Sumter Service Area, per gallonContact jurisdiction/utility to verifyLittle Sumter Service AreaLittle Sumter Service Area (Village Center Community Development District) one-time commercial sewer contribution in aid of construction: $3.54 per gallon of the project's projected daily flow, rates as of October 1, 2025.
- Municipal Impact Fee (Sumter County - Unincorporated, Office)$0.00N/A (unincorporated)The unincorporated county has no municipal government, so no city impact fee applies. Office development pays the county road impact fee and, inside the Fire and EMS regional impact area, the county fire impact fee.
- Road Impact Fee (Sumter County, Office)$2.96/sq ftSumter CountyCurrent rate effective January 1, 2026 (Phase II of a four-phase adoption). Scheduled increases: $3,255 per 1,000 sq ft on January 1, 2027; $3,550 on January 1, 2028. Applies countywide, including within incorporated municipalities.
- Fire Impact Fee (Sumter County Fire & EMS, Office) — Outside fire impact area$0.00/sq ftOutside fire impact area (incl. The Villages)Sumter County Fire & EMSMost of unincorporated Sumter County, including The Villages and everything south of Florida's Turnpike, pays no county fire impact fee. The county charges it only in its fire regional impact area, north of the Turnpike and east to The Villages Public Safety Department boundary (see the other option).
Sumter County Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Sumter County Impact Fee FAQs
What are single-family impact fees in Sumter County, Florida?
A new single-family home in unincorporated Sumter County pays $6,507.00 per unit in impact fees (rates sourced October 29, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.
How much are multifamily impact fees in Sumter County?
Multifamily development in unincorporated Sumter County pays $4,948.00 per unit in impact fees (rates sourced October 29, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.
How much are commercial impact fees in Sumter County?
Commercial development in unincorporated Sumter County pays $4.72 per square foot in impact fees, at least $235,900.00 for a 50,000 sq ft building. 8 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does The Villages pay Sumter County impact fees?
Only in part. The Villages spans Sumter, Lake and Marion counties, and parts of it sit inside Wildwood, Lady Lake and Fruitland Park, so the fee depends on which jurisdiction a parcel is in. Search the address in the calculator below to see the schedule that applies.
See also: Lake County Impact Fees, Marion County Impact Fees, Wildwood Impact Fees, Lady Lake Impact Fees, Fruitland Park Impact Fees.
Do cities in Sumter County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 3 of 5 cities in Sumter County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.