A new single-family home in Wildwood pays $10,681.24 per unit in impact fees (rates sourced July 18, 2026). Of that, Sumter County-levied fees account for $4,305.00 and municipal or utility fees for $6,376.24.
The largest line items are Sewer System Development Charge (City of Wildwood) ($3,710.00), Road Impact Fee (Sumter County) ($3,332.00) and Water System Development Charge (City of Wildwood) ($1,950.00).
View the full Wildwood impact fee schedule
- Water System Development Charge (City of Wildwood)$1,950.00City of WildwoodCity of Wildwood water System Development Charge: $1,950 per ERC. A single-family home equals one ERC. Effective 1/1/2026.
- Sewer System Development Charge (City of Wildwood)$3,710.00City of WildwoodCity of Wildwood sewer System Development Charge: $3,710 per ERC. A single-family home equals one ERC. Effective 1/1/2026.
- Recreation Impact Fee (City of Wildwood)$412.09City of WildwoodCity of Wildwood Recreation Impact Fee: $412.09 per dwelling unit. Effective 1/1/2026.
- Law Enforcement Impact Fee (City of Wildwood)$304.15City of WildwoodCity of Wildwood Law Enforcement Impact Fee: $304.15 per dwelling unit. Effective 1/1/2026.
- Road Impact Fee (Sumter County)$3,332.00Sumter CountySumter County Road Impact Fee, single-family detached: $3,332 per home (Phase II, effective 1/1/2026). Levied countywide, including in incorporated cities. Scheduled increases: $3,665 on 1/1/2027 and $3,999 on 1/1/2028.
- Fire Impact Fee (Sumter County Fire & EMS)$973.00Sumter CountySumter County Fire Impact Fee: $973 per single-family or multi-family lot (effective 1/1/2025). Applies only to Wildwood parcels within the Sumter County Fire & EMS service area (north of Florida's Turnpike, along the US-301 corridor); coverage is parcel-specific. Manufactured home $776; age-restricted lot $585.
Where in Sumter County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Wildwood: Multifamily Impact Fees
A new multifamily unit in Wildwood pays $3,462.24 per unit in impact fees (rates sourced July 18, 2026). Of that, Sumter County-levied fees account for $2,746.00 and municipal or utility fees for $716.24.
The largest line items are Road Impact Fee (Sumter County, MF) ($1,773.00), Fire Impact Fee (Sumter County Fire & EMS, MF) ($973.00) and Recreation Impact Fee (City of Wildwood, MF) ($412.09).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Wildwood impact fee schedule
- Water System Development Charge (City of Wildwood, MF)$0.00City of WildwoodCity of Wildwood water System Development Charge: $1,950 per ERC (effective 1/1/2026). For multifamily, the ERCs per unit are set by the project's engineered demand rather than a flat per-unit rate.
- Sewer System Development Charge (City of Wildwood, MF)$0.00City of WildwoodCity of Wildwood sewer System Development Charge: $3,710 per ERC (effective 1/1/2026). For multifamily, the ERCs per unit are set by the project's engineered demand rather than a flat per-unit rate.
- Recreation Impact Fee (City of Wildwood, MF)$412.09City of WildwoodCity of Wildwood Recreation Impact Fee: $412.09 per dwelling unit. Effective 1/1/2026.
- Law Enforcement Impact Fee (City of Wildwood, MF)$304.15City of WildwoodCity of Wildwood Law Enforcement Impact Fee: $304.15 per dwelling unit. Effective 1/1/2026.
- Road Impact Fee (Sumter County, MF)$1,773.00Mid/High-Rise 4+ floorsSumter CountySumter County Road Impact Fee, multifamily (4+ floors): $1,773 per unit (Phase II, effective 1/1/2026). Levied countywide. Scheduled increases: $1,950 on 1/1/2027 and $2,128 on 1/1/2028. This is the default multifamily tier; units in 1-3 floor buildings pay $2,389.
- Fire Impact Fee (Sumter County Fire & EMS, MF)$973.00Sumter CountySumter County Fire Impact Fee: $973 per single-family or multi-family lot (effective 1/1/2025). Applies only to Wildwood parcels within the Sumter County Fire & EMS service area (north of Florida's Turnpike, along the US-301 corridor); coverage is parcel-specific.
Where in Sumter County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Wildwood: Commercial Impact Fees
Commercial development in Wildwood pays $6.60 per square foot in impact fees, plus $5,660.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $335,460.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Development Charge (City of Wildwood) ($3,710.00 one-time), Water System Development Charge (City of Wildwood) ($1,950.00 one-time) and Road Impact Fee (Sumter County, Commercial) ($4.72/sq ft).
Fire Impact Fee (Sumter County Fire & EMS, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full Wildwood impact fee schedule
- Water System Development Charge (City of Wildwood)$1,950.00 one-timeCity of WildwoodWater system development charge of $1,950 per ERC (1 ERC = 300 gpd), effective January 1, 2026. The nonresidential charge is based on the development's estimated average daily flow; the amount shown is the one-ERC minimum.
- Sewer System Development Charge (City of Wildwood)$3,710.00 one-timeCity of WildwoodSewer system development charge of $3,710 per ERC (1 ERC = 250 gpd), effective January 1, 2026. The nonresidential charge is based on the development's estimated average daily flow; the amount shown is the one-ERC minimum.
- Law Enforcement Impact Fee (City of Wildwood, Commercial)$0.19/sq ftCity of WildwoodEffective January 1, 2026. A single nonresidential rate applies to all commercial, office, and industrial uses.
- Recreation Impact Fee (City of Wildwood, Commercial)$0.00City of WildwoodWildwood's recreation impact fee applies to residential development only; no recreation impact fee is charged on nonresidential development.
