Wickenburg Impact Fees by Project Type
Wickenburg: Single-Family Impact Fees
A new single-family home in Wickenburg pays $10,541.65 per unit in impact fees (rates sourced October 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Connection Fee (Town of Wickenburg, System 2) ($6,162.65) and Water Connection Fee (Town of Wickenburg, System 1) ($4,379.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Wickenburg Impact Fee Schedule
- Water Connection Fee (Town of Wickenburg, System 1)$4,379.00System 1, 5/8"Town of WickenburgThe Town of Wickenburg charges a one-time water connection fee per meter on its System 1 water system under the 2026-27 Consolidated Fee Schedule (effective September 1, 2026); a 5/8 inch meter is $4,379, and larger meters range up to $316,138. The meter purchase cost is billed separately. The Wickenburg Ranch system (System 2) has no water connection fee on the schedule.
- Wastewater Connection Fee (Town of Wickenburg, System 2)$6,162.65System 2 (Wickenburg Ranch)Town of WickenburgWickenburg Ranch (System 2) wastewater connections pay $6,162.65 per connection under the Town's 2026-27 Consolidated Fee Schedule (effective September 1, 2026), the highest of the Town's 2 sewer systems. On the Town's System 1 sewer the connection fee is charged per water meter, $4,728 for a 5/8 inch meter and rising with meter size.
- City Development Impact Fee (Town of Wickenburg)$0.00Town of WickenburgThe Town of Wickenburg levies no development impact fees: its former development fee article is no longer in the Town Code, and the adopted budget and 2026-27 fee schedule list no impact fee revenue. Water and sewer connection fees are listed separately.
- County Impact Fee (Maricopa County)$0.00Maricopa CountyMaricopa County levies no county development impact fees (its A.R.S. 11-1102 authority is unused); its Board-approved Planning and Development fee schedules cover plan review and inspection costs only, so no county fee applies here.
Where in Maricopa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Wickenburg: Multifamily Impact Fees
A new multifamily unit in Wickenburg pays $10,541.65 per unit in impact fees (rates sourced October 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Connection Fee (Town of Wickenburg, System 2, MF) ($6,162.65) and Water Connection Fee (Town of Wickenburg, System 1, MF) ($4,379.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Wickenburg Impact Fee Schedule
- Water Connection Fee (Town of Wickenburg, System 1, MF)$4,379.00System 1, 5/8"Town of WickenburgThe Town of Wickenburg charges a one-time water connection fee per meter on its System 1 water system under the 2026-27 Consolidated Fee Schedule (effective September 1, 2026); a 5/8 inch meter is $4,379 (the smallest meter, shown for multifamily), and larger meters range up to $316,138. The meter purchase cost is billed separately. The Wickenburg Ranch system (System 2) has no water connection fee on the schedule.
- Wastewater Connection Fee (Town of Wickenburg, System 2, MF)$6,162.65System 2 (Wickenburg Ranch)Town of WickenburgWickenburg Ranch (System 2) wastewater connections pay $6,162.65 per connection under the Town's 2026-27 Consolidated Fee Schedule (effective September 1, 2026), the highest of the Town's 2 sewer systems. On the Town's System 1 sewer the connection fee is charged per water meter, $4,728 for a 5/8 inch meter and rising with meter size.
- City Development Impact Fee (Town of Wickenburg, MF)$0.00Town of WickenburgThe Town of Wickenburg levies no development impact fees: its former development fee article is no longer in the Town Code, and the adopted budget and 2026-27 fee schedule list no impact fee revenue. Water and sewer connection fees are listed separately.
- County Impact Fee (Maricopa County, MF)$0.00Maricopa CountyMaricopa County levies no county development impact fees (its A.R.S. 11-1102 authority is unused); its Board-approved Planning and Development fee schedules cover plan review and inspection costs only, so no county fee applies here.
Where in Maricopa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Wickenburg: Commercial Impact Fees
Commercial development in Wickenburg pays no per-square-foot impact fees, but owes $15,473.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).
For a 50,000 sq ft building, that comes to about $15,473.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Connection Fee (Town of Wickenburg) — System 1, 1" meter ($7,962.00 one-time) and Water Connection Fee (Town of Wickenburg, System 1) — 1" meter ($7,511.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Wickenburg Impact Fee Schedule
- Water Connection Fee (Town of Wickenburg, System 1) — 1" meter$7,511.00 one-timeTown of WickenburgTown of Wickenburg one-time water connection fee for System 1 (the Town system), effective September 1, 2026, set by meter size (rate shown is a 1-inch meter).
- Wastewater Connection Fee (Town of Wickenburg) — System 1, 1" meter$7,962.00 one-timeTown of WickenburgTown of Wickenburg one-time wastewater connection fee for System 1 (the Town system), effective September 1, 2026, set by meter size (rate shown is a 1-inch meter).
- City Development Impact Fee (Town of Wickenburg, Commercial)$0.00Town of WickenburgThe Town of Wickenburg repealed its development impact fees in 2012 and 2013 (Ord. 1111 and Ord. 1118) and levies none on nonresidential construction.
