Oviedo impact fees by project type
Oviedo: Single-Family Impact Fees
A new single-family home in Oviedo pays $20,717.00 per unit in impact fees (rates sourced July 18, 2026). Of that, Seminole County-levied fees account for $9,395.00 and municipal or utility fees for $11,322.00.
The largest line items are Educational (School) Impact Fee (Seminole County Public Schools) ($9,000.00), Recreation & Parks Impact Fee (City of Oviedo) ($3,237.00) and Mobility Fee (City of Oviedo) — $2,728 per 1,000 sf conditioned area ($2,728.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Capital Recovery Charge (City of Oviedo) — 1 ERU × $6.64/GPD × 350 GPD$2,325.00City of OviedoCONFIRMED. City of Oviedo Capital Recovery Charges schedule (Res. 2212-10, adopted 8/2/2010). Water = $6.64/GPD × 350 GPD/ERU = $2,325.00 per ERU. One residential dwelling = 1 ERU. Meter fee charged separately.
- Sewer Capital Recovery Charge (City of Oviedo) — City System, 1 ERU × $3.80/GPD × 300 GPD$1,140.00City of OviedoCONFIRMED. Oviedo Capital Recovery Charges (Res. 2212-10, 8/2/2010). City sewer system = $3.80/GPD × 300 GPD/ERU = $1,140.00/ERU. Two other sewer service areas exist: Alafaya Service Area $8.01/GPD = $2,403/ERU (separate tier record); and in the City/County service area the SEMINOLE COUNTY wastewater capacity fee ($3,175/SF DU) is charged IN ADDITION.
- Recreation & Parks Impact Fee (City of Oviedo)$3,237.00City of OviedoCONFIRMED. Ord. 1761 (12/1/2025), eff. 3/3/2026, 4-yr phase-in. 2026 SF = $3,237/du; 1/1/2027 = $3,596. Prior (Ord. 1683) $2,877.
- Mobility Fee (City of Oviedo) — $2,728 per 1,000 sf conditioned area$2,728.00City of OviedoCONFIRMED. Ord. 1761 (2045 Mobility Plan) REPLACED the old Multimodal/Transportation impact fee (was $1,604/du under Ord. 1683). Residential mobility fee is charged PER 1,000 SF of conditioned dwelling area — there is NO per-dwelling-unit rate. $2,728/1,000 sf (non-mixed-use); $2,046/1,000 sf (mixed-use). Affordable/workforce housing is per-DU: $1,364 (non-mixed) / $1,023 (mixed).
- Administrative Facilities Impact Fee (City of Oviedo)$822.00City of OviedoCONFIRMED. Ord. 1761 (12/1/2025), eff. 3/3/2026, 4-yr phase-in. 2026 SF = $822/du; 1/1/2027 = $914. Prior (Ord. 1683) $731.
- Fire Rescue Impact Fee (City of Oviedo)$539.00City of OviedoCONFIRMED. Ord. 1761 (adopted 12/1/2025), effective 3/3/2026 — re-adopted Code Ch.28 impact fees with a 4-year phase-in. 2026 (current) SF = $539/du. Next step 1/1/2027 = $599. Prior schedule (Ord. 1683) was $479.
- Law Enforcement Impact Fee (City of Oviedo)$531.00City of OviedoCONFIRMED. Ord. 1761 (12/1/2025), eff. 3/3/2026, 4-yr phase-in. 2026 SF = $531/du; 1/1/2027 = $590. Prior (Ord. 1683) $472.
- Educational (School) Impact Fee (Seminole County Public Schools)$9,000.00Seminole County Public SchoolsEducational System Impact Fee, LDC Ch.105 (Ord 2018-1). SF $9,000 flat. Imposed countywide incl. City of Oviedo.
- Library Impact Fee (Seminole County)$395.00Seminole CountyLibrary System Impact Fee (Ord 2021-28), SF 1,500-2,499 sf tier. Countywide incl. City of Oviedo.
- Road (Mobility) Impact Fee (Seminole County — not collected in Oviedo)$0.00Seminole County$0 CONFIRMED. Oviedo levies its own Mobility Fee (Ord. 1761); Seminole County's mobility fee is NOT collected inside the city. The only county impact fees collected on Oviedo permits are the School (Educational) and Library fees.
