Oviedo Impact Fees by Project Type
Oviedo: Single-Family Impact Fees
A new single-family home in Oviedo pays $21,980.00 per unit in impact fees (rates sourced July 18, 2026). Of that, Seminole County-levied fees account for $9,395.00 and municipal or utility fees for $12,585.00.
The largest line items are Educational (School) Impact Fee (Seminole County Public Schools) ($9,000.00), Recreation & Parks Impact Fee (City of Oviedo) ($3,237.00) and Mobility Fee (City of Oviedo) — $2,728 per 1,000 sf conditioned area ($2,728.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Oviedo Impact Fee Schedule
- Water Capital Recovery Charge (City of Oviedo) — 1 ERU × $6.64/GPD × 350 GPD$2,325.001 ERU (350 GPD)City of OviedoCity of Oviedo water capital recovery charge: $2,325 per dwelling, derived as 1 ERU (350 GPD) at $6.64/GPD. Meter installation is billed separately.
- Sewer Capital Recovery Charge (City of Oviedo) — Alafaya Service Area, 1 ERU × $8.01/GPD × 300 GPD$2,403.00Alafaya Service Area (1 ERU, 300 GPD)Highest of Oviedo's two sewer service areas — the Alafaya service area at $2,403 per ERU (1 ERU per single-family home); the City System area is lower at $1,140 (see other tier). Where Seminole County provides wastewater treatment, the county capacity fee applies in addition.
- Recreation & Parks Impact Fee (City of Oviedo)$3,237.00City of OviedoCity of Oviedo recreation & parks impact fee: $3,237 per dwelling, effective 3/3/2026 under a four-year phase-in; steps up to $3,596 on 1/1/2027.
- Mobility Fee (City of Oviedo) — $2,728 per 1,000 sf conditioned area$2,728.00per 1,000 sf conditioned area (non-mixed-use)City of OviedoCity of Oviedo Mobility Fee, which replaced the city's earlier transportation/multimodal fee. Residential mobility is charged per 1,000 sf of conditioned dwelling area — there is no per-dwelling-unit rate: $2,728 per 1,000 sf for non-mixed-use (shown) and $2,046 per 1,000 sf for mixed-use. Affordable/workforce housing is instead charged per dwelling at $1,364 (non-mixed-use) / $1,023 (mixed-use). This is the city fee; the county road/mobility fee is not collected in Oviedo.
- Administrative Facilities Impact Fee (City of Oviedo)$822.00City of OviedoCity of Oviedo administrative facilities impact fee: $822 per dwelling, effective 3/3/2026 under a four-year phase-in; steps up to $914 on 1/1/2027.
- Fire Rescue Impact Fee (City of Oviedo)$539.00City of OviedoCity of Oviedo fire rescue impact fee. The Seminole County fire & rescue fee applies only in unincorporated areas and is not levied inside the city. $539 per dwelling under the schedule effective 3/3/2026, which phases in over four annual steps; the amount rises to $599 on 1/1/2027.
- Law Enforcement Impact Fee (City of Oviedo)$531.00City of OviedoCity of Oviedo law enforcement impact fee: $531 per dwelling, effective 3/3/2026 under a four-year phase-in; steps up to $590 on 1/1/2027.
- Educational (School) Impact Fee (Seminole County Public Schools)$9,000.00Seminole County Public SchoolsSeminole County Public Schools educational impact fee, levied countywide including inside Oviedo (effective 6/29/2021). Single-family detached: $9,000 flat per dwelling. One of two county impact fees collected on Oviedo permits (the other is Library); the county road/mobility fee is not collected in the city.
- Library Impact Fee (Seminole County)$395.00Seminole CountySeminole County library impact fee, effective 6/29/2021, levied countywide including inside Oviedo. The amount shown ($395) is the 1,500–2,499 sf single-family tier; smaller homes are $351 and larger homes $443. With the School fee, one of two county impact fees collected on Oviedo permits.
