Oviedo Impact Fees by Project Type
Oviedo: Single-Family Impact Fees
A new single-family home in Oviedo pays $26,620.00 per unit in impact fees (rates sourced October 9, 2026). Of that, Seminole County-levied fees account for $13,710.00 and municipal or utility fees for $12,910.00.
The largest line items are Educational (School) Impact Fee (Seminole County Public Schools) ($9,000.00), Mobility Fee (City of Oviedo) ($5,456.00) and Sewer Capital Recovery Charge (City of Oviedo) — City/County Area, 1 ERU × $3.80/GPD × 300 GPD + Seminole County $3,175/DU ($4,315.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Oviedo Impact Fee Schedule
- Water Capital Recovery Charge (City of Oviedo) — 1 ERU × $6.64/GPD × 350 GPD$2,325.001 ERU (350 GPD)City of OviedoCity of Oviedo water capital recovery charge: $2,325 per dwelling, derived as 1 ERU (350 GPD) at $6.64/GPD. Meter installation is billed separately.
- Sewer Capital Recovery Charge (City of Oviedo) — City/County Area, 1 ERU × $3.80/GPD × 300 GPD + Seminole County $3,175/DU$4,315.00City of Oviedo (with Seminole County Environmental Services)Highest of Oviedo's two sewer service areas. In the City/County area a new single-family home pays the city's $1,140 sewer capital recovery charge (1 ERU at $3.80 per gallon per day, 300 GPD) plus the Seminole County wastewater capacity fee of $3,175, which treats the area's wastewater, for $4,315 in all. Homes in the Alafaya service area pay a single city charge of $2,403 instead (see the other tier).
- Mobility Fee (City of Oviedo)$5,456.002,000 sq ft home at $2,728 per 1,000 sq ftCity of OviedoCity of Oviedo Mobility Fee, which replaced the city's earlier transportation/multimodal fee. Residential mobility is charged per 1,000 sf of conditioned living area, with no per-dwelling rate: $2,728 per 1,000 sf (non-mixed-use) and $2,046 per 1,000 sf (mixed-use). The amount shown is for a 2,000 sf home at the non-mixed-use rate. Affordable/workforce housing is instead charged per dwelling at $1,364 (non-mixed-use) or $1,023 (mixed-use). The county road/mobility fee is not collected in Oviedo.
- Recreation & Parks Impact Fee (City of Oviedo)$3,237.00City of OviedoCity of Oviedo recreation & parks impact fee: $3,237 per dwelling, effective 3/3/2026 under a four-year phase-in; steps up to $3,596 on 1/1/2027.
- Administrative Facilities Impact Fee (City of Oviedo)$822.00City of OviedoCity of Oviedo administrative facilities impact fee: $822 per dwelling, effective 3/3/2026 under a four-year phase-in; steps up to $914 on 1/1/2027.
- Fire Rescue Impact Fee (City of Oviedo)$539.00City of OviedoCity of Oviedo fire rescue impact fee. The Seminole County fire & rescue fee applies only in unincorporated areas and is not levied inside the city. $539 per dwelling under the schedule effective 3/3/2026, which phases in over four annual steps; the amount rises to $599 on 1/1/2027.
- Law Enforcement Impact Fee (City of Oviedo)$531.00City of OviedoCity of Oviedo law enforcement impact fee: $531 per dwelling, effective 3/3/2026 under a four-year phase-in; steps up to $590 on 1/1/2027.
- Educational (School) Impact Fee (Seminole County Public Schools)$9,000.00Seminole County Public SchoolsSeminole County Public Schools educational impact fee, levied countywide including inside Oviedo (effective 6/29/2021). Single-family detached: $9,000 flat per dwelling. One of two county impact fees collected on Oviedo permits (the other is Library); the county road/mobility fee is not collected in the city.
- Library Impact Fee (Seminole County)$395.001,500-2,499 sfSeminole CountySeminole County library impact fee, effective 6/29/2021, charged countywide (the unincorporated area and every city). $395 for a single-family home of 1,500 to 2,499 sq ft; $351 under 1,500 sq ft and $443 for 2,500 sq ft or more (see the other tiers).
- Road (Mobility) Impact Fee (Seminole County)$0.00Seminole CountyThe Seminole County mobility fee is not charged on Oviedo permits. Under the county's 2025 interlocal agreement with the city, Oviedo's own mobility fee replaced both the county fee and the city's earlier transportation fee, and the city shares part of its collections with the county. Only the county school and library fees are collected on Oviedo permits.