Where in Seminole County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oviedo: Multifamily Impact Fees
A new multifamily unit in Oviedo pays $17,933.00 per unit in impact fees (rates sourced July 18, 2026). Of that, Seminole County-levied fees account for $7,369.00 and municipal or utility fees for $10,564.00.
The largest line items are Educational (School) Impact Fee (Seminole County Public Schools, MF) ($7,100.00), Recreation & Parks Impact Fee (City of Oviedo, MF) ($2,759.00) and Mobility Fee (City of Oviedo, MF) — 1,000 sf canonical unit × $2,728/1,000 sf ($2,728.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Capital Recovery Charge (City of Oviedo, MF) — 1 ERU × $6.64/GPD × 350 GPD$2,325.00City of OviedoCONFIRMED. Oviedo Capital Recovery Charges (Res. 2212-10, 8/2/2010). Water $6.64/GPD × 350 GPD = $2,325.00 per ERU. Oviedo assigns 1 ERU per residential dwelling unit regardless of type, so the MF per-unit charge equals the SFR charge (this is by design, not a copy-paste).
- Sewer Capital Recovery Charge (City of Oviedo, MF) — City System, 1 ERU × $3.80/GPD × 300 GPD$1,140.00City of OviedoCONFIRMED. Oviedo Capital Recovery Charges (Res. 2212-10). City sewer system $3.80/GPD × 300 GPD = $1,140.00 per ERU; 1 ERU per dwelling unit (MF = SFR by design). Alafaya Service Area rate is a separate tier ($2,403). In the City/County service area the Seminole County wastewater capacity fee ($1.50/sf, min $2,223 / max $3,175 per non-SF DU) is charged IN ADDITION.
- Recreation & Parks Impact Fee (City of Oviedo, MF)$2,759.00City of OviedoCONFIRMED. Ord. 1761 (adopted 12/1/2025), eff. 3/3/2026, 4-yr phase-in. 2026 MF = $2,759/du; 1/1/2027 = $3,065. Oviedo's four MF city impact fees total $4,371/du in 2026.
- Mobility Fee (City of Oviedo, MF) — 1,000 sf canonical unit × $2,728/1,000 sf$2,728.00CONFIRMED RATE, DERIVED AMOUNT. Ord. 1761 (2045 Mobility Plan) replaced Oviedo's Multimodal/Transportation impact fee. The residential mobility fee is charged PER 1,000 SF of conditioned dwelling area with NO per-unit rate: $2,728/1,000 sf (non-mixed-use), $2,046/1,000 sf (mixed-use). Amount shown = the canonical 1,000 sf MF unit × $2,728/1,000 sf. Affordable/workforce housing IS per-DU: $1,364 / $1,023.
- Administrative Facilities Impact Fee (City of Oviedo, MF)$701.00CONFIRMED. Ord. 1761 (12/1/2025), eff. 3/3/2026, 4-yr phase-in. 2026 MF = $701/du; 1/1/2027 = $779.
- Fire Rescue Impact Fee (City of Oviedo, MF)$459.00CONFIRMED. Ord. 1761 (12/1/2025), eff. 3/3/2026, 4-yr phase-in. 2026 MF = $459/du; 1/1/2027 = $510.
- Law Enforcement Impact Fee (City of Oviedo, MF)$452.00CONFIRMED. Ord. 1761 (12/1/2025), eff. 3/3/2026, 4-yr phase-in. 2026 MF = $452/du; 1/1/2027 = $503.
- Educational (School) Impact Fee (Seminole County Public Schools, MF)$7,100.00Seminole County Public SchoolsEducational Impact Fee (Ch.105). Apartment 851-1,000sf $7,100 (default). Tiers <850 $4,900 / 1,001+ $8,700. Countywide incl. Oviedo.
- Library Impact Fee (Seminole County, MF)$269.00Seminole CountyLibrary Impact Fee MF 'All Other' $269. Countywide incl. Oviedo.
- Road (Mobility) Impact Fee (Seminole County — not collected in Oviedo, MF)$0.00Seminole County$0 CONFIRMED. Oviedo levies its own Mobility Fee (Ord. 1761); the county mobility fee is not collected in-city. Only county School and Library fees apply on Oviedo permits.
Where in Seminole County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oviedo: Commercial Impact Fees
Commercial development in Oviedo pays $7.55 per square foot in impact fees, plus $8,767.25 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $386,217.25. The calculator below adjusts to your exact square footage.