- Road (Mobility) Impact Fee (Seminole County — not collected in Oviedo)$0.00Seminole CountyNot collected. The Seminole County road/mobility impact fee is not levied inside Oviedo — the city levies its own Mobility Fee instead. Only the county School and Library fees are collected on Oviedo permits.
Where in Seminole County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours.
Oviedo: Multifamily Impact Fees
A new multifamily unit in Oviedo pays $19,196.00 per unit in impact fees (rates sourced July 18, 2026). Of that, Seminole County-levied fees account for $7,369.00 and municipal or utility fees for $11,827.00.
The largest line items are Educational (School) Impact Fee (Seminole County Public Schools, MF) ($7,100.00), Recreation & Parks Impact Fee (City of Oviedo, MF) ($2,759.00) and Mobility Fee (City of Oviedo, MF) — 1,000 sf canonical unit × $2,728/1,000 sf ($2,728.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Oviedo Impact Fee Schedule
- Water Capital Recovery Charge (City of Oviedo, MF) — 1 ERU × $6.64/GPD × 350 GPD$2,325.001 ERU per dwelling (350 GPD)City of OviedoCity of Oviedo water capital recovery charge: $2,325 per dwelling unit, derived as 1 ERU (350 GPD) at $6.64/GPD. Oviedo assigns 1 ERU per dwelling regardless of type, so the per-unit multifamily charge equals the single-family charge. Meter installation is billed separately.
- Sewer Capital Recovery Charge (City of Oviedo, MF) — Alafaya Service Area, 1 ERU × $8.01/GPD × 300 GPD$2,403.00Alafaya Service Area (1 ERU, 300 GPD)Highest of Oviedo's two sewer service areas — Alafaya at $2,403 per unit (1 ERU per dwelling); the City System area is lower at $1,140 (see other tier). Where Seminole County provides wastewater treatment, the county capacity fee applies in addition.
- Recreation & Parks Impact Fee (City of Oviedo, MF)$2,759.00City of OviedoCity of Oviedo recreation & parks impact fee: $2,759 per dwelling unit, effective 3/3/2026 under a four-year phase-in; steps up to $3,065 on 1/1/2027.
- Mobility Fee (City of Oviedo, MF) — 1,000 sf canonical unit × $2,728/1,000 sf$2,728.00per 1,000 sf conditioned area (non-mixed-use)City of Oviedo Mobility Fee. Residential mobility is charged per 1,000 sf of conditioned dwelling area with no per-unit rate: $2,728 per 1,000 sf non-mixed-use and $2,046 per 1,000 sf mixed-use. The amount shown reflects a 1,000 sf unit at $2,728 per 1,000 sf. Affordable/workforce housing is instead charged per dwelling at $1,364 / $1,023. The county road/mobility fee is not collected in the city.
- Administrative Facilities Impact Fee (City of Oviedo, MF)$701.00City of Oviedo administrative facilities impact fee: $701 per dwelling unit, effective 3/3/2026 under a four-year phase-in; steps up to $779 on 1/1/2027.
- Fire Rescue Impact Fee (City of Oviedo, MF)$459.00City of Oviedo fire rescue impact fee. The Seminole County fire & rescue fee applies only in unincorporated areas and is not levied inside the city. $459 per dwelling unit, effective 3/3/2026 under a four-year phase-in; steps up to $510 on 1/1/2027.
- Law Enforcement Impact Fee (City of Oviedo, MF)$452.00City of Oviedo law enforcement impact fee: $452 per dwelling unit, effective 3/3/2026 under a four-year phase-in; steps up to $503 on 1/1/2027.
- Educational (School) Impact Fee (Seminole County Public Schools, MF)$7,100.00Apartment 851-1,000 sfSeminole County Public SchoolsSeminole County Public Schools educational impact fee, levied countywide including inside Oviedo (effective 6/29/2021). Multifamily is tiered by unit size; the amount shown ($7,100) is the 851–1,000 sf apartment tier. Other tiers: under 850 sf $4,900; 1,001 sf and up $8,700.
- Library Impact Fee (Seminole County, MF)$269.00Seminole CountySeminole County library impact fee, effective 6/29/2021, levied countywide including inside Oviedo. Multifamily: $269 per unit ($148 for affordable units). With the School fee, one of two county impact fees collected on Oviedo permits.
