IMPACTFEES.ORG

Longwood, Florida Impact Fees

Longwood applies its own fee schedule: municipal fees plus the Seminole County-levied fees that apply inside city limits. Combined, a new single-family home pays $15,506.00 per unit (rates sourced July 18, 2026). The full breakdown is below.

Longwood impact fees by project type

Longwood: Single-Family Impact Fees

A new single-family home in Longwood pays $15,506.00 per unit in impact fees (rates sourced July 18, 2026). Of that, Seminole County-levied fees account for $9,395.00 and municipal or utility fees for $6,111.00.

The largest line items are Educational (School) Impact Fee (Seminole County Public Schools) ($9,000.00), Wastewater Development Assistance Fee (City of Longwood) — 300 GPD × $4.17/GPD ($1,251.00) and Water Development Assistance Fee (City of Longwood) — 300 GPD × $3.77/GPD ($1,131.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,131.00
  • Water Development Assistance Fee (City of Longwood) — 300 GPD × $3.77/GPD
    City of Longwood
    CONFIRMED. Rate $3.77/GPD from Code Appendix B §90-181(6) (Ord. 21-2215, 3/7/2022); GPD table at §90-112 assigns SF = 300 GPD → $1,131.00. Water meter connection (installation) fee $630 (¾") charged separately. NOTE: the western portion of Longwood is served by Sunshine Water Services (private) — city fees do not apply there.
    $1,131.00
Sewer$1,251.00
  • Wastewater Development Assistance Fee (City of Longwood) — 300 GPD × $4.17/GPD
    City of Longwood
    CONFIRMED. Rate $4.17/GPD, Code Appendix B §90-181(6) (Ord. 21-2215, 3/7/2022); §90-112 SF = 300 GPD → $1,251.00. The Code EXPRESSLY provides that the Seminole County wastewater capacity fee is charged IN ADDITION. Wastewater connection fee $550 per separately metered residential unit charged separately.
    $1,251.00
City$3,729.00
County$9,395.00
Total (Longwood): $15,506.00
Sources last checked July 18, 2026Official fee schedules:City of Longwood Seminole County Public Schools Seminole County

Where in Seminole County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Longwood: Multifamily Impact Fees

A new multifamily unit in Longwood pays $12,290.00 per unit in impact fees (rates sourced July 18, 2026). Of that, Seminole County-levied fees account for $7,369.00 and municipal or utility fees for $4,921.00.

The largest line items are Educational (School) Impact Fee (Seminole County Public Schools, MF) ($7,100.00), Wastewater Development Assistance Fee (City of Longwood, MF) — 250 GPD × $4.17/GPD ($1,042.50) and Mobility Fee (City of Longwood, MF) — 1,000 sf canonical unit × $975/1,000 sf ($975.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$942.50
Sewer$1,042.50
City$2,936.00
County$7,369.00
Total (Longwood): $12,290.00
Sources last checked July 18, 2026Official fee schedules:City of Longwood Seminole County Public Schools Seminole County

Where in Seminole County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Longwood: Commercial Impact Fees

Commercial development in Longwood pays $4.29 per square foot in impact fees, plus $7,684.25 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $222,184.25. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Development Assistance Fee (City of Longwood) — per GPD × $4.17 ($1,251.00 one-time), Water Development Assistance Fee (City of Longwood) — per GPD × $3.77 ($1,131.00 one-time) and Mobility Fee (City of Longwood, Commercial) ($2.75/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Capacity Fee (Seminole County Environmental Services, via Longwood) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$1,131.00 one-time
  • Water Development Assistance Fee (City of Longwood) — per GPD × $3.77
    Code Appendix B §90-181(6) (Ord. 21-2215). $3.77/GPD; GPD by use per §90-112. Amount shown = 1-ERU basis (SF 300 GPD = $1,131). NONRES = estimated gpd × $3.77. Meter connection (installation) fee $630 (¾") separate. ⚠ Western Longwood is served by Sunshine Water Services (private) — city fees do not apply there.
    $1,131.00 one-time
Sewer$6,553.25 one-time
  • Wastewater Capacity Fee (Seminole County Environmental Services, via Longwood) — 1" meter
    Seminole County wastewater capacity fee (Res. 2021-R-99) charged IN ADDITION to the Longwood city wastewater dev-assistance fee per Longwood Code. Nonres = $3,175/ERC × AWWA meter factor; 1" meter = 1.67 ERC = $5,302.25 (default). ¾"(1.0)=$3,175; 1.5"(3.33)=$10,573; 2"(5.33)=$16,923. UNCONFIRMED: exact county-fee amount per Longwood nonres connection — verify 407-260-3440.
    $5,302.25 one-timeRequires confirmation
  • Wastewater Development Assistance Fee (City of Longwood) — per GPD × $4.17
    Code Appendix B §90-181(6) (Ord. 21-2215). $4.17/GPD; GPD by use per §90-112. Amount shown = 1-ERU basis (SF 300 GPD = $1,251). NONRES = estimated gpd × $4.17. Wastewater connection fee $550 separate. NOTE: the Seminole County wastewater capacity fee (separate record) is charged IN ADDITION per the Code.
    $1,251.00 one-time
City$4.29/sq ft
County$0.00
Total (Longwood): $4.29/sq ft + $7,684.25 one-time (≈ $222,184.25 at 50,000 sq ft)
Sources last checked July 18, 2026
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Seminole County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Longwood: Industrial Impact Fees

