Glendale Impact Fees by Project Type
Glendale: Single-Family Impact Fees
A new single-family home in Glendale pays $14,801.00 per unit in impact fees (rates sourced August 4, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Streets Development Impact Fee (City of Glendale, West Benefit Area) ($4,575.00), Wastewater Utility Development Fee (City of Glendale, East Service Area) ($3,795.00) and Water Utility Development Fee (City of Glendale, East Service Area) ($3,330.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Glendale Impact Fee Schedule
- Water Utility Development Fee (City of Glendale, East Service Area)$3,330.00East Service Area, 3/4"City of GlendaleGlendale charges a water utility development fee per meter in East Glendale; the amount shown is for a 3/4 inch meter, the highest of 2 rate districts. West Glendale pays $0 water development fee at every meter size. Rates effective September 8, 2025 (schedule updated June 24, 2026).
- Wastewater Utility Development Fee (City of Glendale, East Service Area)$3,795.00East Service Area, 3/4"City of GlendaleGlendale charges a wastewater utility development fee per meter in East Glendale; the amount shown is for a 3/4 inch meter, the highest of 2 rate districts. West Glendale pays $0 wastewater development fee at every meter size. Rates effective September 8, 2025 (schedule updated June 24, 2026).
- Streets Development Impact Fee (City of Glendale, West Benefit Area)$4,575.00West GlendaleCity of GlendaleGlendale charges a streets impact fee per single-family home that varies by area; the amount shown is for West Glendale, the highest of 2 rate districts. East Glendale homes pay $4,270. Rates effective September 8, 2025 (schedule updated June 24, 2026).
- Parks & Recreation Development Impact Fee (City of Glendale)$1,194.00City of GlendaleGlendale charges a citywide parks and recreation impact fee of $1,194 per single-family home, the same in East and West Glendale, effective September 8, 2025.
- Fire Development Impact Fee (City of Glendale)$850.00City of GlendaleGlendale charges a citywide fire impact fee of $850 per single-family home, the same in East and West Glendale, effective September 8, 2025.
- Police Development Impact Fee (City of Glendale)$702.00City of GlendaleGlendale charges a citywide police impact fee of $702 per single-family home, the same in East and West Glendale, effective September 8, 2025.
- Library Development Impact Fee (City of Glendale)$355.00City of GlendaleGlendale charges a citywide library impact fee of $355 per single-family home, the same in East and West Glendale, effective September 8, 2025.
- County Impact Fee (Maricopa County, Glendale)$0.00Maricopa CountyMaricopa County levies no county development impact fees (its A.R.S. 11-1102 authority is unused); its Board-approved Planning and Development fee schedules cover plan review and inspection costs only, so no county fee applies here.
Where in Maricopa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Glendale: Multifamily Impact Fees
A new multifamily unit in Glendale pays $12,494.00 per unit in impact fees (rates sourced August 4, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Utility Development Fee (City of Glendale, East Service Area, MF) ($3,795.00), Water Utility Development Fee (City of Glendale, East Service Area, MF) ($3,330.00) and Streets Development Impact Fee (City of Glendale, West Benefit Area, MF) ($3,271.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Glendale Impact Fee Schedule
- Water Utility Development Fee (City of Glendale, East Service Area, MF)$3,330.00East Service Area, 3/4"City of GlendaleGlendale charges a water utility development fee per water meter, not per unit, in East Glendale; the amount shown is the smallest (3/4 inch) meter, the highest of 2 rate districts, and the larger meters a multifamily building typically needs pay more (up to $177,584 for 8 inch). West Glendale pays $0 water development fee at every meter size. Rates effective September 8, 2025 (schedule updated June 24, 2026).
