Lake Mary, Florida Impact Fees

Lake Mary applies its own fee schedule: municipal fees plus the Seminole County-levied fees that apply inside city limits. Combined, a new single-family home pays $14,255.00 per unit (rates sourced July 18, 2026). The full breakdown is below.

Lake Mary impact fees by project type

Lake Mary: Single-Family Impact Fees

A new single-family home in Lake Mary pays $14,255.00 per unit in impact fees (rates sourced July 18, 2026). Of that, Seminole County-levied fees account for $12,109.00 and municipal or utility fees for $2,146.00.

The largest line items are Educational (School) Impact Fee (Seminole County Public Schools) ($9,000.00), Road (Mobility) Impact Fee (Seminole County) ($2,714.00) and Water System Impact Fee (City of Lake Mary) ($1,010.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,010.00
  • Water System Impact Fee (City of Lake Mary)
    City of Lake Mary
    CONFIRMED. Code §§51.65/51.66 (Ord. 1518, 11/6/2014). $1,010.00 per ERU; ERU = 350 GPD; SFR = 350 GPD = 1.0 ERU. (MF 1-2 BR = 300 GPD = 0.857 ERU.) Lake Mary is on American Legal, not Municode.
    $1,010.00
Sewer$435.00
  • Sewer Impact Fee (City of Lake Mary) — city portion, 300 GPD × $1.45/GPD
    City of Lake Mary
    CONFIRMED. Code §§50.142/50.143 (Ord. 1537, 2/18/2016). City sewer impact fee = $1.45 per GPD × 300 GPD (SFR) = $435.00. IN ADDITION, the Seminole County wastewater capacity fee ($3,175/SF DU) is charged on Lake Mary connections — total SFR sewer = $3,610. See the city's Residential Impact Fees page.
    $435.00
City$701.00
County$12,109.00
  • Educational (School) Impact Fee (Seminole County Public Schools)
    Seminole County Public Schools
    Educational System Impact Fee, LDC Ch.105 (Ord 2018-1). SF $9,000 flat. Countywide incl. Lake Mary.
    $9,000.00
  • Road (Mobility) Impact Fee (Seminole County)
    Seminole County
    CONFIRMED COLLECTED IN LAKE MARY — paid directly to Seminole County; the city requires a county impact-fee statement (library, schools, mobility) before issuing a building permit. Lake Mary levies NO city transportation fee. Seminole Co. Ord. 2021-26 (countywide except Altamonte Springs). SF 1,500-2,499 sf = Suburban $2,714 / Core $1,811 / Rural $7,312; amount = Suburban (representative).
    $2,714.00
  • Library Impact Fee (Seminole County)
    Seminole County
    Library System Impact Fee (Ord 2021-28), SF 1,500-2,499 sf tier. Countywide incl. Lake Mary.
    $395.00
Total (Lake Mary): $14,255.00
Sources last checked July 18, 2026Official fee schedules:City of Lake Mary Seminole County Public Schools Seminole County

Where in Seminole County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lake Mary: Multifamily Impact Fees

A new multifamily unit in Lake Mary pays $10,535.21 per unit in impact fees (rates sourced July 18, 2026). Of that, Seminole County-levied fees account for $8,606.00 and municipal or utility fees for $1,929.21.

The largest line items are Educational (School) Impact Fee (Seminole County Public Schools, MF) ($7,100.00), Road (Mobility) Impact Fee (Seminole County, MF) ($1,237.00) and Water System Impact Fee (City of Lake Mary, MF) — 0.857 ERU (300 GPD) ($865.71).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$865.71
  • Water System Impact Fee (City of Lake Mary, MF) — 0.857 ERU (300 GPD)
    City of Lake Mary
    Code §§51.65/51.66 (Ord. 1518, 11/6/2014): $1,010.00 per ERU, ERU = 350 GPD. MF 1-2 BR = 300 GPD = 0.857 ERU → $865.71 (canonical 2BR unit). MF 3+ BR = 350 GPD = full $1,010. Per-unit dollar figure is derived from the code's adopted rate × the code's adopted GPD factor — the city publishes only the SFR row.
    $865.71
Sewer$362.50
City$701.00
County$8,606.00
  • Educational (School) Impact Fee (Seminole County Public Schools, MF)
    Seminole County Public Schools
    Educational Impact Fee (Ch.105). Apartment 851-1,000sf $7,100 (default). Countywide incl. Lake Mary.
    $7,100.00
  • Road (Mobility) Impact Fee (Seminole County, MF)
    Seminole County
    CONFIRMED COLLECTED IN LAKE MARY — paid directly to Seminole County; the city requires a county impact-fee statement (library, schools, mobility) before permit issuance and levies no city transportation fee. 2020 Condensed Mobility Fee Schedule eff. 6/29/2021: MF 3+ Floor Suburban $1,237 / Core $779; MF 1-2 Floor Suburban $1,665. Amount = Suburban 3+ Floor (canonical 4-story unit).
    $1,237.00
  • Library Impact Fee (Seminole County, MF)
    Seminole County
    Library Impact Fee MF 'All Other' $269. Countywide incl. Lake Mary.
    $269.00
Total (Lake Mary): $10,535.21
Sources last checked July 18, 2026Official fee schedules:City of Lake Mary Seminole County Public Schools Seminole County

