Wildwood, Florida Impact Fees

Wildwood applies its own fee schedule: municipal fees plus the Sumter County-levied fees that apply inside city limits. Combined, a new single-family home pays $10,681.24 per unit (rates sourced July 18, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Wildwood impact fees by project type

Wildwood: Single-Family Impact Fees

A new single-family home in Wildwood pays $10,681.24 per unit in impact fees (rates sourced July 18, 2026). Of that, Sumter County-levied fees account for $4,305.00 and municipal or utility fees for $6,376.24.

The largest line items are Sewer System Development Charge (City of Wildwood) ($3,710.00), Road Impact Fee (Sumter County) ($3,332.00) and Water System Development Charge (City of Wildwood) ($1,950.00).

Fire Impact Fee (Sumter County Fire & EMS) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$1,950.00
  • Water System Development Charge (City of Wildwood)
    City of Wildwood
    City of Wildwood Water SDC $1,950.00 per ERC (1 ERC = 300 gpd). Source: 'Impact Fees (as of January 1, 2026)' PDF, Development Services. SFR = 1 ERC. Confirmed via Google viewer 7/16/2026.
    $1,950.00
Sewer$3,710.00
  • Sewer System Development Charge (City of Wildwood)
    City of Wildwood
    City of Wildwood Sewer SDC $3,710.00 per ERC (1 ERC = 250 gpd). Source: 'Impact Fees (as of January 1, 2026)' PDF, Development Services. SFR = 1 ERC. Confirmed via Google viewer 7/16/2026.
    $3,710.00
City$716.24
  • Recreation Impact Fee (City of Wildwood)
    City of Wildwood
    City of Wildwood Recreation Impact Fee $412.09 per dwelling unit (residential), eff 1/1/2026. Source: 'Impact Fees (as of January 1, 2026)' PDF. Confirmed via Google viewer 7/16/2026.
    $412.09
  • Law Enforcement Impact Fee (City of Wildwood)
    City of Wildwood
    City of Wildwood Law Enforcement Impact Fee $304.15 per dwelling unit (residential), eff 1/1/2026. Source: 'Impact Fees (as of January 1, 2026)' PDF. Confirmed via Google viewer 7/16/2026.
    $304.15
County$4,305.00
  • Road Impact Fee (Sumter County)
    Sumter County
    Sumter County Road Impact Fee applies in City of Wildwood. CURRENT=Phase II eff 1/1/2026, Single Family Detached $3,332. Phase III 1/1/2027 $3,665; Phase IV 1/1/2028 $3,999. (Separate from Wildwood's own municipal impact fees.)
    $3,332.00
  • Fire Impact Fee (Sumter County Fire & EMS)
    Sumter County
    Sumter County Fire Impact Fee $973/SF-or-MF lot (eff 1/1/2025) applies to new development within the Sumter County Fire & EMS service area (N of Florida's Turnpike, E to Villages PSD boundary), which includes areas along the US-301 corridor near/in Wildwood. ⚠️VERIFY which Wildwood parcels fall within the boundary: Sumter Co 352-689-4400.
    $973.00Requires confirmation
Total (Wildwood): $10,681.24
Sources last checked July 18, 2026Official fee schedules:City of Wildwood Sumter County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Wildwood: Multifamily Impact Fees

A new multifamily unit in Wildwood pays at least $3,462.24 per unit in impact fees (rates sourced July 18, 2026). Of that, Sumter County-levied fees account for $2,746.00 and municipal or utility fees for $716.24.

The largest line items are Road Impact Fee (Sumter County, MF) ($1,773.00), Recreation Impact Fee (City of Wildwood, MF) ($412.09) and Law Enforcement Impact Fee (City of Wildwood, MF) ($304.15).