- Wastewater Utility Development Fee (City of Glendale, East Service Area, MF)$3,795.00East Service Area, 3/4"City of GlendaleGlendale charges a wastewater utility development fee per water meter, not per unit, in East Glendale; the amount shown is the smallest (3/4 inch) meter, the highest of 2 rate districts, and the larger meters a multifamily building typically needs pay more (up to $202,364 for 8 inch). West Glendale pays $0 wastewater development fee at every meter size. Rates effective September 8, 2025 (schedule updated June 24, 2026).
- Streets Development Impact Fee (City of Glendale, West Benefit Area, MF)$3,271.00West GlendaleCity of GlendaleGlendale charges a streets impact fee per multifamily unit (2 or more units per structure) that varies by area; the amount shown is for West Glendale, the highest of 2 rate districts. East Glendale units pay $3,054. Rates effective September 8, 2025 (schedule updated June 24, 2026).
- Parks & Recreation Development Impact Fee (City of Glendale, MF)$808.00City of GlendaleGlendale charges a citywide parks and recreation impact fee of $808 per multifamily unit (2 or more units per structure), the same in East and West Glendale, effective September 8, 2025.
- Fire Development Impact Fee (City of Glendale, MF)$575.00City of GlendaleGlendale charges a citywide fire impact fee of $575 per multifamily unit (2 or more units per structure), the same in East and West Glendale, effective September 8, 2025.
- Police Development Impact Fee (City of Glendale, MF)$475.00City of GlendaleGlendale charges a citywide police impact fee of $475 per multifamily unit (2 or more units per structure), the same in East and West Glendale, effective September 8, 2025.
- Library Development Impact Fee (City of Glendale, MF)$240.00City of GlendaleGlendale charges a citywide library impact fee of $240 per multifamily unit (2 or more units per structure), the same in East and West Glendale, effective September 8, 2025.
- County Impact Fee (Maricopa County, Glendale, MF)$0.00Maricopa CountyMaricopa County levies no county development impact fees (its A.R.S. 11-1102 authority is unused); its Board-approved Planning and Development fee schedules cover plan review and inspection costs only, so no county fee applies here.
Where in Maricopa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Glendale: Commercial Impact Fees
Commercial development in Glendale pays $7.95 per square foot in impact fees, plus $11,898.00 in one-time water and sewer connection fees (rates sourced August 4, 2026).
For a 50,000 sq ft building, that comes to about $409,248.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Utility Development Fee (City of Glendale, East Service Area) — 1" meter ($6,337.00 one-time), Water Utility Development Fee (City of Glendale, East Service Area) — 1" meter ($5,561.00 one-time) and Streets Development Impact Fee (City of Glendale, Commercial) — West Glendale ($5.94/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Glendale Impact Fee Schedule
- Water Utility Development Fee (City of Glendale, East Service Area) — 1" meter$5,561.00 one-timeEast, 1"City of GlendaleCity of Glendale water utility development fee, effective September 8, 2025, set by water meter size. Shown for the East Glendale service area (the higher of the two) at a 1" meter; rates apply for 0.75"–8" meters. West Glendale water utility development fees are $0. Wastewater is billed separately.
- Wastewater Utility Development Fee (City of Glendale, East Service Area) — 1" meter$6,337.00 one-timeEast, 1"City of GlendaleCity of Glendale wastewater utility development fee, effective September 8, 2025, set by water meter size. Shown for the East Glendale service area (the higher of the two) at a 1" meter; rates apply for 0.75"–8" meters. West Glendale wastewater utility development fees are $0. Water is billed separately.
- Streets Development Impact Fee (City of Glendale, Commercial) — West Glendale$5.94/sq ftWest DistrictCity of GlendaleCity of Glendale Streets development impact fee, effective September 8, 2025, assessed per 1,000 sq ft of building. Rate varies by area: West Glendale shown (the higher of the two); East Glendale is $5,543 per 1,000 sq ft.