Where in Seminole County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lake Mary: Commercial Impact Fees

Commercial development in Lake Mary pays $4.08 per square foot in impact fees, plus $6,747.25 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $210,647.25. The calculator below adjusts to your exact square footage.

The largest line items are Water System Impact Fee (City of Lake Mary) — per ERU (350 GPD) ($1,010.00 one-time), Sewer Impact Fee (City of Lake Mary) — city portion, per GPD × $1.45 ($435.00 one-time) and Fire Impact Fee (City of Lake Mary, Commercial) ($0.13/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Road (Mobility) Impact Fee (Seminole County, Commercial) and Wastewater Capacity Fee (Seminole County Environmental Services, via Lake Mary) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full fee schedule
Water$1,010.00 one-time
Sewer$5,737.25 one-time
  • Wastewater Capacity Fee (Seminole County Environmental Services, via Lake Mary) — 1" meter
    Seminole County wastewater capacity fee (Res. 2021-R-99, Code Sec. 20.45) STACKS on the Lake Mary city sewer impact fee per the city's Residential Impact Fees page. Nonres = $3,175/ERC × AWWA meter factor; 1" meter = 1.67 ERC = $5,302.25 (default). Other meters: ¾"(1.0)=$3,175; 1.5"(3.33)=$10,573; 2"(5.33)=$16,923. UNCONFIRMED: exact county-fee applicability to each Lake Mary nonres connection — verify w/ city 407-585-1449.
    $5,302.25 one-timeRequires confirmation
  • Sewer Impact Fee (City of Lake Mary) — city portion, per GPD × $1.45
    Code §§50.142/50.143 (Ord. 1537, 2/18/2016). City sewer impact fee = $1.45 per GPD. Amount shown = 1-ERU basis (300 GPD SFR = $435); NONRES = estimated gpd × $1.45. NOTE: the Seminole County wastewater capacity fee (separate record) STACKS on this per the city's Residential Impact Fees page.
    $435.00 one-time
City$0.26/sq ft
County$3.82/sq ft
  • Road (Mobility) Impact Fee (Seminole County, Commercial)
    Seminole Co. mobility fee (Ord. 2021-26) collected in Lake Mary (paid directly to county; Lake Mary levies no city transportation fee). Schedule row: Retail (large ≥20 ksf, Shop Ctr.). SUBURB district (Rural $7,369 / Core $2,523) — UNCONFIRMED pending parcel district. County Library residential-only; School residential-only.
    $3.82/sq ftRequires confirmation
  • Fire & Rescue Impact Fee (Seminole County, Commercial)
    $0 confirmed — county Fire & Rescue impact fee is unincorporated-only; Lake Mary levies its own municipal fire fee.
    $0.00
Total (Lake Mary): $4.08/sq ft + $6,747.25 one-time (≈ $210,647.25 at 50,000 sq ft)
Sources last checked July 18, 2026
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Seminole County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lake Mary: Industrial Impact Fees

Industrial development in Lake Mary pays $1.28 per square foot in impact fees, plus $6,747.25 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $70,897.25. The calculator below adjusts to your exact square footage.