- County Development Impact Fee (Maricopa County, Commercial)$0.00Maricopa CountyMaricopa County does not levy development impact fees.
Where in Maricopa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Wickenburg: Industrial Impact Fees
Industrial development in Wickenburg pays no per-square-foot impact fees, but owes $15,473.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).
For a 50,000 sq ft building, that comes to about $15,473.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Connection Fee (Town of Wickenburg) — System 1, 1" meter ($7,962.00 one-time) and Water Connection Fee (Town of Wickenburg, System 1) — 1" meter ($7,511.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Wickenburg Impact Fee Schedule
- Water Connection Fee (Town of Wickenburg, System 1) — 1" meter$7,511.00 one-timeTown of WickenburgTown of Wickenburg one-time water connection fee for System 1 (the Town system), effective September 1, 2026, set by meter size (rate shown is a 1-inch meter).
- Wastewater Connection Fee (Town of Wickenburg) — System 1, 1" meter$7,962.00 one-timeTown of WickenburgTown of Wickenburg one-time wastewater connection fee for System 1 (the Town system), effective September 1, 2026, set by meter size (rate shown is a 1-inch meter).
- City Development Impact Fee (Town of Wickenburg, Industrial)$0.00Town of WickenburgThe Town of Wickenburg repealed its development impact fees in 2012 and 2013 (Ord. 1111 and Ord. 1118) and levies none on nonresidential construction.
- County Development Impact Fee (Maricopa County, Industrial)$0.00Maricopa CountyMaricopa County does not levy development impact fees.
Where in Maricopa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Wickenburg: Office Impact Fees
Office development in Wickenburg pays no per-square-foot impact fees, but owes $15,473.00 in one-time water and sewer connection fees (rates sourced October 14, 2026).
For a 25,000 sq ft building, that comes to about $15,473.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Connection Fee (Town of Wickenburg) — System 1, 1" meter ($7,962.00 one-time) and Water Connection Fee (Town of Wickenburg, System 1) — 1" meter ($7,511.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Wickenburg Impact Fee Schedule
- Water Connection Fee (Town of Wickenburg, System 1) — 1" meter$7,511.00 one-timeTown of WickenburgTown of Wickenburg one-time water connection fee for System 1 (the Town system), effective September 1, 2026, set by meter size (rate shown is a 1-inch meter).
- Wastewater Connection Fee (Town of Wickenburg) — System 1, 1" meter$7,962.00 one-timeTown of WickenburgTown of Wickenburg one-time wastewater connection fee for System 1 (the Town system), effective September 1, 2026, set by meter size (rate shown is a 1-inch meter).
- City Development Impact Fee (Town of Wickenburg, Office)$0.00Town of WickenburgThe Town of Wickenburg repealed its development impact fees in 2012 and 2013 (Ord. 1111 and Ord. 1118) and levies none on nonresidential construction.
- County Development Impact Fee (Maricopa County, Office)$0.00Maricopa CountyMaricopa County does not levy development impact fees.
Where in Maricopa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Wickenburg Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in Arizona
Arizona cities and towns assess development impact fees (the statute calls them development fees) under A.R.S. 9-463.05 and counties under A.R.S. 11-1102. A fee can only be adopted after the governing body adopts land use assumptions and an infrastructure improvements plan for the service area, with public notice and hearings, and the plan projects demand for no more than ten years.
Fees are limited to necessary public services the statute lists: water, wastewater, stormwater and drainage, streets, fire and police facilities, neighborhood parks of up to 30 acres and, for cities, small libraries. Each fee must be proportionate to the new development's share of the cost, kept in a separate account for that service category and service area, and never used for operations, maintenance or a higher level of service for existing development.
Developers earn credits for facilities they build or dedicate, and a fee that goes unspent for ten years (fifteen for water or wastewater) is refundable with interest on request. For a residential unit the fee is due when the building permit issues unless a development agreement defers it, and a new or increased fee cannot be applied to an approved plat or site plan for 24 months.
Counties and cities each adopt their own schedules. County development fees apply in the county's service areas; inside city limits, development pays the city's fees plus any utility connection charges, which is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of October 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Wickenburg Impact Fee FAQs
What are the total impact fees for a single-family home in Wickenburg, Arizona?
A new single-family home in Wickenburg pays $10,541.65 per unit in combined impact fees (rates sourced October 14, 2026).
How much are commercial impact fees in Wickenburg?
Commercial development in Wickenburg pays no per-square-foot impact fees, but owes $15,473.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Wickenburg charge its own impact fees?
Yes. Wickenburg levies its own municipal impact or utility fees. Maricopa County does not currently add county-level impact fees inside Wickenburg. The schedule on this page shows every fee that applies to development in Wickenburg.
Can Arizona development impact fees increase at any time?
No. Under A.R.S. 9-463.05 and 11-1102 a new or increased fee cannot be adopted on an emergency basis, takes effect only after public notice and hearings (75 days after adoption for a city, 90 for a county), and cannot be applied to a development with an approved final plat or site plan for 24 months unless the plan changes to add service units.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Maricopa County impact fees page.