- Fire Development Impact Fee (City of Glendale, Commercial)$1.01/sq ftCity of GlendaleCity of Glendale Fire development impact fee, effective September 8, 2025, assessed per 1,000 sq ft of building. Same rate in East and West Glendale. One of five Glendale nonresidential development impact fees (fire, library, parks & recreation, police, streets); water and wastewater utility development fees are billed separately by meter size and service area.
- Police Development Impact Fee (City of Glendale, Commercial)$0.83/sq ftCity of GlendaleCity of Glendale Police development impact fee, effective September 8, 2025, assessed per 1,000 sq ft of building. Same rate in East and West Glendale.
- Parks & Recreation Development Impact Fee (City of Glendale, Commercial)$0.13/sq ftCity of GlendaleCity of Glendale Parks & Recreation development impact fee, effective September 8, 2025, assessed per 1,000 sq ft of building. Same rate in East and West Glendale.
- Library Development Impact Fee (City of Glendale, Commercial)$0.04/sq ftCity of GlendaleCity of Glendale Library development impact fee, effective September 8, 2025, assessed per 1,000 sq ft of building. Same rate in East and West Glendale.
- County Impact Fee (Maricopa County overlay, Commercial)$0.00Maricopa CountyMaricopa County does not levy development impact fees.
Where in Maricopa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Glendale: Industrial Impact Fees
Industrial development in Glendale pays $1.14 per square foot in impact fees, plus $11,898.00 in one-time water and sewer connection fees (rates sourced August 4, 2026).
For a 50,000 sq ft building, that comes to about $69,098.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Utility Development Fee (City of Glendale, East Service Area) — 1" meter ($6,337.00 one-time), Water Utility Development Fee (City of Glendale, East Service Area) — 1" meter ($5,561.00 one-time) and Streets Development Impact Fee (City of Glendale, Industrial) — West Glendale ($0.80/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Glendale Impact Fee Schedule
- Water Utility Development Fee (City of Glendale, East Service Area) — 1" meter$5,561.00 one-timeEast, 1"City of GlendaleCity of Glendale water utility development fee, effective September 8, 2025, set by water meter size. Shown for the East Glendale service area (the higher of the two) at a 1" meter; rates apply for 0.75"–8" meters. West Glendale water utility development fees are $0. Wastewater is billed separately.
- Wastewater Utility Development Fee (City of Glendale, East Service Area) — 1" meter$6,337.00 one-timeEast, 1"City of GlendaleCity of Glendale wastewater utility development fee, effective September 8, 2025, set by water meter size. Shown for the East Glendale service area (the higher of the two) at a 1" meter; rates apply for 0.75"–8" meters. West Glendale wastewater utility development fees are $0. Water is billed separately.
- Streets Development Impact Fee (City of Glendale, Industrial) — West Glendale$0.80/sq ftWest DistrictCity of GlendaleCity of Glendale Streets development impact fee, effective September 8, 2025, assessed per 1,000 sq ft of building. Rate varies by area: West Glendale shown (the higher); East Glendale is $745 per 1,000 sq ft.
- Fire Development Impact Fee (City of Glendale, Industrial)$0.14/sq ftCity of GlendaleCity of Glendale Fire development impact fee, effective September 8, 2025, assessed per 1,000 sq ft of building. Same rate in East and West Glendale.
- Police Development Impact Fee (City of Glendale, Industrial)$0.12/sq ftCity of GlendaleCity of Glendale Police development impact fee, effective September 8, 2025, assessed per 1,000 sq ft of building. Same rate in East and West Glendale.
- Parks & Recreation Development Impact Fee (City of Glendale, Industrial)$0.07/sq ftCity of GlendaleCity of Glendale Parks & Recreation development impact fee, effective September 8, 2025, assessed per 1,000 sq ft of building. Same rate in East and West Glendale.
- Library Development Impact Fee (City of Glendale, Industrial)$0.02/sq ftCity of GlendaleCity of Glendale Library development impact fee, effective September 8, 2025, assessed per 1,000 sq ft of building. Same rate in East and West Glendale.