The largest line items are Water System Impact Fee (City of Lake Mary) — per ERU (350 GPD) ($1,010.00 one-time), Sewer Impact Fee (City of Lake Mary) — city portion, per GPD × $1.45 ($435.00 one-time) and Fire Impact Fee (City of Lake Mary, Industrial) ($0.13/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Road (Mobility) Impact Fee (Seminole County, Industrial) and Wastewater Capacity Fee (Seminole County Environmental Services, via Lake Mary) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full fee schedule
Water$1,010.00 one-time
Sewer$5,737.25 one-time
  • Wastewater Capacity Fee (Seminole County Environmental Services, via Lake Mary) — 1" meter
    Seminole County wastewater capacity fee (Res. 2021-R-99, Code Sec. 20.45) STACKS on the Lake Mary city sewer impact fee per the city's Residential Impact Fees page. Nonres = $3,175/ERC × AWWA meter factor; 1" meter = 1.67 ERC = $5,302.25 (default). Other meters: ¾"(1.0)=$3,175; 1.5"(3.33)=$10,573; 2"(5.33)=$16,923. UNCONFIRMED: exact county-fee applicability to each Lake Mary nonres connection — verify w/ city 407-585-1449.
    $5,302.25 one-timeRequires confirmation
  • Sewer Impact Fee (City of Lake Mary) — city portion, per GPD × $1.45
    Code §§50.142/50.143 (Ord. 1537, 2/18/2016). City sewer impact fee = $1.45 per GPD. Amount shown = 1-ERU basis (300 GPD SFR = $435); NONRES = estimated gpd × $1.45. NOTE: the Seminole County wastewater capacity fee (separate record) STACKS on this per the city's Residential Impact Fees page.
    $435.00 one-time
City$0.26/sq ft
County$1.02/sq ft
Total (Lake Mary): $1.28/sq ft + $6,747.25 one-time (≈ $70,897.25 at 50,000 sq ft)
Sources last checked July 18, 2026
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Seminole County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lake Mary: Office Impact Fees

Office development in Lake Mary pays $2.10 per square foot in impact fees, plus $6,747.25 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 25,000 sq ft building, that comes to about $59,222.25. The calculator below adjusts to your exact square footage.

The largest line items are Water System Impact Fee (City of Lake Mary) — per ERU (350 GPD) ($1,010.00 one-time), Sewer Impact Fee (City of Lake Mary) — city portion, per GPD × $1.45 ($435.00 one-time) and Fire Impact Fee (City of Lake Mary, Office) ($0.13/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Road (Mobility) Impact Fee (Seminole County, Office) and Wastewater Capacity Fee (Seminole County Environmental Services, via Lake Mary) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full fee schedule
Water$1,010.00 one-time
Sewer$5,737.25 one-time
  • Wastewater Capacity Fee (Seminole County Environmental Services, via Lake Mary) — 1" meter
    Seminole County wastewater capacity fee (Res. 2021-R-99, Code Sec. 20.45) STACKS on the Lake Mary city sewer impact fee per the city's Residential Impact Fees page. Nonres = $3,175/ERC × AWWA meter factor; 1" meter = 1.67 ERC = $5,302.25 (default). Other meters: ¾"(1.0)=$3,175; 1.5"(3.33)=$10,573; 2"(5.33)=$16,923. UNCONFIRMED: exact county-fee applicability to each Lake Mary nonres connection — verify w/ city 407-585-1449.
    $5,302.25 one-timeRequires confirmation
  • Sewer Impact Fee (City of Lake Mary) — city portion, per GPD × $1.45
    Code §§50.142/50.143 (Ord. 1537, 2/18/2016). City sewer impact fee = $1.45 per GPD. Amount shown = 1-ERU basis (300 GPD SFR = $435); NONRES = estimated gpd × $1.45. NOTE: the Seminole County wastewater capacity fee (separate record) STACKS on this per the city's Residential Impact Fees page.
    $435.00 one-time
City$0.26/sq ft
County$1.84/sq ft
Total (Lake Mary): $2.10/sq ft + $6,747.25 one-time (≈ $59,222.25 at 25,000 sq ft)
Sources last checked July 18, 2026
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Seminole County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Lake Mary

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Lake Mary, Florida?

A new single-family home in Lake Mary pays $14,255.00 per unit in combined impact fees (rates sourced July 18, 2026).

How much are commercial impact fees in Lake Mary?

Commercial development in Lake Mary pays $4.08 per square foot in impact fees, plus $6,747.25 in one-time water and sewer connection fees (assuming a 1-inch meter), about $210,647.25 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Lake Mary charge its own impact fees?

Yes. Lake Mary levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Lake Mary, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Seminole County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000