Casselberry applies its own fee schedule: municipal fees plus the Seminole County-levied fees that apply inside city limits. Combined, a new single-family home pays $17,224.33 per unit (rates sourced July 18, 2026). The full breakdown is below.

Casselberry impact fees by project type

Casselberry: Single-Family Impact Fees

A new single-family home in Casselberry pays $17,224.33 per unit in impact fees (rates sourced July 18, 2026). Of that, Seminole County-levied fees account for $12,109.00 and municipal or utility fees for $5,115.33.

The largest line items are Educational (School) Impact Fee (Seminole County Public Schools) ($9,000.00), Road (Mobility) Impact Fee (Seminole County) ($2,714.00) and Sewer System Development Charge (City of Casselberry) ($2,240.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$656.00
  • Water System Development Charge (City of Casselberry)
    City of Casselberry
    CONFIRMED. Code §86-186, adopted by Ord. 26-1628 §III (Att. B), 2/9/2026 — rates EFFECTIVE 4/1/2026. Water SDC $656.00 per single-family unit (250 gpd @ $2.62/gal; 1 ERU = 250 gpd). Water tapping fee (⅝"×¾") $640.00 charged separately.
    $656.00
Sewer$2,240.00
  • Sewer System Development Charge (City of Casselberry)
    City of Casselberry
    CONFIRMED. Code §86-68, adopted by Ord. 26-1628 §III (Att. B), 2/9/2026 — rates EFFECTIVE 4/1/2026. Sewer SDC $2,240.00 per single-family unit (200 gpd @ $11.20/gal; 1 ERU = 200 gpd). Sewer tapping fee (4" lateral) $2,910.00 charged separately.
    $2,240.00
City$2,219.33
County$12,109.00
  • Educational (School) Impact Fee (Seminole County Public Schools)
    Seminole County Public Schools
    Educational System Impact Fee, LDC Ch.105 (Ord 2018-1). SF $9,000 flat. Countywide incl. Casselberry.
    $9,000.00
  • Road (Mobility) Impact Fee (Seminole County)
    Seminole County
    CONFIRMED COLLECTED IN CASSELBERRY. Seminole Co. Ord. 2021-26 applies the mobility fee countywide including all municipalities EXCEPT Altamonte Springs; Casselberry Code §53-5.B expressly says the city multi-modal fee is paid 'in addition to any transportation impact fees imposed by the County.' 2020 Condensed Mobility Fee Schedule eff. 6/29/2021: SF 1,500-2,499 sf = Suburban $2,714 (shown) / Core $1,811 / Rural $7,312. Amount = Suburban (representative); district varies by parcel.
    $2,714.00
  • Library Impact Fee (Seminole County)
    Seminole County
    Library System Impact Fee (Ord 2021-28), SF 1,500-2,499 sf tier. Countywide incl. Casselberry.
    $395.00
Total (Casselberry): $17,224.33
Sources last checked July 18, 2026Official fee schedules:City of Casselberry Seminole County Public Schools Seminole County

Where in Seminole County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Casselberry: Multifamily Impact Fees

A new multifamily unit in Casselberry pays $12,197.74 per unit in impact fees (rates sourced July 18, 2026). Of that, Seminole County-levied fees account for $8,606.00 and municipal or utility fees for $3,591.74.

The largest line items are Educational (School) Impact Fee (Seminole County Public Schools, MF) ($7,100.00), Sewer System Development Charge (City of Casselberry, MF) ($1,680.00) and Road (Mobility) Impact Fee (Seminole County, MF) ($1,237.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$493.00
Sewer$1,680.00
City$1,418.74
County$8,606.00
  • Educational (School) Impact Fee (Seminole County Public Schools, MF)
    Seminole County Public Schools
    Educational Impact Fee (Ch.105). Apartment 851-1,000sf $7,100 (default). Countywide incl. Casselberry.
    $7,100.00
  • Road (Mobility) Impact Fee (Seminole County, MF)
    Seminole County
    CONFIRMED COLLECTED IN CASSELBERRY. Casselberry Code §53-5.B: the city multi-modal fee is paid 'in addition to any transportation impact fees imposed by the County'; Seminole Co. Ord. 2021-26 applies countywide except Altamonte Springs. 2020 Condensed Mobility Fee Schedule eff. 6/29/2021: MF 3+ Floor (default per the 4-story canonical unit) Suburban $1,237 / Core $779. MF 1-2 Floor: Suburban $1,665 / Core $1,048. Amount = Suburban (representative).
    $1,237.00
  • Library Impact Fee (Seminole County, MF)
    Seminole County
    Library Impact Fee MF 'All Other' $269. Countywide incl. Casselberry.
    $269.00
Total (Casselberry): $12,197.74
Sources last checked July 18, 2026Official fee schedules:City of Casselberry Seminole County Public Schools Seminole County

