Seminole County impact fees by project type
Where in Seminole County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Seminole County: Single-Family Impact Fees
A new single-family home in unincorporated Seminole County pays $18,355.00 per unit in impact fees (rates sourced July 18, 2026). All of it is levied by Seminole County.
The largest line items are Educational (School) Impact Fee (Seminole County Public Schools) ($9,000.00), Wastewater Capacity Fee (Seminole County Environmental Services) ($3,175.00) and Road (Mobility) Impact Fee (Seminole County) ($2,714.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Capacity Fee (Seminole County Environmental Services)$2,574.00Seminole County Environmental ServicesWater capacity (connection) fee per single-family dwelling unit. Code Sec. 20.45 / Res. 2021-R-99; Table ES-1 water/wastewater capacity fee review. Applies in county utility service area (unincorporated). Combined water+sewer SF = $5,749.
- Wastewater Capacity Fee (Seminole County Environmental Services)$3,175.00Seminole County Environmental ServicesWastewater capacity (connection) fee per single-family dwelling unit. Code Sec. 20.45 / Res. 2021-R-99; Table ES-1. County utility service area (unincorporated).
- Municipal Impact Fees (Unincorporated Seminole County — None)$0.00Seminole CountyUnincorporated area — no municipal (city) impact fees. County overlay fees (Mobility, Fire, Library, School) captured as County-type records; water/sewer as county utility. $0 placeholder documents the check.
- Educational (School) Impact Fee (Seminole County Public Schools)$9,000.00Seminole County Public SchoolsEducational System Impact Fee, LDC Ch.105 (Ord 2018-1). Single Family (detached) $9,000 flat. Townhome/Condo/Duplex $5,000; Mobile Home $4,700. Imposed COUNTYWIDE (all cities + unincorporated).
- Road (Mobility) Impact Fee (Seminole County)$2,714.00Seminole CountyCondensed Mobility Fee Schedule eff 6/29/2021 (Ord 2021-26 / Res 2021-R-100, Sec 4.40). SF detached 1,500-2,499 sf. Amount shown = SUBURBAN district (representative). Varies by district: Rural $7,312 / Suburban $2,714 / Core $1,811. Tiers: <1,500sf Sub $2,198; >=2,500sf Sub $3,636. Replaced road impact fee.
- Fire & Rescue Impact Fee (Seminole County)$497.00Seminole CountyFire & Rescue System Impact Fee schedule eff 6/29/2021 (Ord 2021-27). SF detached 1,500-2,499 sf tier. Tiers: <1,500sf $440; >=2,500sf $557; affordable $249. Applies in UNINCORPORATED area only (LDC Ch.110).
- Library Impact Fee (Seminole County)$395.00Seminole CountyLibrary System Impact Fee schedule eff 6/29/2021 (Ord 2021-28, LDC Ch.115). SF detached 1,500-2,499 sf tier. Tiers: <1,500sf $351; >=2,500sf $443. Imposed COUNTYWIDE (unincorporated + incorporated).
Where in Seminole County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Seminole County: Multifamily Impact Fees
A new multifamily unit in unincorporated Seminole County pays $12,963.00 per unit in impact fees (rates sourced July 18, 2026). All of it is levied by Seminole County.
The largest line items are Educational (School) Impact Fee (Seminole County Public Schools, MF) ($7,100.00), Wastewater Capacity Fee (Seminole County Environmental Services, MF) ($2,223.00) and Water Capacity Fee (Seminole County Environmental Services, MF) ($1,802.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Capacity Fee (Seminole County Environmental Services, MF)$1,802.00Seminole County Environmental ServicesDwelling units other than single-family charged $1.22/sf living area, min $1,802 / max $2,574 per DU. Minimum applies for units under ~1,477 sf (typical apartment). Code Sec. 20.45 / Res 2021-R-99.
- Wastewater Capacity Fee (Seminole County Environmental Services, MF)$2,223.00Seminole County Environmental ServicesNon-SF dwelling units charged $1.50/sf living area, min $2,223 / max $3,175 per DU. Minimum applies for typical apartment sizes. Sec. 20.45.
- Municipal Impact Fees (Unincorporated Seminole County — None, MF)$0.00Seminole CountyUnincorporated — no municipal (city) impact fees. County overlays captured as County-type records. $0 placeholder documents the check.
- Educational (School) Impact Fee (Seminole County Public Schools, MF)$7,100.00Seminole County Public SchoolsEducational Impact Fee LDC Ch.105. Apartments tiered by size: <850sf $4,900; 851-1,000sf $7,100 (default/representative); 1,001+sf $8,700. Townhome/Condo/Duplex $5,000. Countywide.