Fire Impact Fee (Sumter County Fire & EMS, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer System Development Charge (City of Wildwood, MF) and Water System Development Charge (City of Wildwood, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water System Development Charge (City of Wildwood, MF)
    City of Wildwood
    City of Wildwood Water SDC $1,950.00 per ERC (1 ERC = 300 gpd), eff 1/1/2026. MF per-unit ERC is engineer-determined (not a published per-unit rate) — amount left $0 pending project ERC. Dev Services 352-330-1336.
    Requires confirmation
Sewer$0.00
  • Sewer System Development Charge (City of Wildwood, MF)
    City of Wildwood
    City of Wildwood Sewer SDC $3,710.00 per ERC (1 ERC = 250 gpd), eff 1/1/2026. MF per-unit ERC is engineer-determined (not a published per-unit rate) — amount left $0 pending project ERC. Dev Services 352-330-1336.
    Requires confirmation
City$716.24
  • Recreation Impact Fee (City of Wildwood, MF)
    City of Wildwood
    City of Wildwood Recreation Impact Fee $412.09 per dwelling unit (residential, all types), eff 1/1/2026. Source: 'Impact Fees (as of January 1, 2026)' PDF. Confirmed via Google viewer 7/16/2026.
    $412.09
  • Law Enforcement Impact Fee (City of Wildwood, MF)
    City of Wildwood
    City of Wildwood Law Enforcement Impact Fee $304.15 per dwelling unit (residential, all types), eff 1/1/2026. Source: 'Impact Fees (as of January 1, 2026)' PDF. Confirmed via Google viewer 7/16/2026.
    $304.15
County$2,746.00
  • Road Impact Fee (Sumter County, MF)
    Sumter County
    Sumter County Road Impact Fee (MF 4+ floors) applies in City of Wildwood. Phase II eff 1/1/2026 $1,773/du. Default MF tier. Separate from Wildwood's own municipal impact fees.
    $1,773.00
  • Fire Impact Fee (Sumter County Fire & EMS, MF)
    Sumter County
    Sumter County Fire Impact Fee $973 per SF-or-MF lot (eff 1/1/2025), applies to new development within the Sumter County Fire & EMS service area near/in Wildwood (US-301, N of Turnpike). ⚠️VERIFY which Wildwood parcels are within the boundary: 352-689-4400.
    $973.00Requires confirmation
Total (Wildwood): $3,462.24
Sources last checked July 18, 2026Official fee schedules:City of Wildwood Sumter County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Wildwood: Commercial Impact Fees

Commercial development in Wildwood pays $6.60 per square foot in impact fees, plus $5,660.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $335,460.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Development Charge (City of Wildwood) ($3,710.00 one-time), Water System Development Charge (City of Wildwood) ($1,950.00 one-time) and Road Impact Fee (Sumter County, Commercial) ($4.72/sq ft).

Fire Impact Fee (Sumter County Fire & EMS, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$1,950.00 one-time
  • Water System Development Charge (City of Wildwood)
    City of Wildwood
    Water SDC = $1,950.00 per ERC (1 ERC = 300 gpd). Source: City of Wildwood 'Impact Fees (as of January 1, 2026)', Development Services. Nonres ERC count = development avg daily flow ÷ 300 gpd, engineer-determined — NO meter-size table. 1-ERC minimum entered as default.
    $1,950.00 one-time
Sewer$3,710.00 one-time
  • Sewer System Development Charge (City of Wildwood)
    City of Wildwood
    Sewer SDC = $3,710.00 per ERC (1 ERC = 250 gpd). Source: City of Wildwood 'Impact Fees (as of January 1, 2026)', Development Services. Nonres ERC count = development avg daily flow ÷ 250 gpd, engineer-determined — NO meter-size table. 1-ERC minimum entered as default.
    $3,710.00 one-time
City$0.19/sq ft
  • Law Enforcement Impact Fee (City of Wildwood, Commercial)
    City of Wildwood
    City of Wildwood Law Enforcement Impact Fee, nonresidential = $0.19 per square foot (single nonres rate — no land-use category split in schedule). Source: City of Wildwood 'Impact Fees (as of January 1, 2026)', Development Services. Residential rate is $304.15/dwelling unit (separate).
    $0.19/sq ft
  • Recreation Impact Fee (City of Wildwood, Commercial)
    City of Wildwood
    City of Wildwood Recreation Impact Fee applies to RESIDENTIAL only ($412.09/dwelling unit). The adopted 'Impact Fees (as of 1/1/2026)' schedule lists NO nonresidential recreation rate — nonres = $0 (not applicable). Confirmed.
    $0.00
County$6.41/sq ft
  • Road Impact Fee (Sumter County, Commercial)
    Sumter County
    Sumter County Road Impact Fee — §20-66 (Ord. 2024-30; Benesch 5/14/2024; 40% of max). Applies COUNTYWIDE incl. City of Wildwood (§20-33(3), §20-35). Schedule row: ITE 821 Retail 40,000–150,000 sfgla = $4,718 per 1,000 sfgla (GLA). CURRENT = Phase II eff 1/1/2026; Phase III 1/1/2027 $5,190; Phase IV 1/1/2028 $5,661.
    $4.72/sq ft
  • Fire Impact Fee (Sumter County Fire & EMS, Commercial)
    Sumter County Fire & EMS
    Sumter County Fire Impact Fee — Code Ch.6 Art.VII §6-185 (adopted 9/17/2024; Benesch study 4/24/2024; eff 1/1/2025; flat, no phase-in). Schedule row ITE 821 Retail 40,000–150,000 sfgla = $1,688 per 1,000 sfgla. Applies ONLY within the Fire & EMS Regional Impact Area (N of Florida's Turnpike, E to The Villages PSD boundary; US-301 corridor). ⚠️Only Wildwood parcels inside that boundary pay — verify parcel coverage via Sumter County GIS / Dev Services 352-689-4400.
    $1.69/sq ftRequires confirmation
Total (Wildwood): $6.60/sq ft + $5,660.00 one-time (≈ $335,460.00 at 50,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:City of Wildwood Sumter County Sumter County Fire & EMS
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Wildwood: Industrial Impact Fees

