Tolleson Impact Fees by Project Type
Tolleson: Single-Family Impact Fees
A new single-family home in Tolleson pays at least $515.00 per unit in impact fees (rates sourced July 23, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Meter Fee (City of Tolleson) ($515.00).
Sewer Connection Fee (City of Tolleson) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Tolleson Impact Fee Schedule
- Water Meter Fee (City of Tolleson)$515.003/4"City of TollesonTolleson charges a one-time water meter fee by meter size; a standard 3/4 inch residential meter is $515, and larger meters pay $615 (1 inch) up to $16,910 (8 inch). The City replaced its development impact fees with these meter fees on September 1, 2014.
- Sewer Connection Fee (City of Tolleson)Requires confirmationCity of TollesonTolleson operates its own wastewater system and publishes no one-time sewer connection or capacity fee; property owners pay their contractor to install the sewer service line, and monthly sewer rates apply after connection.
- City Development Impact Fee (City of Tolleson)$0.00City of TollesonTolleson has imposed no development impact fees since September 1, 2014, when it repealed its impact fee code section; no city impact fee applies to new homes or apartments.
- County Impact Fee (Maricopa County)$0.00Maricopa CountyMaricopa County levies no county development impact fees (its A.R.S. 11-1102 authority is unused); its Board-approved Planning and Development fee schedules cover plan review and inspection costs only, so no county fee applies here.
Where in Maricopa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Tolleson: Multifamily Impact Fees
A new multifamily unit in Tolleson pays at least $515.00 per unit in impact fees (rates sourced July 23, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Meter Fee (City of Tolleson, MF) ($515.00).
Sewer Connection Fee (City of Tolleson, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Tolleson Impact Fee Schedule
- Water Meter Fee (City of Tolleson, MF)$515.003/4"City of TollesonTolleson's water meter fee is charged per meter, not per unit, starting at $515 for a 3/4 inch meter (shown) and rising to $16,910 for an 8 inch meter; a multifamily project pays for each meter it installs.
- Sewer Connection Fee (City of Tolleson, MF)Requires confirmationCity of TollesonTolleson operates its own wastewater system and publishes no one-time sewer connection or capacity fee; property owners pay their contractor to install the sewer service line, and monthly sewer rates apply after connection.
- City Development Impact Fee (City of Tolleson, MF)$0.00City of TollesonTolleson has imposed no development impact fees since September 1, 2014, when it repealed its impact fee code section; no city impact fee applies to new homes or apartments.
- County Impact Fee (Maricopa County, MF)$0.00Maricopa CountyMaricopa County levies no county development impact fees (its A.R.S. 11-1102 authority is unused); its Board-approved Planning and Development fee schedules cover plan review and inspection costs only, so no county fee applies here.
Where in Maricopa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Tolleson: Commercial Impact Fees
Commercial development in Tolleson pays no per-square-foot impact fees, but owes $615.00 in one-time water and sewer connection fees (rates sourced July 23, 2026).
For a 50,000 sq ft building, that comes to at least $615.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter/Connection Fee (City of Tolleson) — 1" meter ($615.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (City of Tolleson) — nonres is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Tolleson Impact Fee Schedule
- Water Meter/Connection Fee (City of Tolleson) — 1" meter$615.00 one-timeCity of TollesonCity of Tolleson water meter/connection fee assessed by meter size (rate shown is a 1-inch meter). This is the city's only one-time water charge.
- Sewer Connection Fee (City of Tolleson) — nonresRequires confirmationCity of TollesonThe City of Tolleson publishes no sewer connection or capacity fee; owners pay the cost of installing their own sewer connection.
- City Development Impact Fee (City of Tolleson, Commercial)$0.00City of TollesonThe City of Tolleson does not charge development impact fees (repealed effective 9/1/2014).
- County Development Impact Fee (Maricopa County, Commercial)$0.00Maricopa CountyMaricopa County does not levy development impact fees.
Where in Maricopa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Tolleson: Industrial Impact Fees
Industrial development in Tolleson pays no per-square-foot impact fees, but owes $615.00 in one-time water and sewer connection fees (rates sourced July 23, 2026).
For a 50,000 sq ft building, that comes to at least $615.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter/Connection Fee (City of Tolleson) — 1" meter ($615.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (City of Tolleson) — nonres is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Tolleson Impact Fee Schedule
- Water Meter/Connection Fee (City of Tolleson) — 1" meter$615.00 one-timeCity of TollesonCity of Tolleson water meter/connection fee assessed by meter size (rate shown is a 1-inch meter). This is the city's only one-time water charge.
- Sewer Connection Fee (City of Tolleson) — nonresRequires confirmationCity of TollesonThe City of Tolleson publishes no sewer connection or capacity fee; owners pay the cost of installing their own sewer connection.
- City Development Impact Fee (City of Tolleson, Industrial)$0.00City of TollesonThe City of Tolleson does not charge development impact fees (repealed effective 9/1/2014).
- County Development Impact Fee (Maricopa County, Industrial)$0.00Maricopa CountyMaricopa County does not levy development impact fees.
Where in Maricopa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Tolleson: Office Impact Fees
Office development in Tolleson pays no per-square-foot impact fees, but owes $615.00 in one-time water and sewer connection fees (rates sourced July 23, 2026).
For a 25,000 sq ft building, that comes to at least $615.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter/Connection Fee (City of Tolleson) — 1" meter ($615.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (City of Tolleson) — nonres is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Tolleson Impact Fee Schedule
- Water Meter/Connection Fee (City of Tolleson) — 1" meter$615.00 one-timeCity of TollesonCity of Tolleson water meter/connection fee assessed by meter size (rate shown is a 1-inch meter). This is the city's only one-time water charge.
- Sewer Connection Fee (City of Tolleson) — nonresRequires confirmationCity of TollesonThe City of Tolleson publishes no sewer connection or capacity fee; owners pay the cost of installing their own sewer connection.
- City Development Impact Fee (City of Tolleson, Office)$0.00City of TollesonThe City of Tolleson does not charge development impact fees (repealed effective 9/1/2014).
- County Development Impact Fee (Maricopa County, Office)$0.00Maricopa CountyMaricopa County does not levy development impact fees.
Where in Maricopa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Tolleson Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in Arizona
Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.
Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.
Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.
Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Tolleson Impact Fee FAQs
What are the total impact fees for a single-family home in Tolleson, Arizona?
A new single-family home in Tolleson pays at least $515.00 per unit in combined impact fees (rates sourced July 23, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Tolleson?
Commercial development in Tolleson pays no per-square-foot impact fees, but owes $615.00 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Tolleson charge its own impact fees?
Yes. Tolleson levies its own municipal impact or utility fees. Maricopa County does not currently add county-level impact fees inside Tolleson. The schedule on this page shows every fee that applies to development in Tolleson.
Can Arizona development impact fees increase at any time?
No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Maricopa County impact fees page.