The largest line items are Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64) ($2,325.00 one-time), Sewer Capital Recovery Charge (City of Oviedo) — City System, per ERU (300 GPD × $3.80) ($1,140.00 one-time) and Mobility Fee (City of Oviedo, Commercial) ($6.10/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64)$2,325.00 one-timeCity of Oviedo Capital Recovery Charges (Res. 2212-10, 8/2/2010). Water = $6.64/GPD × 350 GPD/ERU = $2,325/ERU. NONRES = estimated gpd ÷ 350 × $2,325 (1 ERU = 350 gpd). Amount shown = 1-ERU. Meter fee separate.
- Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter$5,302.25 one-timeRequires confirmationSeminole County wastewater capacity fee (Res. 2021-R-99) charged IN ADDITION to the Oviedo city sewer capital recovery charge in the city/county service area. Nonres = $3,175/ERC × AWWA meter factor; 1" = 1.67 ERC = $5,302.25 (default). ¾"(1.0)=$3,175; 1.5"(3.33)=$10,573. UNCONFIRMED: exact applicability/amount per Oviedo nonres connection — verify 407-971-5794.
- Sewer Capital Recovery Charge (City of Oviedo) — City System, per ERU (300 GPD × $3.80)$1,140.00 one-timeOviedo Capital Recovery Charges (Res. 2212-10). City Sewer System = $3.80/GPD × 300 GPD/ERU = $1,140/ERU (canonical). NONRES = estimated gpd × $3.80. Alafaya Service Area tier = $2,403/ERU (separate record). NOTE: in the city/county service area the Seminole County wastewater capacity fee (separate record) is charged IN ADDITION.
- Mobility Fee (City of Oviedo, Commercial)$6.10/sq ftCode Ch.28 mobility fee schedule (2045 Mobility Plan, Ord. 1749/1761). Non-mixed-use, schedule row: Retail (Discount/Entertainment/Financial/Retail/Services/Superstore). Small Retail $3,882 / High Impact Retail $15,723 / Convenience $46,706. Mixed-use $4,578. Per 1,000 sf. CONFIRMED (codified rate matches current residential $2,728/1000sf). Replaces the Seminole County mobility fee. City Recreation & Parks fee is residential-only ($0 nonres).
- Administrative Facilities Impact Fee (City of Oviedo, Commercial)$0.61/sq ftOviedo Ord. 1761 (adopted 12/1/2025, eff. 3/3/2026), Code Ch. 28. Administrative Facilities nonres per 1,000 sf; Commercial = general Retail row $612 (2026 col; phases up 1/1/2027–2029). Supersedes Ord. 1683 ($544). Source: Oviedo PrimeGov 12/1/2025 mtg, Ord 1761 Ex.1. Resolved on audit 2026-07-18.
- Fire Rescue Impact Fee (City of Oviedo, Commercial)$0.43/sq ftOviedo Ord. 1761 (adopted 12/1/2025, eff. 3/3/2026), Code Ch. 28. Fire & Rescue nonres per 1,000 sf; Commercial = general Retail row $435 (2026 col; phases up 1/1/2027–2029). Supersedes Ord. 1683 ($387). Source: Oviedo PrimeGov 12/1/2025 mtg, Ord 1761 Ex.1 (not yet in Municode). Resolved on audit 2026-07-18.
- Law Enforcement Impact Fee (City of Oviedo, Commercial)$0.40/sq ftOviedo Ord. 1761 (adopted 12/1/2025, eff. 3/3/2026), Code Ch. 28. Law Enforcement nonres per 1,000 sf; Commercial = general Retail row $398 (2026 col; phases up 1/1/2027–2029). Supersedes Ord. 1683 ($354). Source: Oviedo PrimeGov 12/1/2025 mtg, Ord 1761 Ex.1. Resolved on audit 2026-07-18.
- Road (Mobility) Impact Fee (Seminole County, Commercial)$0.00$0 confirmed — Oviedo's mobility fee (Code Ch.28) REPLACES the Seminole County mobility fee (§28-2(c)). County Library residential-only; School residential-only.
- Fire & Rescue Impact Fee (Seminole County, Commercial)$0.00$0 confirmed — county Fire & Rescue impact fee is unincorporated-only; Oviedo levies its own fire rescue fee.