Industrial development in Wildwood pays $1.97 per square foot in impact fees, plus $5,660.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $104,310.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Development Charge (City of Wildwood) ($3,710.00 one-time), Water System Development Charge (City of Wildwood) ($1,950.00 one-time) and Road Impact Fee (Sumter County, Industrial) ($1.51/sq ft).

Fire Impact Fee (Sumter County Fire & EMS, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$1,950.00 one-time
  • Water System Development Charge (City of Wildwood)
    City of Wildwood
    Water SDC = $1,950.00 per ERC (1 ERC = 300 gpd). Source: City of Wildwood 'Impact Fees (as of January 1, 2026)', Development Services. Nonres ERC count = development avg daily flow ÷ 300 gpd, engineer-determined — NO meter-size table. 1-ERC minimum entered as default.
    $1,950.00 one-time
Sewer$3,710.00 one-time
  • Sewer System Development Charge (City of Wildwood)
    City of Wildwood
    Sewer SDC = $3,710.00 per ERC (1 ERC = 250 gpd). Source: City of Wildwood 'Impact Fees (as of January 1, 2026)', Development Services. Nonres ERC count = development avg daily flow ÷ 250 gpd, engineer-determined — NO meter-size table. 1-ERC minimum entered as default.
    $3,710.00 one-time
City$0.19/sq ft
  • Law Enforcement Impact Fee (City of Wildwood, Industrial)
    City of Wildwood
    City of Wildwood Law Enforcement Impact Fee, nonresidential = $0.19 per square foot (single nonres rate — no land-use category split). Source: 'Impact Fees (as of January 1, 2026)'. Residential $304.15/dwelling unit.
    $0.19/sq ft
  • Recreation Impact Fee (City of Wildwood, Industrial)
    City of Wildwood
    City of Wildwood Recreation Impact Fee applies to RESIDENTIAL only ($412.09/dwelling unit). Adopted 'Impact Fees (as of 1/1/2026)' lists NO nonresidential recreation rate — nonres = $0 (not applicable). Confirmed.
    $0.00
County$1.78/sq ft
  • Road Impact Fee (Sumter County, Industrial)
    Sumter County
    Sumter County Road Impact Fee — §20-66 (Ord. 2024-30; Benesch 5/14/2024; 40% of max). Applies COUNTYWIDE incl. Wildwood. Schedule row: ITE 110 General Light Industrial = $1,506 per 1,000 sf (GFA). CURRENT = Phase II eff 1/1/2026; Phase III 1/1/2027 $1,657; Phase IV 1/1/2028 $1,806.
    $1.51/sq ft
  • Fire Impact Fee (Sumter County Fire & EMS, Industrial)
    Sumter County Fire & EMS
    Sumter County Fire Impact Fee — Code Ch.6 Art.VII §6-185 (adopted 9/17/2024; Benesch 4/24/2024; eff 1/1/2025; flat). Schedule row ITE 110 General Light Industrial = $277 per 1,000 sf. Applies ONLY within Fire & EMS Regional Impact Area (N of Turnpike to Villages PSD boundary). ⚠️Verify Wildwood parcel coverage via Sumter GIS / 352-689-4400.
    $0.28/sq ftRequires confirmation
Total (Wildwood): $1.97/sq ft + $5,660.00 one-time (≈ $104,310.00 at 50,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:City of Wildwood Sumter County Sumter County Fire & EMS
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Wildwood: Office Impact Fees

