Center Hill applies its own fee schedule: municipal fees plus the Sumter County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $3,332.00 per unit (rates sourced July 18, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Center Hill impact fees by project type

Center Hill: Single-Family Impact Fees

A new single-family home in Center Hill pays at least $3,332.00 per unit in impact fees (rates sourced July 18, 2026). All of it is levied by Sumter County.

The largest line items are Road Impact Fee (Sumter County) ($3,332.00).

Water Connection/Capacity Fee (City of Center Hill) and Sewer Connection/Capacity Fee (City of Center Hill) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (City of Center Hill)
    City of Center Hill
    The City of Center Hill runs its own water system (PWS FL6600316, 'Center Hill Water Dept-City of', active, 762 served). Municode hosts only the city's Land Development Code (through Ord. 23-02, 9-6-2023) - there is no Code of Ordinances product, so no codified utility fee article is available. Neither cityofcenterhill.org nor the cityofcenterhillfl.com bill-pay site publishes a rate sheet, tap fee, connection fee or impact fee amount; the LDC portal at inspire-engagement.com returned 503. Charge presumably exists but no published amount. 8/5/2026
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (City of Center Hill)
    City of Center Hill
    Ambiguous and left flagged. The FDEP Wastewater Facility Regulation registry lists no City of Center Hill domestic wastewater facility among the 50 permitted wastewater facilities in Sumter County, and the wastewater-sites layer has no Center Hill entry, which points toward the city having no central sewer. But the city's own bill-pay site states that 'the city of Center Hill offers Water and Sewer Utilities for our customers,' which directly contradicts a documented zero, and the city's main site shows only a water clerk and new water account forms. With the city affirmatively advertising sewer service I will not record a documented zero, and no sewer connection or capacity fee amount is published anywhere. 8/5/2026
    Requires confirmation
City$0.00
  • Municipal Impact Fees (City of Center Hill)
    City of Center Hill
    No municipal impact fees adopted for the City of Center Hill (not codified; small town). Road demand covered by the countywide Sumter County Road Impact Fee. Confirmed $0.
    $0.00
County$3,332.00
  • Road Impact Fee (Sumter County)
    Sumter County
    Sumter County Road Impact Fee applies within incorporated cities. Single-family detached $3,332 (Phase II, eff 1/1/2026); Phase III 1/1/2027 $3,665; Phase IV 1/1/2028 $3,999.
    $3,332.00
Total (Center Hill): $3,332.00
Sources last checked July 18, 2026Official fee schedules:City of Center Hill Sumter County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Center Hill: Multifamily Impact Fees

A new multifamily unit in Center Hill pays at least $1,773.00 per unit in impact fees (rates sourced July 18, 2026). All of it is levied by Sumter County.

The largest line items are Road Impact Fee (Sumter County, MF) ($1,773.00).

Sewer Connection/Capacity Fee (City of Center Hill, MF) and Water Connection/Capacity Fee (City of Center Hill, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (City of Center Hill, MF)
    City of Center Hill
    The City of Center Hill runs its own water system (PWS FL6600316, 'Center Hill Water Dept-City of', active, 762 served). Municode hosts only the city's Land Development Code (through Ord. 23-02, 9-6-2023) - there is no Code of Ordinances product, so no codified utility fee article is available. Neither cityofcenterhill.org nor the cityofcenterhillfl.com bill-pay site publishes a rate sheet, tap fee, connection fee or impact fee amount; the LDC portal at inspire-engagement.com returned 503. Charge presumably exists but no published amount. 8/5/2026
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (City of Center Hill, MF)
    City of Center Hill
    Ambiguous and left flagged. The FDEP Wastewater Facility Regulation registry lists no City of Center Hill domestic wastewater facility among the 50 permitted wastewater facilities in Sumter County, and the wastewater-sites layer has no Center Hill entry, which points toward the city having no central sewer. But the city's own bill-pay site states that 'the city of Center Hill offers Water and Sewer Utilities for our customers,' which directly contradicts a documented zero, and the city's main site shows only a water clerk and new water account forms. With the city affirmatively advertising sewer service I will not record a documented zero, and no sewer connection or capacity fee amount is published anywhere. 8/5/2026
    Requires confirmation
City$0.00
County$1,773.00
  • Road Impact Fee (Sumter County, MF)
    Mid/High-Rise 4+ floors
    Sumter County
    Sumter County Road Impact Fee, multifamily mid/high-rise (4+ floors, LUC 221/222) $1,773/unit (Phase II, eff 1/1/2026). Applies in Center Hill. Default MF tier (canonical 4-story unit).
    $1,773.00
Total (Center Hill): $1,773.00
Sources last checked July 18, 2026Official fee schedules:City of Center Hill Sumter County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Center Hill: Commercial Impact Fees

Commercial development in Center Hill pays $4.72 per square foot in impact fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to at least $235,900.00. The calculator below adjusts to your exact square footage.

