Webster, Florida Impact Fees

Webster applies its own fee schedule: municipal fees plus the Sumter County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $3,332.00 per unit (rates sourced July 18, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Webster impact fees by project type

Webster: Single-Family Impact Fees

A new single-family home in Webster pays at least $3,332.00 per unit in impact fees (rates sourced July 18, 2026). All of it is levied by Sumter County.

The largest line items are Road Impact Fee (Sumter County) ($3,332.00).

Water Connection/Capacity Fee (City of Webster) and Sewer Connection/Capacity Fee (City of Webster) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (City of Webster)
    City of Webster
    HELD 8/5/2026 (adversarial verification): the per-ERC base rates are correct as researched, but Webster Code Sec. 38-154(c)(3) mandates an automatic FPSC price-index adjustment every May 1 beginning 5/1/2026, which has already fired; the Municode snapshot is the pre-index base and the current adopted amount is not published. Do not publish the pre-index figure. City of Webster Code Ch. 38 Art. V (Water Utility Public Facilities and Wastewater Utility Public Facilities Impact Fees), added by Ord. No. 2022-03 (3-24-2022) and amended by Ord. No. 2025-25 (5-15-2025). Sec. 38-154(c): water impact fee $3,000.00 per ERC (454 GPD = 1 ERC); wastewater impact fee $4,760.00 per ERC (380 GPD = 1 ERC). Sec. 38-153 defines ERC as 'a unit of measurement that approximates the average demand of an individually metered single-family residential dwelling unit,' so a detached single-family house is 1.0 ERC. Sec. 38-154(c)(3) adds an annual adjustment each May 1 beginning 5/1/2026 per the Florida PSC price index, so the current figure may be marginally above the codified base. Fees are due at building permit issuance. Code current through Ord. No. 2025-27, 6-19-2025. Note the city's own study cites wastewater Fac. ID FLA188697, which the FDEP registry shows as the Bushnell municipal wastewater facility; Webster nonetheless levies its own wastewater impact fee and installs sewer stub-outs (Sec. 38-1). 8/5/2026
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (City of Webster)
    City of Webster
    HELD 8/5/2026 (adversarial verification): the per-ERC base rates are correct as researched, but Webster Code Sec. 38-154(c)(3) mandates an automatic FPSC price-index adjustment every May 1 beginning 5/1/2026, which has already fired; the Municode snapshot is the pre-index base and the current adopted amount is not published. Do not publish the pre-index figure. City of Webster Code Ch. 38 Art. V (Water Utility Public Facilities and Wastewater Utility Public Facilities Impact Fees), added by Ord. No. 2022-03 (3-24-2022) and amended by Ord. No. 2025-25 (5-15-2025). Sec. 38-154(c): water impact fee $3,000.00 per ERC (454 GPD = 1 ERC); wastewater impact fee $4,760.00 per ERC (380 GPD = 1 ERC). Sec. 38-153 defines ERC as 'a unit of measurement that approximates the average demand of an individually metered single-family residential dwelling unit,' so a detached single-family house is 1.0 ERC. Sec. 38-154(c)(3) adds an annual adjustment each May 1 beginning 5/1/2026 per the Florida PSC price index, so the current figure may be marginally above the codified base. Fees are due at building permit issuance. Code current through Ord. No. 2025-27, 6-19-2025. Note the city's own study cites wastewater Fac. ID FLA188697, which the FDEP registry shows as the Bushnell municipal wastewater facility; Webster nonetheless levies its own wastewater impact fee and installs sewer stub-outs (Sec. 38-1). 8/5/2026
    Requires confirmation
City$0.00
  • Municipal Impact Fees (City of Webster)
    City of Webster
    No municipal (parks/police/fire) impact fees adopted in the City of Webster Code (Municode scan). Road demand covered by the countywide Sumter County Road Impact Fee. Confirmed $0.
    $0.00
County$3,332.00
  • Road Impact Fee (Sumter County)
    Sumter County
    Sumter County Road Impact Fee applies within incorporated cities. Single-family detached $3,332 (Phase II, eff 1/1/2026); Phase III 1/1/2027 $3,665; Phase IV 1/1/2028 $3,999.
    $3,332.00
Total (Webster): $3,332.00
Sources last checked July 18, 2026Official fee schedules:City of Webster Sumter County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Webster: Multifamily Impact Fees

A new multifamily unit in Webster pays at least $1,773.00 per unit in impact fees (rates sourced July 18, 2026). All of it is levied by Sumter County.