Where in Seminole County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oviedo: Multifamily Impact Fees
A new multifamily unit in Oviedo pays $20,156.00 per unit in impact fees (rates sourced October 9, 2026). Of that, Seminole County-levied fees account for $10,732.00 and municipal or utility fees for $9,424.00.
The largest line items are Educational (School) Impact Fee (Seminole County Public Schools, MF) ($7,100.00), Sewer Capital Recovery Charge (City of Oviedo, MF) — City/County Area, 1 ERU × $3.80/GPD × 300 GPD + Seminole County 1,000 sf × $1.50/sf (min $2,223) ($3,363.00) and Recreation & Parks Impact Fee (City of Oviedo, MF) ($2,759.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Oviedo Impact Fee Schedule
- Water Capital Recovery Charge (City of Oviedo, MF) — 1 ERU × $6.64/GPD × 350 GPD$2,325.001 ERU per dwelling (350 GPD)City of OviedoCity of Oviedo water capital recovery charge: $2,325 per dwelling unit, derived as 1 ERU (350 GPD) at $6.64/GPD. Oviedo assigns 1 ERU per dwelling regardless of type, so the per-unit multifamily charge equals the single-family charge. Meter installation is billed separately.
- Sewer Capital Recovery Charge (City of Oviedo, MF) — City/County Area, 1 ERU × $3.80/GPD × 300 GPD + Seminole County 1,000 sf × $1.50/sf (min $2,223)$3,363.00City of Oviedo (with Seminole County Environmental Services)Highest of Oviedo's two sewer service areas. In the City/County area each new apartment pays the city's $1,140 sewer capital recovery charge (1 ERU per dwelling) plus the Seminole County wastewater capacity fee of $1.50 per sq ft of living area (minimum $2,223, maximum $3,175 per unit). The amount shown is for a 1,000 sf unit, where the county minimum applies: $3,363 in all. Units in the Alafaya service area pay a single city charge of $2,403 instead (see the other tier).
- Recreation & Parks Impact Fee (City of Oviedo, MF)$2,759.00City of OviedoCity of Oviedo recreation & parks impact fee: $2,759 per dwelling unit, effective 3/3/2026 under a four-year phase-in; steps up to $3,065 on 1/1/2027.
- Mobility Fee (City of Oviedo, MF)$2,728.001,000 sq ft unit at $2,728 per 1,000 sq ftCity of OviedoCity of Oviedo Mobility Fee. Residential mobility is charged per 1,000 sf of conditioned dwelling area with no per-unit rate: $2,728 per 1,000 sf non-mixed-use and $2,046 per 1,000 sf mixed-use. The amount shown reflects a 1,000 sf unit at $2,728 per 1,000 sf. Affordable/workforce housing is instead charged per dwelling at $1,364 / $1,023. The county road/mobility fee is not collected in the city.
- Administrative Facilities Impact Fee (City of Oviedo, MF)$701.00City of OviedoCity of Oviedo administrative facilities impact fee: $701 per dwelling unit, effective 3/3/2026 under a four-year phase-in; steps up to $779 on 1/1/2027.
- Fire Rescue Impact Fee (City of Oviedo, MF)$459.00City of OviedoCity of Oviedo fire rescue impact fee. The Seminole County fire & rescue fee applies only in unincorporated areas and is not levied inside the city. $459 per dwelling unit, effective 3/3/2026 under a four-year phase-in; steps up to $510 on 1/1/2027.
- Law Enforcement Impact Fee (City of Oviedo, MF)$452.00City of OviedoCity of Oviedo law enforcement impact fee: $452 per dwelling unit, effective 3/3/2026 under a four-year phase-in; steps up to $503 on 1/1/2027.
- Educational (School) Impact Fee (Seminole County Public Schools, MF)$7,100.00Apartment 851-1,000 sfSeminole County Public SchoolsSeminole County Public Schools educational impact fee, effective 6/29/2021 (rates unchanged since Ord. 2018-1), charged countywide. Apartments are tiered by unit size: $7,100 for 851 to 1,000 sq ft (shown), $4,900 under 850 sq ft, $8,700 for 1,001 sq ft or more; townhomes, condominiums and duplexes pay $5,000 (see the other tiers).
- Library Impact Fee (Seminole County, MF)$269.00Seminole CountySeminole County library impact fee, effective 6/29/2021, levied countywide including inside Oviedo. Multifamily: $269 per unit ($148 for affordable units). With the School fee, one of two county impact fees collected on Oviedo permits.
- Road (Mobility) Impact Fee (Seminole County, MF)$0.00Seminole CountyThe Seminole County mobility fee is not charged on Oviedo permits. Under the county's 2025 interlocal agreement with the city, Oviedo's own mobility fee replaced both the county fee and the city's earlier transportation fee, and the city shares part of its collections with the county. Only the county school and library fees are collected on Oviedo permits.