- Road Impact Fee (Sumter County, Commercial)$4.72/sq ftSumter CountyCurrent rate effective January 1, 2026 (Phase II of a four-phase adoption). Scheduled increases: $5,190 per 1,000 sq ft on January 1, 2027; $5,661 on January 1, 2028. Applies countywide, including within incorporated municipalities.
- Fire Impact Fee (Sumter County Fire & EMS, Commercial)$1.69/sq ftRequires confirmationSumter County Fire & EMSEffective January 1, 2025. Applies only to development within the county's Fire & EMS Regional Impact Area (the northern US-301 corridor, north of Florida's Turnpike to The Villages PSD boundary). Only Wildwood parcels inside that boundary pay this fee.
Where in Sumter County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Wildwood: Industrial Impact Fees
Industrial development in Wildwood pays $1.97 per square foot in impact fees, plus $5,660.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $104,310.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Development Charge (City of Wildwood) ($3,710.00 one-time), Water System Development Charge (City of Wildwood) ($1,950.00 one-time) and Road Impact Fee (Sumter County, Industrial) ($1.51/sq ft).
Fire Impact Fee (Sumter County Fire & EMS, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full Wildwood impact fee schedule
- Water System Development Charge (City of Wildwood)$1,950.00 one-timeCity of WildwoodWater system development charge of $1,950 per ERC (1 ERC = 300 gpd), effective January 1, 2026. The nonresidential charge is based on the development's estimated average daily flow; the amount shown is the one-ERC minimum.
- Sewer System Development Charge (City of Wildwood)$3,710.00 one-timeCity of WildwoodSewer system development charge of $3,710 per ERC (1 ERC = 250 gpd), effective January 1, 2026. The nonresidential charge is based on the development's estimated average daily flow; the amount shown is the one-ERC minimum.
- Law Enforcement Impact Fee (City of Wildwood, Industrial)$0.19/sq ftCity of WildwoodEffective January 1, 2026. A single nonresidential rate applies to all commercial, office, and industrial uses.
- Recreation Impact Fee (City of Wildwood, Industrial)$0.00City of WildwoodWildwood's recreation impact fee applies to residential development only; no recreation impact fee is charged on nonresidential development.
- Road Impact Fee (Sumter County, Industrial)$1.51/sq ftSumter CountyCurrent rate effective January 1, 2026 (Phase II of a four-phase adoption). Scheduled increases: $1,657 per 1,000 sq ft on January 1, 2027; $1,806 on January 1, 2028. Applies countywide, including within incorporated municipalities.
- Fire Impact Fee (Sumter County Fire & EMS, Industrial)$0.28/sq ftRequires confirmationSumter County Fire & EMSEffective January 1, 2025. Applies only to development within the county's Fire & EMS Regional Impact Area (the northern US-301 corridor, north of Florida's Turnpike to The Villages PSD boundary). Only Wildwood parcels inside that boundary pay this fee.
Where in Sumter County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Wildwood: Office Impact Fees
Office development in Wildwood pays $3.73 per square foot in impact fees, plus $5,660.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 25,000 sq ft building, that comes to about $99,010.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer System Development Charge (City of Wildwood) ($3,710.00 one-time), Water System Development Charge (City of Wildwood) ($1,950.00 one-time) and Road Impact Fee (Sumter County, Office) ($2.96/sq ft).
Fire Impact Fee (Sumter County Fire & EMS, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full Wildwood impact fee schedule
- Water System Development Charge (City of Wildwood)$1,950.00 one-timeCity of WildwoodWater system development charge of $1,950 per ERC (1 ERC = 300 gpd), effective January 1, 2026. The nonresidential charge is based on the development's estimated average daily flow; the amount shown is the one-ERC minimum.
- Sewer System Development Charge (City of Wildwood)$3,710.00 one-timeCity of WildwoodSewer system development charge of $3,710 per ERC (1 ERC = 250 gpd), effective January 1, 2026. The nonresidential charge is based on the development's estimated average daily flow; the amount shown is the one-ERC minimum.
- Law Enforcement Impact Fee (City of Wildwood, Office)$0.19/sq ftCity of WildwoodEffective January 1, 2026. A single nonresidential rate applies to all commercial, office, and industrial uses.
- Recreation Impact Fee (City of Wildwood, Office)$0.00City of WildwoodWildwood's recreation impact fee applies to residential development only; no recreation impact fee is charged on nonresidential development.
- Road Impact Fee (Sumter County, Office)$2.96/sq ftSumter CountyCurrent rate effective January 1, 2026 (Phase II of a four-phase adoption). Scheduled increases: $3,255 per 1,000 sq ft on January 1, 2027; $3,550 on January 1, 2028. Applies countywide, including within incorporated municipalities.
- Fire Impact Fee (Sumter County Fire & EMS, Office)$0.58/sq ftRequires confirmationSumter County Fire & EMSEffective January 1, 2025. Applies only to development within the county's Fire & EMS Regional Impact Area (the northern US-301 corridor, north of Florida's Turnpike to The Villages PSD boundary). Only Wildwood parcels inside that boundary pay this fee.
Where in Sumter County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Wildwood impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Wildwood impact fee FAQs
What are the total impact fees for a single-family home in Wildwood, Florida?
A new single-family home in Wildwood pays $10,681.24 per unit in combined impact fees (rates sourced July 18, 2026).
How much are commercial impact fees in Wildwood?
Commercial development in Wildwood pays $6.60 per square foot in impact fees, plus $5,660.00 in one-time water and sewer connection fees, about $335,460.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Wildwood charge its own impact fees?
Yes. Wildwood levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Wildwood, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Sumter County impact fees page.