- Road (Mobility) Impact Fee (Seminole County — not collected in Oviedo, MF)$0.00Seminole CountyNot collected. The Seminole County road/mobility impact fee is not levied inside Oviedo — the city levies its own Mobility Fee instead. Only the county School and Library fees are collected on Oviedo permits.
Where in Seminole County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oviedo: Commercial Impact Fees
Commercial development in Oviedo pays $7.55 per square foot in impact fees, plus $10,030.25 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $387,480.25. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capital Recovery Charge (City of Oviedo) — Alafaya Service Area, per ERU (300 GPD × $8.01) ($2,403.00 one-time), Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64) ($2,325.00 one-time) and Mobility Fee (City of Oviedo, Commercial) ($6.10/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Oviedo Impact Fee Schedule
- Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64)$2,325.00 one-timeCity of Oviedo water capital recovery charge, $2,325 per ERU (1 ERU = 350 gpd); nonresidential amount is by estimated flow. Meter fee billed separately.
- Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter$5,302.25 one-timeRequires confirmationSeminole County wastewater capacity fee, charged in addition to the City of Oviedo sewer connection/impact fee where the county utility serves the parcel. $3,175 per ERC (¾" meter = 1 ERC); larger meters scale by the AWWA meter-equivalent factor (County Res. 2021-R-99).
- Sewer Capital Recovery Charge (City of Oviedo) — Alafaya Service Area, per ERU (300 GPD × $8.01)$2,403.00 one-timeRate shown is the higher of Oviedo's two sewer service areas (Alafaya Service Area, $2,403/ERU); the City Sewer System area is $1,140/ERU. Derived as $8.01/GPD × 300 GPD per ERU.
- Mobility Fee (City of Oviedo, Commercial)$6.10/sq ftCity of Oviedo mobility fee, per 1,000 sq ft; replaces the Seminole County mobility fee.
- Administrative Facilities Impact Fee (City of Oviedo, Commercial)$0.61/sq ftCity of Oviedo administrative facilities impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Fire Rescue Impact Fee (City of Oviedo, Commercial)$0.43/sq ftCity of Oviedo fire rescue impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Law Enforcement Impact Fee (City of Oviedo, Commercial)$0.40/sq ftCity of Oviedo law enforcement impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Road (Mobility) Impact Fee (Seminole County, Commercial)$0.00The Seminole County mobility (transportation) impact fee is not collected within this municipality; Oviedo's mobility fee replaces it.
- Fire & Rescue Impact Fee (Seminole County, Commercial)$0.00The Seminole County fire & rescue impact fee applies only in unincorporated Seminole County; within this municipality it is not charged (the city levies its own fire impact fee).
Where in Seminole County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oviedo: Industrial Impact Fees
Industrial development in Oviedo pays $2.18 per square foot in impact fees, plus $10,030.25 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $118,980.25. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capital Recovery Charge (City of Oviedo) — Alafaya Service Area, per ERU (300 GPD × $8.01) ($2,403.00 one-time), Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64) ($2,325.00 one-time) and Mobility Fee (City of Oviedo, Industrial) ($1.85/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Oviedo Impact Fee Schedule
- Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64)$2,325.00 one-timeCity of Oviedo water capital recovery charge, $2,325 per ERU (1 ERU = 350 gpd); nonresidential amount is by estimated flow. Meter fee billed separately.
- Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter$5,302.25 one-timeRequires confirmationSeminole County wastewater capacity fee, charged in addition to the City of Oviedo sewer connection/impact fee where the county utility serves the parcel. $3,175 per ERC (¾" meter = 1 ERC); larger meters scale by the AWWA meter-equivalent factor (County Res. 2021-R-99).
- Sewer Capital Recovery Charge (City of Oviedo) — Alafaya Service Area, per ERU (300 GPD × $8.01)$2,403.00 one-timeRate shown is the higher of Oviedo's two sewer service areas (Alafaya Service Area, $2,403/ERU); the City Sewer System area is $1,140/ERU. Derived as $8.01/GPD × 300 GPD per ERU.