- Road (Mobility) Impact Fee (Seminole County, MF, 3+ Floor)$1,237.00Seminole CountyCondensed Mobility Fee Schedule eff 6/29/2021. MF 3+ Floor (default per 4+-story rule): Suburban $1,237 / Core $779 (Rural n/a). MF 1-2 Floor: Suburban $1,665 / Core $1,048. Amount = Suburban (representative).
- Fire & Rescue Impact Fee (Seminole County, MF)$332.00Seminole CountyFire & Rescue Impact Fee (Ord 2021-27), MF 'All Other' $332 (affordable $183). Applies UNINCORPORATED only.
- Library Impact Fee (Seminole County, MF)$269.00Seminole CountyLibrary System Impact Fee (Ord 2021-28), MF 'All Other' $269 (affordable $148). Countywide.
Where in Seminole County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Seminole County: Commercial Impact Fees
Commercial development in unincorporated Seminole County pays $4.31 per square foot in impact fees, plus $12,174.83 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $227,674.83. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Capacity Fee (Seminole County Environmental Services) — 1" meter ($5,302.25 one-time), Water Capacity Fee (Seminole County Environmental Services) — 1" meter ($4,298.58 one-time) and Water Capacity Fee (Seminole County Environmental Services) — 3/4" meter ($2,574.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Road (Mobility) Impact Fee (Seminole County, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Capacity Fee (Seminole County Environmental Services) — 1" meter$4,298.58 one-timeSeminole County Environmental Services water capacity fee (Res. 2021-R-99). $2,574/ERC × 1.67 (1" AWWA factor) = $4,298.58. Canonical 1" default.
- Water Capacity Fee (Seminole County Environmental Services) — 3/4" meter$2,574.00 one-timeSeminole County Environmental Services water capacity fee (Res. 2021-R-99, Code Sec. 20.45). Nonres = $2,574/ERC × AWWA meter-equivalent factor. 3/4" = 1.00 ERC. Nonres may alternatively be avg-daily-flow ÷ LOS.
- Wastewater Capacity Fee (Seminole County Environmental Services) — 1" meter$5,302.25 one-time$3,175/ERC × 1.67 (1" AWWA factor) = $5,302.25. Canonical 1" default.
- Municipal Impact Fees (Unincorporated Seminole County — None, Commercial)$0.00$0 — unincorporated area has no municipal impact fees. County overlay (Mobility, Fire, Library) captured as County-type records.
- Road (Mobility) Impact Fee (Seminole County, Commercial)$3.82/sq ftRequires confirmationSeminole Co. 2020 Condensed Mobility Fee Schedule (Ord. 2021-26, eff. 6/29/2021). Schedule row: Retail (large ≥20 ksf, Shop Ctr.). SUBURB district shown; the unincorporated area spans all 3 districts (Rural $7,369 / Core $2,523) — PARCEL-SPECIFIC, UNCONFIRMED. Retail <20K = $2,777 (Sub).
- Fire & Rescue Impact Fee (Seminole County, Commercial)$0.49/sq ftSeminole Co. Fire & Rescue Impact Fee Schedule (Ord. 2021-27, eff. 6/29/2021), applies in the UNINCORPORATED area. Schedule row: Retail/Shopping Center (per 1,000 sfgla). Discount Superstore $534; Supermarket $784.
- Library Impact Fee (Seminole County, Commercial)$0.00$0 confirmed — Seminole Co. Library Impact Fee (Ord. 2021-28) is RESIDENTIAL-ONLY (schedule has only SF/MF/mobile-home rows, no nonres). County School (Educational) also residential-only, not entered.
Where in Seminole County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Seminole County: Industrial Impact Fees
Industrial development in unincorporated Seminole County pays $1.19 per square foot in impact fees, plus $12,174.83 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $71,524.83. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Capacity Fee (Seminole County Environmental Services) — 1" meter ($5,302.25 one-time), Water Capacity Fee (Seminole County Environmental Services) — 1" meter ($4,298.58 one-time) and Water Capacity Fee (Seminole County Environmental Services) — 3/4" meter ($2,574.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Road (Mobility) Impact Fee (Seminole County, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Capacity Fee (Seminole County Environmental Services) — 1" meter$4,298.58 one-timeSeminole County Environmental Services water capacity fee (Res. 2021-R-99). $2,574/ERC × 1.67 (1" AWWA factor) = $4,298.58. Canonical 1" default.