Office development in Wildwood pays $3.73 per square foot in impact fees, plus $5,660.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 25,000 sq ft building, that comes to about $99,010.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Development Charge (City of Wildwood) ($3,710.00 one-time), Water System Development Charge (City of Wildwood) ($1,950.00 one-time) and Road Impact Fee (Sumter County, Office) ($2.96/sq ft).

Fire Impact Fee (Sumter County Fire & EMS, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$1,950.00 one-time
  • Water System Development Charge (City of Wildwood)
    City of Wildwood
    Water SDC = $1,950.00 per ERC (1 ERC = 300 gpd). Source: City of Wildwood 'Impact Fees (as of January 1, 2026)', Development Services. Nonres ERC count = development avg daily flow ÷ 300 gpd, engineer-determined — NO meter-size table. 1-ERC minimum entered as default.
    $1,950.00 one-time
Sewer$3,710.00 one-time
  • Sewer System Development Charge (City of Wildwood)
    City of Wildwood
    Sewer SDC = $3,710.00 per ERC (1 ERC = 250 gpd). Source: City of Wildwood 'Impact Fees (as of January 1, 2026)', Development Services. Nonres ERC count = development avg daily flow ÷ 250 gpd, engineer-determined — NO meter-size table. 1-ERC minimum entered as default.
    $3,710.00 one-time
City$0.19/sq ft
  • Law Enforcement Impact Fee (City of Wildwood, Office)
    City of Wildwood
    City of Wildwood Law Enforcement Impact Fee, nonresidential = $0.19 per square foot (single nonres rate — no land-use category split). Source: 'Impact Fees (as of January 1, 2026)'. Residential $304.15/dwelling unit.
    $0.19/sq ft
  • Recreation Impact Fee (City of Wildwood, Office)
    City of Wildwood
    City of Wildwood Recreation Impact Fee applies to RESIDENTIAL only ($412.09/dwelling unit). Adopted 'Impact Fees (as of 1/1/2026)' lists NO nonresidential recreation rate — nonres = $0 (not applicable). Confirmed.
    $0.00
County$3.54/sq ft
  • Road Impact Fee (Sumter County, Office)
    Sumter County
    Sumter County Road Impact Fee — §20-66 (Ord. 2024-30; Benesch 5/14/2024; 40% of max). Applies COUNTYWIDE incl. Wildwood. Schedule row: ITE 710 General Office = $2,959 per 1,000 sf (GFA). CURRENT = Phase II eff 1/1/2026; Phase III 1/1/2027 $3,255; Phase IV 1/1/2028 $3,550.
    $2.96/sq ft
  • Fire Impact Fee (Sumter County Fire & EMS, Office)
    Sumter County Fire & EMS
    Sumter County Fire Impact Fee — Code Ch.6 Art.VII §6-185 (adopted 9/17/2024; Benesch 4/24/2024; eff 1/1/2025; flat). Schedule row ITE 710 General Office = $585 per 1,000 sf. Applies ONLY within Fire & EMS Regional Impact Area (N of Turnpike to Villages PSD boundary). ⚠️Verify Wildwood parcel coverage via Sumter GIS / 352-689-4400.
    $0.58/sq ftRequires confirmation
Total (Wildwood): $3.73/sq ft + $5,660.00 one-time (≈ $99,010.00 at 25,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:City of Wildwood Sumter County Sumter County Fire & EMS
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Wildwood

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Wildwood, Florida?

A new single-family home in Wildwood pays $10,681.24 per unit in combined impact fees (rates sourced July 18, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Wildwood?

Commercial development in Wildwood pays $6.60 per square foot in impact fees, plus $5,660.00 in one-time water and sewer connection fees, about $335,460.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Wildwood charge its own impact fees?

Yes. Wildwood levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Wildwood, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Sumter County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.