Where in Seminole County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Casselberry: Commercial Impact Fees

Commercial development in Casselberry pays $6.12 per square foot in impact fees, plus $2,896.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $309,081.50. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Development Charge (City of Casselberry) — per ERU (200 gpd × $11.20/gal) ($2,240.00 one-time), Water System Development Charge (City of Casselberry) — per ERU (250 gpd × $2.62/gal) ($656.00 one-time) and Multi-Modal Transportation Impact Fee (City of Casselberry, Commercial) ($1.26/sq ft).

Road (Mobility) Impact Fee (Seminole County, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$656.00 one-time
Sewer$2,240.00 one-time
City$2.30/sq ft
County$3.82/sq ft
  • Road (Mobility) Impact Fee (Seminole County, Commercial)
    Seminole Co. 2020 Condensed Mobility Fee Schedule (Ord. 2021-26, eff. 6/29/2021), collected in Casselberry IN ADDITION to the city multi-modal fee. Schedule row: Retail (large ≥20 ksf, Shop Ctr.). Amount = SUBURB district; district is parcel-specific (Rural $7,369 / Core $2,523) — UNCONFIRMED pending parcel district. County Library residential-only; School residential-only.
    $3.82/sq ftRequires confirmation
  • Fire & Rescue Impact Fee (Seminole County, Commercial)
    $0 confirmed — county Fire & Rescue impact fee (Ord. 2021-27) is unincorporated-only; Casselberry levies its own municipal fire fee.
    $0.00
Total (Casselberry): $6.12/sq ft + $2,896.00 one-time (≈ $309,081.50 at 50,000 sq ft)
Sources last checked July 18, 2026
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Seminole County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Casselberry: Industrial Impact Fees

Industrial development in Casselberry pays $1.87 per square foot in impact fees, plus $2,896.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $96,624.50. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Development Charge (City of Casselberry) — per ERU (200 gpd × $11.20/gal) ($2,240.00 one-time), Water System Development Charge (City of Casselberry) — per ERU (250 gpd × $2.62/gal) ($656.00 one-time) and Multi-Modal Transportation Impact Fee (City of Casselberry, Industrial) ($0.51/sq ft).

Road (Mobility) Impact Fee (Seminole County, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$656.00 one-time
Sewer$2,240.00 one-time
City$0.85/sq ft
County$1.02/sq ft
Total (Casselberry): $1.87/sq ft + $2,896.00 one-time (≈ $96,624.50 at 50,000 sq ft)
Sources last checked July 18, 2026
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Seminole County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Casselberry: Office Impact Fees

Office development in Casselberry pays $3.40 per square foot in impact fees, plus $2,896.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 25,000 sq ft building, that comes to about $87,813.25. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Development Charge (City of Casselberry) — per ERU (200 gpd × $11.20/gal) ($2,240.00 one-time), Water System Development Charge (City of Casselberry) — per ERU (250 gpd × $2.62/gal) ($656.00 one-time) and Multi-Modal Transportation Impact Fee (City of Casselberry, Office) ($0.96/sq ft).

Road (Mobility) Impact Fee (Seminole County, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$656.00 one-time
Sewer$2,240.00 one-time
City$1.56/sq ft
County$1.84/sq ft
Total (Casselberry): $3.40/sq ft + $2,896.00 one-time (≈ $87,813.25 at 25,000 sq ft)
Sources last checked July 18, 2026
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Seminole County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Casselberry

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Casselberry, Florida?

A new single-family home in Casselberry pays $17,224.33 per unit in combined impact fees (rates sourced July 18, 2026).

How much are commercial impact fees in Casselberry?

Commercial development in Casselberry pays $6.12 per square foot in impact fees, plus $2,896.00 in one-time water and sewer connection fees, about $309,081.50 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Casselberry charge its own impact fees?

Yes. Casselberry levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Casselberry, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Seminole County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000