- Water Capacity Fee (Seminole County Environmental Services) — 3/4" meter$2,574.00 one-timeSeminole County Environmental Services water capacity fee (Res. 2021-R-99, Code Sec. 20.45). Nonres = $2,574/ERC × AWWA meter-equivalent factor. 3/4" = 1.00 ERC. Nonres may alternatively be avg-daily-flow ÷ LOS.
- Wastewater Capacity Fee (Seminole County Environmental Services) — 1" meter$5,302.25 one-time$3,175/ERC × 1.67 (1" AWWA factor) = $5,302.25. Canonical 1" default.
- Municipal Impact Fees (Unincorporated Seminole County — None, Industrial)$0.00$0 — unincorporated area, no municipal impact fees. County overlay captured separately.
- Road (Mobility) Impact Fee (Seminole County, Industrial)$1.02/sq ftRequires confirmationSeminole Co. mobility fee (Ord. 2021-26). Schedule row: Industrial. SUBURB district shown; unincorporated spans all districts (Rural $2,027 / Core $761) — PARCEL-SPECIFIC, UNCONFIRMED. Passive warehouse $401; Active warehouse $1,837 (Sub).
- Fire & Rescue Impact Fee (Seminole County, Industrial)$0.16/sq ftSeminole Co. Fire & Rescue Impact Fee (Ord. 2021-27), unincorporated. Schedule row: General Light Industrial (110). Manufacturing $150; Warehouse $36; Mini-warehouse $13; Utility $342.
- Library Impact Fee (Seminole County, Industrial)$0.00$0 confirmed — county Library Impact Fee is residential-only. School also residential-only.
Where in Seminole County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Seminole County: Office Impact Fees
Office development in unincorporated Seminole County pays $2.13 per square foot in impact fees, plus $12,174.83 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 25,000 sq ft building, that comes to about $65,424.83. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Capacity Fee (Seminole County Environmental Services) — 1" meter ($5,302.25 one-time), Water Capacity Fee (Seminole County Environmental Services) — 1" meter ($4,298.58 one-time) and Water Capacity Fee (Seminole County Environmental Services) — 3/4" meter ($2,574.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Road (Mobility) Impact Fee (Seminole County, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Capacity Fee (Seminole County Environmental Services) — 1" meter$4,298.58 one-timeSeminole County Environmental Services water capacity fee (Res. 2021-R-99). $2,574/ERC × 1.67 (1" AWWA factor) = $4,298.58. Canonical 1" default.
- Water Capacity Fee (Seminole County Environmental Services) — 3/4" meter$2,574.00 one-timeSeminole County Environmental Services water capacity fee (Res. 2021-R-99, Code Sec. 20.45). Nonres = $2,574/ERC × AWWA meter-equivalent factor. 3/4" = 1.00 ERC. Nonres may alternatively be avg-daily-flow ÷ LOS.
- Wastewater Capacity Fee (Seminole County Environmental Services) — 1" meter$5,302.25 one-time$3,175/ERC × 1.67 (1" AWWA factor) = $5,302.25. Canonical 1" default.
- Municipal Impact Fees (Unincorporated Seminole County — None, Office)$0.00$0 — unincorporated area, no municipal impact fees. County overlay captured separately.
- Road (Mobility) Impact Fee (Seminole County, Office)$1.84/sq ftRequires confirmationSeminole Co. mobility fee (Ord. 2021-26). Schedule row: Office. SUBURB district shown; unincorporated spans all districts (Rural $3,614 / Core $1,470) — PARCEL-SPECIFIC, UNCONFIRMED. Medical Office $6,859 (Sub).
- Fire & Rescue Impact Fee (Seminole County, Office)$0.29/sq ftSeminole Co. Fire & Rescue Impact Fee (Ord. 2021-27), unincorporated. Schedule row: Office (710). Medical Office ≤10k $390; >10k $560.
- Library Impact Fee (Seminole County, Office)$0.00$0 confirmed — county Library Impact Fee is residential-only (no nonres rows). School also residential-only.
Estimate your project in Seminole County
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are single-family impact fees in Seminole County, Florida?
A new single-family home in unincorporated Seminole County pays $18,355.00 per unit in impact fees (rates sourced July 18, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.
How much are multifamily impact fees in Seminole County?
Multifamily development in unincorporated Seminole County pays $12,963.00 per unit in impact fees (rates sourced July 18, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.
How much are commercial impact fees in Seminole County?
Commercial development in unincorporated Seminole County pays $4.31 per square foot in impact fees, plus $12,174.83 in one-time water and sewer connection fees (assuming a 1-inch meter), about $227,674.83 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Do cities in Seminole County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 7 of 7 cities in Seminole County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.