Queen Creek, Arizona Impact Fees

Queen Creek applies its own fee schedule. Maricopa County does not currently add county-level impact fees inside city limits. A new single-family home pays $13,038.00 per unit (rates sourced ). The full breakdown is below.

Queen Creek Impact Fees by Project Type

Queen Creek: Single-Family Impact Fees

A new single-family home in Queen Creek pays $13,038.00 per unit in impact fees (rates sourced October 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Capacity Fee (Town of Queen Creek) ($6,144.00), Water Capacity Fee (Town of Queen Creek) ($2,382.00) and Parks & Recreation Development Fee (Town of Queen Creek) ($1,933.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Queen Creek Impact Fee Schedule
Water$2,382.00
  • Water Capacity Fee (Town of Queen Creek)
    3/4"
    Town of Queen Creek
    Queen Creek water capacity fee is charged per meter at building permit issuance, in addition to meter installation fees: $2,382 for a 3/4 inch meter, $3,978 for 1 inch, $7,933 for 1.5 inch and $12,697 for 2 inch; turbine and larger meters use a special calculation. A water capacity fee increase and a new water resource capacity fee go to public hearing on November 18, 2026, with implementation proposed for December 21, 2026.
    $2,382.00
Sewer$6,144.00
  • Sewer Capacity Fee (Town of Queen Creek)
    3/4"
    Town of Queen Creek
    Queen Creek residential sewer capacity fee, effective January 5, 2026: $6,144 for a 3/4 inch or 1 inch meter, $20,481 for 1.5 inch and $32,770 for 2 inch; collected at building permit issuance.
    $6,144.00
City$4,512.00
County$0.00
  • County Development Impact Fee (Maricopa County)
    Maricopa County
    Maricopa County levies no county development impact fees (its A.R.S. 11-1102 authority is unused); its Board-approved Planning and Development fee schedules cover plan review and inspection costs only, so no county fee applies here.
    $0.00
Total (Queen Creek): $13,038.00
Sources last checked Official fee schedules:Town of Queen Creek Maricopa County

Where in Maricopa County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Queen Creek: Multifamily Impact Fees

A new multifamily unit in Queen Creek pays $10,389.00 per unit in impact fees (rates sourced October 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Capacity Fee (Town of Queen Creek, MF) ($4,608.00), Water Capacity Fee (Town of Queen Creek, MF) ($2,382.00) and Parks & Recreation Development Fee (Town of Queen Creek, MF) ($1,510.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Queen Creek Impact Fee Schedule
Water$2,382.00
  • Water Capacity Fee (Town of Queen Creek, MF)
    3/4"
    Town of Queen Creek
    Queen Creek water capacity fee is charged per meter at building permit issuance, in addition to meter installation fees: $2,382 for a 3/4 inch meter (the smallest meter, shown for multifamily), $3,978 for 1 inch, $7,933 for 1.5 inch and $12,697 for 2 inch; turbine and larger meters use a special calculation. A water capacity fee increase and a new water resource capacity fee go to public hearing on November 18, 2026, with implementation proposed for December 21, 2026.
    $2,382.00
Sewer$4,608.00
City$3,399.00
County$0.00
  • County Development Impact Fee (Maricopa County, MF)
    Maricopa County
    Maricopa County levies no county development impact fees (its A.R.S. 11-1102 authority is unused); its Board-approved Planning and Development fee schedules cover plan review and inspection costs only, so no county fee applies here.
    $0.00
Total (Queen Creek): $10,389.00
Sources last checked Official fee schedules:Town of Queen Creek Maricopa County

Where in Maricopa County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Queen Creek: Commercial Impact Fees

Commercial development in Queen Creek pays $2.88 per square foot in impact fees, plus $14,239.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).

For a 50,000 sq ft building, that comes to about $158,289.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (Town of Queen Creek) — 1" meter ($10,261.00 one-time), Water Capacity Fee (Town of Queen Creek) — 1" meter ($3,978.00 one-time) and Development Fee – Parks/Trails/Police/Streets/Fire (Town of Queen Creek, Commercial) ($2.88/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Queen Creek Impact Fee Schedule
Water$3,978.00 one-time
  • Water Capacity Fee (Town of Queen Creek) — 1" meter
    Town of Queen Creek
    Effective 1/5/2026. Water capacity fee assessed by water meter size (rate shown is a 1-inch meter); collected at building permit in addition to meter installation cost. Turbine meters and meters over 2 inches are subject to a special calculation.
    $3,978.00 one-time
Sewer$10,261.00 one-time
  • Sewer Capacity Fee (Town of Queen Creek) — 1" meter
    Town of Queen Creek
    Effective 1/5/2026 (rates increased Dec. 2025). Sewer capacity fee assessed by water meter size (rate shown is a 1-inch meter, nonresidential column); collected at building permit. Turbine meters and meters over 2 inches are subject to a special calculation.
    $10,261.00 one-time
City$2.88/sq ft
County$0.00
Total (Queen Creek): $2.88/sq ft + $14,239.00 one-time (≈ $158,289.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Queen Creek Maricopa County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Maricopa County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Queen Creek: Industrial Impact Fees

