Paradise Valley, Arizona Impact Fees

Paradise Valley applies its own fee schedule. Maricopa County does not currently add county-level impact fees inside city limits. A new single-family home pays $9,527.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Paradise Valley Impact Fees by Project Type

Paradise Valley: Single-Family Impact Fees

A new single-family home in Paradise Valley pays $9,527.00 per unit in impact fees (rates sourced October 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Development Impact Fee (Town of Paradise Valley) ($7,847.00).

Common Facilities Hook-up Fee (EPCOR Water, Paradise Valley District) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Paradise Valley Impact Fee Schedule
Water$1,680.00
  • Common Facilities Hook-up Fee (EPCOR Water, Paradise Valley District)
    5/8" x 3/4"
    EPCOR Water Arizona (Paradise Valley Water District)
    Four water providers serve Paradise Valley; EPCOR Water Arizona serves the largest share of parcels on the Town's water company map, followed closely by the City of Phoenix. EPCOR's Common Facilities hook-up fee is $1,680 for a 5/8 x 3/4 inch meter (Arizona Corporation Commission Decision 78439); Phoenix, Berneil Water Company and Scottsdale areas pay their own provider's charges.
    $1,680.00Requires confirmation
Sewer$7,847.00
  • Wastewater Development Impact Fee (Town of Paradise Valley)
    1" and smaller
    Town of Paradise Valley
    The Town of Paradise Valley charges a wastewater development fee by water meter size under Town Code Appendix B (Resolution 2017-02): $7,847 for a 1 inch or smaller meter. It funds wastewater treatment capacity purchased from the City of Scottsdale; lots on septic or City of Phoenix sewer may differ.
    $7,847.00
City$0.00
County$0.00
  • County Impact Fee (Maricopa County, Paradise Valley)
    Maricopa County
    Maricopa County levies no county development impact fees (its A.R.S. 11-1102 authority is unused); its Board-approved Planning and Development fee schedules cover plan review and inspection costs only, so no county fee applies here.
    $0.00
Total (Paradise Valley): $9,527.00
Sources last checked Official fee schedules:EPCOR Water Arizona (Paradise Valley Water District) Town of Paradise Valley Maricopa County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Maricopa County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Paradise Valley: Multifamily Impact Fees

A new multifamily unit in Paradise Valley pays $9,527.00 per unit in impact fees (rates sourced October 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Development Impact Fee (Town of Paradise Valley, MF) ($7,847.00).

Common Facilities Hook-up Fee (EPCOR Water, Paradise Valley District, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Paradise Valley Impact Fee Schedule
Water$1,680.00
  • Common Facilities Hook-up Fee (EPCOR Water, Paradise Valley District, MF)
    5/8" x 3/4"
    EPCOR Water Arizona (Paradise Valley Water District)
    EPCOR Water Arizona, the largest of the four water providers in Paradise Valley, charges its Common Facilities hook-up fee per service connection by meter size; the amount shown is the smallest meter (5/8 x 3/4 inch), rising to $84,000 for 6 inch and larger. Areas served by the City of Phoenix, Berneil Water Company or Scottsdale pay their own provider's charges.
    $1,680.00Requires confirmation
Sewer$7,847.00
  • Wastewater Development Impact Fee (Town of Paradise Valley, MF)
    1" and smaller
    Town of Paradise Valley
    The Town of Paradise Valley charges its wastewater development fee per water meter by size; the amount shown is the smallest printed meter (1 inch or smaller, $7,847), with larger meters from $15,694 (1.5 inch) to $251,104 (8 inch). Lots on septic or City of Phoenix sewer may differ.
    $7,847.00
City$0.00
County$0.00
  • County Impact Fee (Maricopa County, Paradise Valley, MF)
    Maricopa County
    Maricopa County levies no county development impact fees (its A.R.S. 11-1102 authority is unused); its Board-approved Planning and Development fee schedules cover plan review and inspection costs only, so no county fee applies here.
    $0.00
Total (Paradise Valley): $9,527.00
Sources last checked Official fee schedules:EPCOR Water Arizona (Paradise Valley Water District) Town of Paradise Valley Maricopa County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Maricopa County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Paradise Valley: Commercial Impact Fees

Commercial development in Paradise Valley pays no per-square-foot impact fees, but owes $12,047.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).

For a 50,000 sq ft building, that comes to about $12,047.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Development Impact Fee (Town of Paradise Valley) — 1" and smaller meter ($7,847.00 one-time) and Water Common Facilities Hook-up Fee (EPCOR Water, Paradise Valley District) — 1" meter ($4,200.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Paradise Valley Impact Fee Schedule
Water$4,200.00 one-time
Sewer$7,847.00 one-time
City$0.00
County$0.00
Total (Paradise Valley): $12,047.00 one-time (≈ $12,047.00 at 50,000 sq ft)
Sources last checked Official fee schedules:EPCOR Water Arizona Inc. Town of Paradise Valley Maricopa County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Maricopa County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Paradise Valley: Industrial Impact Fees

Industrial development in Paradise Valley pays no per-square-foot impact fees, but owes $12,047.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).

For a 50,000 sq ft building, that comes to about $12,047.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Development Impact Fee (Town of Paradise Valley) — 1" and smaller meter ($7,847.00 one-time) and Water Common Facilities Hook-up Fee (EPCOR Water, Paradise Valley District) — 1" meter ($4,200.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Paradise Valley Impact Fee Schedule
Water$4,200.00 one-time
Sewer$7,847.00 one-time
City$0.00
County$0.00
Total (Paradise Valley): $12,047.00 one-time (≈ $12,047.00 at 50,000 sq ft)
Sources last checked Official fee schedules:EPCOR Water Arizona Inc. Town of Paradise Valley Maricopa County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Maricopa County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Paradise Valley: Office Impact Fees

Office development in Paradise Valley pays no per-square-foot impact fees, but owes $12,047.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).

For a 25,000 sq ft building, that comes to about $12,047.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Development Impact Fee (Town of Paradise Valley) — 1" and smaller meter ($7,847.00 one-time) and Water Common Facilities Hook-up Fee (EPCOR Water, Paradise Valley District) — 1" meter ($4,200.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Paradise Valley Impact Fee Schedule
Water$4,200.00 one-time
Sewer$7,847.00 one-time
City$0.00
County$0.00
Total (Paradise Valley): $12,047.00 one-time (≈ $12,047.00 at 25,000 sq ft)
Sources last checked Official fee schedules:EPCOR Water Arizona Inc. Town of Paradise Valley Maricopa County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Maricopa County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Paradise Valley Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in Arizona

Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.

Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.

Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.

Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Paradise Valley Impact Fee FAQs

What are the total impact fees for a single-family home in Paradise Valley, Arizona?

A new single-family home in Paradise Valley pays $9,527.00 per unit in combined impact fees (rates sourced October 14, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Paradise Valley?

Commercial development in Paradise Valley pays no per-square-foot impact fees, but owes $12,047.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Paradise Valley charge its own impact fees?

Yes. Paradise Valley levies its own municipal impact or utility fees. Maricopa County does not currently add county-level impact fees inside Paradise Valley. The schedule on this page shows every fee that applies to development in Paradise Valley.

Can Arizona development impact fees increase at any time?

No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Maricopa County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000