Where in Seminole County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oviedo: Industrial Impact Fees
Industrial development in Oviedo pays $2.18 per square foot in impact fees, plus $8,767.25 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $117,717.25. The calculator below adjusts to your exact square footage.
The largest line items are Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64) ($2,325.00 one-time), Sewer Capital Recovery Charge (City of Oviedo) — City System, per ERU (300 GPD × $3.80) ($1,140.00 one-time) and Mobility Fee (City of Oviedo, Industrial) ($1.85/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64)$2,325.00 one-timeCity of Oviedo Capital Recovery Charges (Res. 2212-10, 8/2/2010). Water = $6.64/GPD × 350 GPD/ERU = $2,325/ERU. NONRES = estimated gpd ÷ 350 × $2,325 (1 ERU = 350 gpd). Amount shown = 1-ERU. Meter fee separate.
- Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter$5,302.25 one-timeRequires confirmationSeminole County wastewater capacity fee (Res. 2021-R-99) charged IN ADDITION to the Oviedo city sewer capital recovery charge in the city/county service area. Nonres = $3,175/ERC × AWWA meter factor; 1" = 1.67 ERC = $5,302.25 (default). ¾"(1.0)=$3,175; 1.5"(3.33)=$10,573. UNCONFIRMED: exact applicability/amount per Oviedo nonres connection — verify 407-971-5794.
- Sewer Capital Recovery Charge (City of Oviedo) — City System, per ERU (300 GPD × $3.80)$1,140.00 one-timeOviedo Capital Recovery Charges (Res. 2212-10). City Sewer System = $3.80/GPD × 300 GPD/ERU = $1,140/ERU (canonical). NONRES = estimated gpd × $3.80. Alafaya Service Area tier = $2,403/ERU (separate record). NOTE: in the city/county service area the Seminole County wastewater capacity fee (separate record) is charged IN ADDITION.
- Mobility Fee (City of Oviedo, Industrial)$1.85/sq ftCode Ch.28 mobility schedule, row Industrial (Assembly, Brewing, Distribution, Fabrication, Flex, Manufacturing, Warehouse, Utilities). Mixed-use $1,385. Per 1,000 sf. CONFIRMED. Replaces county mobility fee.
- Administrative Facilities Impact Fee (City of Oviedo, Industrial)$0.14/sq ftOviedo Ord. 1761 (adopted 12/1/2025, eff. 3/3/2026), Code Ch. 28. Administrative Facilities nonres per 1,000 sf; General Light Industrial row $141 (2026 col; phases up 1/1/2027–2029). Supersedes Ord. 1683 ($173). Source: Oviedo PrimeGov 12/1/2025 mtg, Ord 1761 Ex.1. Resolved on audit 2026-07-18.
- Fire Rescue Impact Fee (City of Oviedo, Industrial)$0.10/sq ftOviedo Ord. 1761 (adopted 12/1/2025, eff. 3/3/2026), Code Ch. 28. Fire & Rescue nonres per 1,000 sf; General Light Industrial row $100 (2026 col; phases up 1/1/2027–2029). Supersedes Ord. 1683 ($123). Source: Oviedo PrimeGov 12/1/2025 mtg, Ord 1761 Ex.1. Resolved on audit 2026-07-18.
- Law Enforcement Impact Fee (City of Oviedo, Industrial)$0.09/sq ftOviedo Ord. 1761 (adopted 12/1/2025, eff. 3/3/2026), Code Ch. 28. Law Enforcement nonres per 1,000 sf; General Light Industrial row $92 (2026 col; phases up 1/1/2027–2029). Supersedes Ord. 1683 ($113). Source: Oviedo PrimeGov 12/1/2025 mtg, Ord 1761 Ex.1. Resolved on audit 2026-07-18.
- Fire & Rescue Impact Fee (Seminole County, Industrial)$0.00$0 confirmed — county Fire & Rescue impact fee is unincorporated-only; Oviedo levies its own.
- Road (Mobility) Impact Fee (Seminole County, Industrial)$0.00$0 confirmed — Oviedo mobility fee replaces county mobility fee. County Library residential-only; School residential-only.
Where in Seminole County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oviedo: Office Impact Fees
Office development in Oviedo pays $5.33 per square foot in impact fees, plus $8,767.25 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 25,000 sq ft building, that comes to about $142,067.25. The calculator below adjusts to your exact square footage.