Industrial development in Queen Creek pays $1.46 per square foot in impact fees, plus $14,239.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).

For a 50,000 sq ft building, that comes to about $87,139.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (Town of Queen Creek) — 1" meter ($10,261.00 one-time), Water Capacity Fee (Town of Queen Creek) — 1" meter ($3,978.00 one-time) and Development Fee – Parks/Trails/Police/Streets/Fire (Town of Queen Creek, Industrial) ($1.46/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Queen Creek Impact Fee Schedule
Water$3,978.00 one-time
  • Water Capacity Fee (Town of Queen Creek) — 1" meter
    Town of Queen Creek
    Effective 1/5/2026. Water capacity fee assessed by water meter size (rate shown is a 1-inch meter); collected at building permit in addition to meter installation cost. Turbine meters and meters over 2 inches are subject to a special calculation.
    $3,978.00 one-time
Sewer$10,261.00 one-time
  • Sewer Capacity Fee (Town of Queen Creek) — 1" meter
    Town of Queen Creek
    Effective 1/5/2026 (rates increased Dec. 2025). Sewer capacity fee assessed by water meter size (rate shown is a 1-inch meter, nonresidential column); collected at building permit. Turbine meters and meters over 2 inches are subject to a special calculation.
    $10,261.00 one-time
City$1.46/sq ft
County$0.00
Total (Queen Creek): $1.46/sq ft + $14,239.00 one-time (≈ $87,139.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Queen Creek Maricopa County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Maricopa County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Queen Creek: Office Impact Fees

Office development in Queen Creek pays $2.11 per square foot in impact fees, plus $14,239.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).

For a 25,000 sq ft building, that comes to about $66,964.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (Town of Queen Creek) — 1" meter ($10,261.00 one-time), Water Capacity Fee (Town of Queen Creek) — 1" meter ($3,978.00 one-time) and Development Fee – Parks/Trails/Police/Streets/Fire (Town of Queen Creek, Office) ($2.11/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Queen Creek Impact Fee Schedule
Water$3,978.00 one-time
  • Water Capacity Fee (Town of Queen Creek) — 1" meter
    Town of Queen Creek
    Effective 1/5/2026. Water capacity fee assessed by water meter size (rate shown is a 1-inch meter); collected at building permit in addition to meter installation cost. Turbine meters and meters over 2 inches are subject to a special calculation.
    $3,978.00 one-time
Sewer$10,261.00 one-time
  • Sewer Capacity Fee (Town of Queen Creek) — 1" meter
    Town of Queen Creek
    Effective 1/5/2026 (rates increased Dec. 2025). Sewer capacity fee assessed by water meter size (rate shown is a 1-inch meter, nonresidential column); collected at building permit. Turbine meters and meters over 2 inches are subject to a special calculation.
    $10,261.00 one-time
City$2.11/sq ft
County$0.00
Total (Queen Creek): $2.11/sq ft + $14,239.00 one-time (≈ $66,964.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Queen Creek Maricopa County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Maricopa County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Queen Creek Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in Arizona

Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.

Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.

Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.

Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Queen Creek Impact Fee FAQs

What are the total impact fees for a single-family home in Queen Creek, Arizona?

A new single-family home in Queen Creek pays $13,038.00 per unit in combined impact fees (rates sourced October 14, 2026).

How much are commercial impact fees in Queen Creek?

Commercial development in Queen Creek pays $2.88 per square foot in impact fees, plus $14,239.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $158,289.00 for a 50,000 sq ft building.

Does Queen Creek charge its own impact fees?

Yes. Queen Creek levies its own municipal impact or utility fees. Maricopa County does not currently add county-level impact fees inside Queen Creek. The schedule on this page shows every fee that applies to development in Queen Creek.

Can Arizona development impact fees increase at any time?

No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Maricopa County impact fees page.

Missing a jurisdiction? Get in touch.