The largest line items are Road Impact Fee (Sumter County, MF) ($1,773.00).

Sewer Connection/Capacity Fee (City of Webster, MF) and Water Connection/Capacity Fee (City of Webster, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (City of Webster, MF)
    City of Webster
    Webster imposes its water and wastewater impact fees per ERC - $3,000.00 per ERC for water and $4,760.00 per ERC for wastewater (Sec. 38-154(c), Ord. 2022-03 as amended by Ord. 2025-25). 'Residential' is defined to include multi-family (Sec. 38-153), but the article publishes no multifamily ERC factor and no per-dwelling-unit table: ERCs are derived from flow (1 ERC = 454 GPD water / 380 GPD wastewater) against a definition tied to an 'individually metered single-family residential dwelling unit.' A 2-bed/1,000 sq ft apartment would fall below 1.0 ERC on a flow basis but the code does not publish the factor, so the per-unit amount cannot be derived from a published source. Not stretched into a number. 8/5/2026
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (City of Webster, MF)
    City of Webster
    Webster imposes its water and wastewater impact fees per ERC - $3,000.00 per ERC for water and $4,760.00 per ERC for wastewater (Sec. 38-154(c), Ord. 2022-03 as amended by Ord. 2025-25). 'Residential' is defined to include multi-family (Sec. 38-153), but the article publishes no multifamily ERC factor and no per-dwelling-unit table: ERCs are derived from flow (1 ERC = 454 GPD water / 380 GPD wastewater) against a definition tied to an 'individually metered single-family residential dwelling unit.' A 2-bed/1,000 sq ft apartment would fall below 1.0 ERC on a flow basis but the code does not publish the factor, so the per-unit amount cannot be derived from a published source. Not stretched into a number. 8/5/2026
    Requires confirmation
City$0.00
County$1,773.00
  • Road Impact Fee (Sumter County, MF)
    Mid/High-Rise 4+ floors
    Sumter County
    Sumter County Road Impact Fee, multifamily mid/high-rise (4+ floors, LUC 221/222) $1,773/unit (Phase II, eff 1/1/2026). Applies in Webster. Default MF tier (canonical 4-story unit).
    $1,773.00
Total (Webster): $1,773.00
Sources last checked July 18, 2026Official fee schedules:City of Webster Sumter County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Webster: Commercial Impact Fees

Commercial development in Webster pays $4.72 per square foot in impact fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to at least $235,900.00. The calculator below adjusts to your exact square footage.

The largest line items are Road Impact Fee (Sumter County, Commercial) ($4.72/sq ft).

Water Connection/Capacity Fee (City of Webster) and Sewer Connection/Capacity Fee (City of Webster) are set by the utility and not published online. Municipal Impact Fee (City of Webster, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (City of Webster)
    City of Webster
    $0 placeholder — UNCONFIRMED. City of Webster runs its own municipal water; nonres connection/capacity fee not published (posted Water Utility Rates PDF is monthly rates only). Call City Hall 352-793-2073.
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (City of Webster)
    City of Webster
    $0 placeholder — UNCONFIRMED. City of Webster runs its own wastewater utility; nonres sewer connection/capacity fee amount not published online. Call City Hall 352-793-2073.
    Requires confirmation
City$0.00
County$4.72/sq ft
  • Road Impact Fee (Sumter County, Commercial)
    Sumter County
    Sumter County Road Impact Fee — §20-66 (Ord. 2024-30; Benesch 5/14/2024; 40% of max). Applies COUNTYWIDE incl. cities (§20-33(3), §20-35). Schedule row: ITE 821 Retail 40,000–150,000 sfgla = $4,718 per 1,000 sfgla (GLA). CURRENT = Phase II eff 1/1/2026; Phase III 1/1/2027 $5,190; Phase IV 1/1/2028 $5,661.
    $4.72/sq ft
Total (Webster): $4.72/sq ft (≈ $235,900.00 at 50,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:City of Webster Sumter County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Webster: Industrial Impact Fees

Industrial development in Webster pays $1.51 per square foot in impact fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to at least $75,300.00. The calculator below adjusts to your exact square footage.