The largest line items are Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64) ($2,325.00 one-time), Sewer Capital Recovery Charge (City of Oviedo) — City System, per ERU (300 GPD × $3.80) ($1,140.00 one-time) and Mobility Fee (City of Oviedo, Office) ($4.35/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64)$2,325.00 one-timeCity of Oviedo Capital Recovery Charges (Res. 2212-10, 8/2/2010). Water = $6.64/GPD × 350 GPD/ERU = $2,325/ERU. NONRES = estimated gpd ÷ 350 × $2,325 (1 ERU = 350 gpd). Amount shown = 1-ERU. Meter fee separate.
- Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter$5,302.25 one-timeRequires confirmationSeminole County wastewater capacity fee (Res. 2021-R-99) charged IN ADDITION to the Oviedo city sewer capital recovery charge in the city/county service area. Nonres = $3,175/ERC × AWWA meter factor; 1" = 1.67 ERC = $5,302.25 (default). ¾"(1.0)=$3,175; 1.5"(3.33)=$10,573. UNCONFIRMED: exact applicability/amount per Oviedo nonres connection — verify 407-971-5794.
- Sewer Capital Recovery Charge (City of Oviedo) — City System, per ERU (300 GPD × $3.80)$1,140.00 one-timeOviedo Capital Recovery Charges (Res. 2212-10). City Sewer System = $3.80/GPD × 300 GPD/ERU = $1,140/ERU (canonical). NONRES = estimated gpd × $3.80. Alafaya Service Area tier = $2,403/ERU (separate record). NOTE: in the city/county service area the Seminole County wastewater capacity fee (separate record) is charged IN ADDITION.
- Mobility Fee (City of Oviedo, Office)$4.35/sq ftCode Ch.28 mobility schedule, row Office (General, Higher Education, Hospital, Professional). Medical Office $12,557. Mixed-use $3,259. Per 1,000 sf. CONFIRMED. Replaces county mobility fee.
- Administrative Facilities Impact Fee (City of Oviedo, Office)$0.42/sq ftOviedo Ord. 1761 (adopted 12/1/2025, eff. 3/3/2026), Code Ch. 28. Administrative Facilities nonres per 1,000 sf; General Office row $417 (2026 col; phases up 1/1/2027–2029). Supersedes Ord. 1683 ($313). Source: Oviedo PrimeGov 12/1/2025 mtg, Ord 1761 Ex.1. Resolved on audit 2026-07-18.
- Fire Rescue Impact Fee (City of Oviedo, Office)$0.30/sq ftOviedo Ord. 1761 (adopted 12/1/2025, eff. 3/3/2026), Code Ch. 28. Fire & Rescue nonres per 1,000 sf; General Office row $297 (2026 col; phases up 1/1/2027–2029). Supersedes Ord. 1683 ($223). Source: Oviedo PrimeGov 12/1/2025 mtg, Ord 1761 Ex.1. Resolved on audit 2026-07-18.
- Law Enforcement Impact Fee (City of Oviedo, Office)$0.27/sq ftOviedo Ord. 1761 (adopted 12/1/2025, eff. 3/3/2026), Code Ch. 28. Law Enforcement nonres per 1,000 sf; General Office row $272 (2026 col; phases up 1/1/2027–2029). Supersedes Ord. 1683 ($204). Source: Oviedo PrimeGov 12/1/2025 mtg, Ord 1761 Ex.1. Resolved on audit 2026-07-18.
- Fire & Rescue Impact Fee (Seminole County, Office)$0.00$0 confirmed — county Fire & Rescue impact fee is unincorporated-only; Oviedo levies its own.
- Road (Mobility) Impact Fee (Seminole County, Office)$0.00$0 confirmed — Oviedo mobility fee replaces county mobility fee. County Library residential-only; School residential-only.
Where in Seminole County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Oviedo
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Oviedo, Florida?
A new single-family home in Oviedo pays $20,717.00 per unit in combined impact fees (rates sourced July 18, 2026).
How much are commercial impact fees in Oviedo?
Commercial development in Oviedo pays $7.55 per square foot in impact fees, plus $8,767.25 in one-time water and sewer connection fees (assuming a 1-inch meter), about $386,217.25 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Oviedo charge its own impact fees?
Yes. Oviedo levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Oviedo, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.