- Mobility Fee (City of Oviedo, Industrial)$1.85/sq ftCity of Oviedo mobility fee, per 1,000 sq ft; replaces the Seminole County mobility fee.
- Administrative Facilities Impact Fee (City of Oviedo, Industrial)$0.14/sq ftCity of Oviedo administrative facilities impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Fire Rescue Impact Fee (City of Oviedo, Industrial)$0.10/sq ftCity of Oviedo fire rescue impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Law Enforcement Impact Fee (City of Oviedo, Industrial)$0.09/sq ftCity of Oviedo law enforcement impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Fire & Rescue Impact Fee (Seminole County, Industrial)$0.00The Seminole County fire & rescue impact fee applies only in unincorporated Seminole County; within this municipality it is not charged (the city levies its own fire impact fee).
- Road (Mobility) Impact Fee (Seminole County, Industrial)$0.00The Seminole County mobility (transportation) impact fee is not collected within this municipality; Oviedo's mobility fee replaces it.
Where in Seminole County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oviedo: Office Impact Fees
Office development in Oviedo pays $5.33 per square foot in impact fees, plus $10,030.25 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 25,000 sq ft building, that comes to about $143,330.25. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capital Recovery Charge (City of Oviedo) — Alafaya Service Area, per ERU (300 GPD × $8.01) ($2,403.00 one-time), Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64) ($2,325.00 one-time) and Mobility Fee (City of Oviedo, Office) ($4.35/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Oviedo Impact Fee Schedule
- Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64)$2,325.00 one-timeCity of Oviedo water capital recovery charge, $2,325 per ERU (1 ERU = 350 gpd); nonresidential amount is by estimated flow. Meter fee billed separately.
- Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter$5,302.25 one-timeRequires confirmationSeminole County wastewater capacity fee, charged in addition to the City of Oviedo sewer connection/impact fee where the county utility serves the parcel. $3,175 per ERC (¾" meter = 1 ERC); larger meters scale by the AWWA meter-equivalent factor (County Res. 2021-R-99).
- Sewer Capital Recovery Charge (City of Oviedo) — Alafaya Service Area, per ERU (300 GPD × $8.01)$2,403.00 one-timeRate shown is the higher of Oviedo's two sewer service areas (Alafaya Service Area, $2,403/ERU); the City Sewer System area is $1,140/ERU. Derived as $8.01/GPD × 300 GPD per ERU.
- Mobility Fee (City of Oviedo, Office)$4.35/sq ftCity of Oviedo mobility fee, per 1,000 sq ft; replaces the Seminole County mobility fee.
- Administrative Facilities Impact Fee (City of Oviedo, Office)$0.42/sq ftCity of Oviedo administrative facilities impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Fire Rescue Impact Fee (City of Oviedo, Office)$0.30/sq ftCity of Oviedo fire rescue impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Law Enforcement Impact Fee (City of Oviedo, Office)$0.27/sq ftCity of Oviedo law enforcement impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Fire & Rescue Impact Fee (Seminole County, Office)$0.00The Seminole County fire & rescue impact fee applies only in unincorporated Seminole County; within this municipality it is not charged (the city levies its own fire impact fee).
- Road (Mobility) Impact Fee (Seminole County, Office)$0.00The Seminole County mobility (transportation) impact fee is not collected within this municipality; Oviedo's mobility fee replaces it.
Where in Seminole County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oviedo Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Oviedo Impact Fee FAQs
What are the total impact fees for a single-family home in Oviedo, Florida?
A new single-family home in Oviedo pays $21,980.00 per unit in combined impact fees (rates sourced July 18, 2026).
How much are commercial impact fees in Oviedo?
Commercial development in Oviedo pays $7.55 per square foot in impact fees, plus $10,030.25 in one-time water and sewer connection fees (assuming a 1-inch meter), about $387,480.25 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Oviedo charge its own impact fees?
Yes. Oviedo levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Oviedo, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Seminole County impact fees page.