The largest line items are Road Impact Fee (Sumter County, Industrial) ($1.51/sq ft).

Water Connection/Capacity Fee (City of Webster) and Sewer Connection/Capacity Fee (City of Webster) are set by the utility and not published online. Municipal Impact Fee (City of Webster, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (City of Webster)
    City of Webster
    $0 placeholder — UNCONFIRMED. City of Webster runs its own municipal water; nonres connection/capacity fee not published (posted Water Utility Rates PDF is monthly rates only). Call City Hall 352-793-2073.
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (City of Webster)
    City of Webster
    $0 placeholder — UNCONFIRMED. City of Webster runs its own wastewater utility; nonres sewer connection/capacity fee amount not published online. Call City Hall 352-793-2073.
    Requires confirmation
City$0.00
County$1.51/sq ft
  • Road Impact Fee (Sumter County, Industrial)
    Sumter County
    Sumter County Road Impact Fee — §20-66 (Ord. 2024-30; Benesch 5/14/2024; 40% of max). Applies COUNTYWIDE incl. cities. Schedule row: ITE 110 General Light Industrial = $1,506 per 1,000 sf (GFA). CURRENT = Phase II eff 1/1/2026; Phase III 1/1/2027 $1,657; Phase IV 1/1/2028 $1,806.
    $1.51/sq ft
Total (Webster): $1.51/sq ft (≈ $75,300.00 at 50,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:City of Webster Sumter County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Webster: Office Impact Fees

Office development in Webster pays $2.96 per square foot in impact fees (rates sourced July 18, 2026).

For a 25,000 sq ft building, that comes to at least $73,975.00. The calculator below adjusts to your exact square footage.

The largest line items are Road Impact Fee (Sumter County, Office) ($2.96/sq ft).

Water Connection/Capacity Fee (City of Webster) and Sewer Connection/Capacity Fee (City of Webster) are set by the utility and not published online. Municipal Impact Fee (City of Webster, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (City of Webster)
    City of Webster
    $0 placeholder — UNCONFIRMED. City of Webster runs its own municipal water; nonres connection/capacity fee not published (posted Water Utility Rates PDF is monthly rates only). Call City Hall 352-793-2073.
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (City of Webster)
    City of Webster
    $0 placeholder — UNCONFIRMED. City of Webster runs its own wastewater utility; nonres sewer connection/capacity fee amount not published online. Call City Hall 352-793-2073.
    Requires confirmation
City$0.00
County$2.96/sq ft
  • Road Impact Fee (Sumter County, Office)
    Sumter County
    Sumter County Road Impact Fee — §20-66 (Ord. 2024-30; Benesch 5/14/2024; 40% of max). Applies COUNTYWIDE incl. cities. Schedule row: ITE 710 General Office = $2,959 per 1,000 sf (GFA). CURRENT = Phase II eff 1/1/2026; Phase III 1/1/2027 $3,255; Phase IV 1/1/2028 $3,550.
    $2.96/sq ft
Total (Webster): $2.96/sq ft (≈ $73,975.00 at 25,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:City of Webster Sumter County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Webster

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Frequently asked questions

What are the total impact fees for a single-family home in Webster, Florida?

A new single-family home in Webster pays at least $3,332.00 per unit in combined impact fees (rates sourced July 18, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Webster?

Commercial development in Webster pays $4.72 per square foot in impact fees, at least $235,900.00 for a 50,000 sq ft building. 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Webster charge its own impact fees?

Yes. Webster levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Webster, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Sumter County impact fees page.

Missing a jurisdiction? Get in touch.