The largest line items are Road Impact Fee (Sumter County, Commercial) ($4.72/sq ft).

Sewer Connection/Capacity Fee (City of Center Hill) and Water Connection/Capacity Fee (City of Center Hill) are set by the utility and not published online. Municipal Impact Fee (City of Center Hill, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (City of Center Hill)
    City of Center Hill
    $0 placeholder — UNCONFIRMED. City of Center Hill operates municipal water; nonres connection/capacity fee amount not published (billing via doxo; not on Municode). Call City Hall 352-793-4431.
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (City of Center Hill)
    City of Center Hill
    $0 placeholder — UNCONFIRMED. City of Center Hill operates municipal sewer; nonres connection/capacity fee not published (billing via doxo; not on Municode). Call City Hall 352-793-4431.
    Requires confirmation
City$0.00
County$4.72/sq ft
  • Road Impact Fee (Sumter County, Commercial)
    Sumter County
    Sumter County Road Impact Fee — Code Ch.20 Art.III Div.4 §20-66 (Ord. 2024-30; Benesch 5/14/2024; 40% of max). Applies COUNTYWIDE incl. cities (§20-33(3), §20-35). Schedule row: ITE 821 Retail 40,000–150,000 sfgla = $4,718 per 1,000 sfgla (GLA). CURRENT = Phase II eff 1/1/2026; Phase III 1/1/2027 $5,190; Phase IV 1/1/2028 $5,661.
    $4.72/sq ft
Total (Center Hill): $4.72/sq ft (≈ $235,900.00 at 50,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:City of Center Hill Sumter County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Center Hill: Industrial Impact Fees

Industrial development in Center Hill pays $1.51 per square foot in impact fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to at least $75,300.00. The calculator below adjusts to your exact square footage.

The largest line items are Road Impact Fee (Sumter County, Industrial) ($1.51/sq ft).

Sewer Connection/Capacity Fee (City of Center Hill) and Water Connection/Capacity Fee (City of Center Hill) are set by the utility and not published online. Municipal Impact Fee (City of Center Hill, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (City of Center Hill)
    City of Center Hill
    $0 placeholder — UNCONFIRMED. City of Center Hill operates municipal water; nonres connection/capacity fee amount not published (billing via doxo; not on Municode). Call City Hall 352-793-4431.
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (City of Center Hill)
    City of Center Hill
    $0 placeholder — UNCONFIRMED. City of Center Hill operates municipal sewer; nonres connection/capacity fee not published (billing via doxo; not on Municode). Call City Hall 352-793-4431.
    Requires confirmation
City$0.00
County$1.51/sq ft
  • Road Impact Fee (Sumter County, Industrial)
    Sumter County
    Sumter County Road Impact Fee — §20-66 (Ord. 2024-30; Benesch 5/14/2024; 40% of max). Applies COUNTYWIDE incl. cities. Schedule row: ITE 110 General Light Industrial = $1,506 per 1,000 sf (GFA). CURRENT = Phase II eff 1/1/2026; Phase III 1/1/2027 $1,657; Phase IV 1/1/2028 $1,806.
    $1.51/sq ft
Total (Center Hill): $1.51/sq ft (≈ $75,300.00 at 50,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:City of Center Hill Sumter County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Center Hill: Office Impact Fees

Office development in Center Hill pays no per-square-foot impact fees (rates sourced July 18, 2026).

Sewer Connection/Capacity Fee (City of Center Hill) and Water Connection/Capacity Fee (City of Center Hill) are set by the utility and not published online. Municipal Impact Fee (City of Center Hill, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (City of Center Hill)
    City of Center Hill
    $0 placeholder — UNCONFIRMED. City of Center Hill operates municipal water; nonres connection/capacity fee amount not published (billing via doxo; not on Municode). Call City Hall 352-793-4431.
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (City of Center Hill)
    City of Center Hill
    $0 placeholder — UNCONFIRMED. City of Center Hill operates municipal sewer; nonres connection/capacity fee not published (billing via doxo; not on Municode). Call City Hall 352-793-4431.
    Requires confirmation
City$0.00
Total (Center Hill): $0.00
Sources last checked July 18, 2026Official fee schedule:City of Center Hill
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Sumter County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Center Hill

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Frequently asked questions

What are the total impact fees for a single-family home in Center Hill, Florida?

A new single-family home in Center Hill pays at least $3,332.00 per unit in combined impact fees (rates sourced July 18, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Center Hill?

Commercial development in Center Hill pays $4.72 per square foot in impact fees, at least $235,900.00 for a 50,000 sq ft building. 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Center Hill charge its own impact fees?

Yes. Center Hill levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Center Hill, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Sumter County impact fees page.

Missing a jurisdiction? Get in touch.