Where in Seminole County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oviedo: Commercial Impact Fees
Commercial development in Oviedo pays $7.55 per square foot in impact fees, plus $8,767.25 in one-time water and sewer connection fees (rates sourced October 9, 2026).
For a 50,000 sq ft building, that comes to about $386,217.25. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter ($5,302.25 one-time), Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64) ($2,325.00 one-time) and Sewer Capital Recovery Charge (City of Oviedo) — City/County Area, per ERU (300 GPD × $3.80) ($1,140.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Oviedo Impact Fee Schedule
- Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64)$2,325.00 one-timeCity of Oviedo water capital recovery charge, $2,325 per ERU (1 ERU = 350 gpd); nonresidential amount is by estimated flow. Meter fee billed separately.
- Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter$5,302.25 one-timeSeminole County wastewater capacity fee, charged in Oviedo's City/County sewer service area in addition to the city's sewer capital recovery charge: $3,175 per ERC times the meter's equivalent factor (3/4" = 1, 1" = 1.67, up to 12" = 143.33). Not charged in the Alafaya service area.
- Sewer Capital Recovery Charge (City of Oviedo) — City/County Area, per ERU (300 GPD × $3.80)$1,140.00 one-timeHighest of Oviedo's two sewer service areas once the county charge is counted. In the City/County area the city charges $3.80 per gallon per day of estimated flow (minimum 300 GPD, $1,140), and the Seminole County wastewater capacity fee, priced by meter size, is charged in addition (separate line). The Alafaya service area pays a single city charge of $8.01 per gallon per day instead.
- Mobility Fee (City of Oviedo, Commercial)$6.10/sq ftCity of Oviedo mobility fee, per 1,000 sq ft; replaces the Seminole County mobility fee.
- Administrative Facilities Impact Fee (City of Oviedo, Commercial)$0.61/sq ftCity of Oviedo administrative facilities impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Fire Rescue Impact Fee (City of Oviedo, Commercial)$0.43/sq ftCity of Oviedo fire rescue impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Law Enforcement Impact Fee (City of Oviedo, Commercial)$0.40/sq ftCity of Oviedo law enforcement impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Recreation & Parks Impact Fee (City of Oviedo, Commercial)$0.00City of OviedoThe City of Oviedo parks and recreation impact fee applies to residential development only; nonresidential buildings pay none.
- Road (Mobility) Impact Fee (Seminole County, Commercial)$0.00The Seminole County mobility (transportation) impact fee is not collected within this municipality; Oviedo's mobility fee replaces it.
- Fire & Rescue Impact Fee (Seminole County, Commercial)$0.00The Seminole County fire & rescue impact fee applies only in unincorporated Seminole County; within this municipality it is not charged (the city levies its own fire impact fee).
Where in Seminole County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oviedo: Industrial Impact Fees
Industrial development in Oviedo pays $2.18 per square foot in impact fees, plus $8,767.25 in one-time water and sewer connection fees (rates sourced October 9, 2026).
For a 50,000 sq ft building, that comes to about $117,717.25. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter ($5,302.25 one-time), Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64) ($2,325.00 one-time) and Sewer Capital Recovery Charge (City of Oviedo) — City/County Area, per ERU (300 GPD × $3.80) ($1,140.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Oviedo Impact Fee Schedule
- Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64)$2,325.00 one-timeCity of Oviedo water capital recovery charge, $2,325 per ERU (1 ERU = 350 gpd); nonresidential amount is by estimated flow. Meter fee billed separately.
- Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter$5,302.25 one-timeSeminole County wastewater capacity fee, charged in Oviedo's City/County sewer service area in addition to the city's sewer capital recovery charge: $3,175 per ERC times the meter's equivalent factor (3/4" = 1, 1" = 1.67, up to 12" = 143.33). Not charged in the Alafaya service area.
- Sewer Capital Recovery Charge (City of Oviedo) — City/County Area, per ERU (300 GPD × $3.80)$1,140.00 one-timeHighest of Oviedo's two sewer service areas once the county charge is counted. In the City/County area the city charges $3.80 per gallon per day of estimated flow (minimum 300 GPD, $1,140), and the Seminole County wastewater capacity fee, priced by meter size, is charged in addition (separate line). The Alafaya service area pays a single city charge of $8.01 per gallon per day instead.
- Mobility Fee (City of Oviedo, Industrial)$1.85/sq ftCity of Oviedo mobility fee, per 1,000 sq ft; replaces the Seminole County mobility fee.