- County Impact Fee (Maricopa County overlay, Industrial)$0.00Maricopa CountyMaricopa County does not levy development impact fees.
Where in Maricopa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Glendale: Office Impact Fees
Office development in Glendale pays $4.61 per square foot in impact fees, plus $11,898.00 in one-time water and sewer connection fees (rates sourced August 4, 2026).
For a 25,000 sq ft building, that comes to about $127,073.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Utility Development Fee (City of Glendale, East Service Area) — 1" meter ($6,337.00 one-time), Water Utility Development Fee (City of Glendale, East Service Area) — 1" meter ($5,561.00 one-time) and Streets Development Impact Fee (City of Glendale, Office) — West Glendale ($3.53/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Glendale Impact Fee Schedule
- Water Utility Development Fee (City of Glendale, East Service Area) — 1" meter$5,561.00 one-timeEast, 1"City of GlendaleCity of Glendale water utility development fee, effective September 8, 2025, set by water meter size. Shown for the East Glendale service area (the higher of the two) at a 1" meter; rates apply for 0.75"–8" meters. West Glendale water utility development fees are $0. Wastewater is billed separately.
- Wastewater Utility Development Fee (City of Glendale, East Service Area) — 1" meter$6,337.00 one-timeEast, 1"City of GlendaleCity of Glendale wastewater utility development fee, effective September 8, 2025, set by water meter size. Shown for the East Glendale service area (the higher of the two) at a 1" meter; rates apply for 0.75"–8" meters. West Glendale wastewater utility development fees are $0. Water is billed separately.
- Streets Development Impact Fee (City of Glendale, Office) — West Glendale$3.53/sq ftWest DistrictCity of GlendaleCity of Glendale Streets development impact fee, effective September 8, 2025, assessed per 1,000 sq ft of building (schedule category: Office & Other Services). Rate varies by area: West Glendale shown (the higher); East Glendale is $3,297 per 1,000 sq ft.
- Fire Development Impact Fee (City of Glendale, Office)$0.45/sq ftCity of GlendaleCity of Glendale Fire development impact fee, effective September 8, 2025, assessed per 1,000 sq ft of building (schedule category: Office & Other Services). Same rate in East and West Glendale.
- Police Development Impact Fee (City of Glendale, Office)$0.37/sq ftCity of GlendaleCity of Glendale Police development impact fee, effective September 8, 2025, assessed per 1,000 sq ft of building (schedule category: Office & Other Services). Same rate in East and West Glendale.
- Parks & Recreation Development Impact Fee (City of Glendale, Office)$0.20/sq ftCity of GlendaleCity of Glendale Parks & Recreation development impact fee, effective September 8, 2025, assessed per 1,000 sq ft of building (schedule category: Office & Other Services). Same rate in East and West Glendale.
- Library Development Impact Fee (City of Glendale, Office)$0.06/sq ftCity of GlendaleCity of Glendale Library development impact fee, effective September 8, 2025, assessed per 1,000 sq ft of building (schedule category: Office & Other Services). Same rate in East and West Glendale.
- County Impact Fee (Maricopa County overlay, Office)$0.00Maricopa CountyMaricopa County does not levy development impact fees.
Where in Maricopa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Glendale Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in Arizona
Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.
Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.
Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.
Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Glendale Impact Fee FAQs
What are the total impact fees for a single-family home in Glendale, Arizona?
A new single-family home in Glendale pays $14,801.00 per unit in combined impact fees (rates sourced August 4, 2026).
How much are commercial impact fees in Glendale?
Commercial development in Glendale pays $7.95 per square foot in impact fees, plus $11,898.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $409,248.00 for a 50,000 sq ft building.
Does Glendale charge its own impact fees?
Yes. Glendale levies its own municipal impact or utility fees. Maricopa County does not currently add county-level impact fees inside Glendale. The schedule on this page shows every fee that applies to development in Glendale.
Can Arizona development impact fees increase at any time?
No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.