Industrial development in Longwood pays $0.80 per square foot in impact fees, plus $7,684.25 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $47,584.25. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Development Assistance Fee (City of Longwood) — per GPD × $4.17 ($1,251.00 one-time), Water Development Assistance Fee (City of Longwood) — per GPD × $3.77 ($1,131.00 one-time) and Mobility Fee (City of Longwood, Industrial) ($0.37/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Capacity Fee (Seminole County Environmental Services, via Longwood) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$1,131.00 one-time
  • Water Development Assistance Fee (City of Longwood) — per GPD × $3.77
    Code Appendix B §90-181(6) (Ord. 21-2215). $3.77/GPD; GPD by use per §90-112. Amount shown = 1-ERU basis (SF 300 GPD = $1,131). NONRES = estimated gpd × $3.77. Meter connection (installation) fee $630 (¾") separate. ⚠ Western Longwood is served by Sunshine Water Services (private) — city fees do not apply there.
    $1,131.00 one-time
Sewer$6,553.25 one-time
  • Wastewater Capacity Fee (Seminole County Environmental Services, via Longwood) — 1" meter
    Seminole County wastewater capacity fee (Res. 2021-R-99) charged IN ADDITION to the Longwood city wastewater dev-assistance fee per Longwood Code. Nonres = $3,175/ERC × AWWA meter factor; 1" meter = 1.67 ERC = $5,302.25 (default). ¾"(1.0)=$3,175; 1.5"(3.33)=$10,573; 2"(5.33)=$16,923. UNCONFIRMED: exact county-fee amount per Longwood nonres connection — verify 407-260-3440.
    $5,302.25 one-timeRequires confirmation
  • Wastewater Development Assistance Fee (City of Longwood) — per GPD × $4.17
    Code Appendix B §90-181(6) (Ord. 21-2215). $4.17/GPD; GPD by use per §90-112. Amount shown = 1-ERU basis (SF 300 GPD = $1,251). NONRES = estimated gpd × $4.17. Wastewater connection fee $550 separate. NOTE: the Seminole County wastewater capacity fee (separate record) is charged IN ADDITION per the Code.
    $1,251.00 one-time
City$0.80/sq ft
County$0.00
Total (Longwood): $0.80/sq ft + $7,684.25 one-time (≈ $47,584.25 at 50,000 sq ft)
Sources last checked July 18, 2026
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Seminole County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Longwood: Office Impact Fees

Office development in Longwood pays $2.04 per square foot in impact fees, plus $7,684.25 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 25,000 sq ft building, that comes to about $58,784.25. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Development Assistance Fee (City of Longwood) — per GPD × $4.17 ($1,251.00 one-time), Water Development Assistance Fee (City of Longwood) — per GPD × $3.77 ($1,131.00 one-time) and Mobility Fee (City of Longwood, Office) ($1.18/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Capacity Fee (Seminole County Environmental Services, via Longwood) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$1,131.00 one-time
  • Water Development Assistance Fee (City of Longwood) — per GPD × $3.77
    Code Appendix B §90-181(6) (Ord. 21-2215). $3.77/GPD; GPD by use per §90-112. Amount shown = 1-ERU basis (SF 300 GPD = $1,131). NONRES = estimated gpd × $3.77. Meter connection (installation) fee $630 (¾") separate. ⚠ Western Longwood is served by Sunshine Water Services (private) — city fees do not apply there.
    $1,131.00 one-time
Sewer$6,553.25 one-time
  • Wastewater Capacity Fee (Seminole County Environmental Services, via Longwood) — 1" meter
    Seminole County wastewater capacity fee (Res. 2021-R-99) charged IN ADDITION to the Longwood city wastewater dev-assistance fee per Longwood Code. Nonres = $3,175/ERC × AWWA meter factor; 1" meter = 1.67 ERC = $5,302.25 (default). ¾"(1.0)=$3,175; 1.5"(3.33)=$10,573; 2"(5.33)=$16,923. UNCONFIRMED: exact county-fee amount per Longwood nonres connection — verify 407-260-3440.
    $5,302.25 one-timeRequires confirmation
  • Wastewater Development Assistance Fee (City of Longwood) — per GPD × $4.17
    Code Appendix B §90-181(6) (Ord. 21-2215). $4.17/GPD; GPD by use per §90-112. Amount shown = 1-ERU basis (SF 300 GPD = $1,251). NONRES = estimated gpd × $4.17. Wastewater connection fee $550 separate. NOTE: the Seminole County wastewater capacity fee (separate record) is charged IN ADDITION per the Code.
    $1,251.00 one-time
City$2.04/sq ft
County$0.00
Total (Longwood): $2.04/sq ft + $7,684.25 one-time (≈ $58,784.25 at 25,000 sq ft)
Sources last checked July 18, 2026
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Seminole County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Longwood

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Longwood, Florida?

A new single-family home in Longwood pays $15,506.00 per unit in combined impact fees (rates sourced July 18, 2026).

How much are commercial impact fees in Longwood?

Commercial development in Longwood pays $4.29 per square foot in impact fees, plus $7,684.25 in one-time water and sewer connection fees (assuming a 1-inch meter), about $222,184.25 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Longwood charge its own impact fees?

Yes. Longwood levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Longwood, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Seminole County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000