- Administrative Facilities Impact Fee (City of Oviedo, Industrial)$0.14/sq ftCity of Oviedo administrative facilities impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Fire Rescue Impact Fee (City of Oviedo, Industrial)$0.10/sq ftCity of Oviedo fire rescue impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Law Enforcement Impact Fee (City of Oviedo, Industrial)$0.09/sq ftCity of Oviedo law enforcement impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Recreation & Parks Impact Fee (City of Oviedo, Industrial)$0.00City of OviedoThe City of Oviedo parks and recreation impact fee applies to residential development only; nonresidential buildings pay none.
- Fire & Rescue Impact Fee (Seminole County, Industrial)$0.00The Seminole County fire & rescue impact fee applies only in unincorporated Seminole County; within this municipality it is not charged (the city levies its own fire impact fee).
- Road (Mobility) Impact Fee (Seminole County, Industrial)$0.00The Seminole County mobility (transportation) impact fee is not collected within this municipality; Oviedo's mobility fee replaces it.
Where in Seminole County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oviedo: Office Impact Fees
Office development in Oviedo pays $5.33 per square foot in impact fees, plus $8,767.25 in one-time water and sewer connection fees (rates sourced October 9, 2026).
For a 25,000 sq ft building, that comes to about $142,067.25. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter ($5,302.25 one-time), Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64) ($2,325.00 one-time) and Sewer Capital Recovery Charge (City of Oviedo) — City/County Area, per ERU (300 GPD × $3.80) ($1,140.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Oviedo Impact Fee Schedule
- Water Capital Recovery Charge (City of Oviedo) — per ERU (350 GPD × $6.64)$2,325.00 one-timeCity of Oviedo water capital recovery charge, $2,325 per ERU (1 ERU = 350 gpd); nonresidential amount is by estimated flow. Meter fee billed separately.
- Wastewater Capacity Fee (Seminole County Environmental Services, via Oviedo) — 1" meter$5,302.25 one-timeSeminole County wastewater capacity fee, charged in Oviedo's City/County sewer service area in addition to the city's sewer capital recovery charge: $3,175 per ERC times the meter's equivalent factor (3/4" = 1, 1" = 1.67, up to 12" = 143.33). Not charged in the Alafaya service area.
- Sewer Capital Recovery Charge (City of Oviedo) — City/County Area, per ERU (300 GPD × $3.80)$1,140.00 one-timeHighest of Oviedo's two sewer service areas once the county charge is counted. In the City/County area the city charges $3.80 per gallon per day of estimated flow (minimum 300 GPD, $1,140), and the Seminole County wastewater capacity fee, priced by meter size, is charged in addition (separate line). The Alafaya service area pays a single city charge of $8.01 per gallon per day instead.
- Mobility Fee (City of Oviedo, Office)$4.35/sq ftCity of Oviedo mobility fee, per 1,000 sq ft; replaces the Seminole County mobility fee.
- Administrative Facilities Impact Fee (City of Oviedo, Office)$0.42/sq ftCity of Oviedo administrative facilities impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Fire Rescue Impact Fee (City of Oviedo, Office)$0.30/sq ftCity of Oviedo fire rescue impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Law Enforcement Impact Fee (City of Oviedo, Office)$0.27/sq ftCity of Oviedo law enforcement impact fee, per 1,000 sq ft; current rate effective 3/3/2026 (Ord. 1761), phasing up annually 1/1/2027 through 1/1/2029.
- Recreation & Parks Impact Fee (City of Oviedo, Office)$0.00City of OviedoThe City of Oviedo parks and recreation impact fee applies to residential development only; nonresidential buildings pay none.
- Fire & Rescue Impact Fee (Seminole County, Office)$0.00The Seminole County fire & rescue impact fee applies only in unincorporated Seminole County; within this municipality it is not charged (the city levies its own fire impact fee).
- Road (Mobility) Impact Fee (Seminole County, Office)$0.00The Seminole County mobility (transportation) impact fee is not collected within this municipality; Oviedo's mobility fee replaces it.
Where in Seminole County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Oviedo Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Oviedo Impact Fee FAQs
What are the total impact fees for a single-family home in Oviedo, Florida?
A new single-family home in Oviedo pays $26,620.00 per unit in combined impact fees (rates sourced October 9, 2026).
How much are commercial impact fees in Oviedo?
Commercial development in Oviedo pays $7.55 per square foot in impact fees, plus $8,767.25 in one-time water and sewer connection fees (assuming a 1-inch meter), about $386,217.25 for a 50,000 sq ft building.
Does Oviedo charge its own impact fees?
Yes. Oviedo levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Oviedo, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.