Atlantic Beach Impact Fees by Project Type
Atlantic Beach: Single-Family Impact Fees
A new single-family home in Atlantic Beach pays $9,824.00 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Capital Recovery Fee (City of North Myrtle Beach) ($4,493.00), Sewer Capital Recovery Fee (City of North Myrtle Beach) ($3,771.00) and Water Tap Fee (City of North Myrtle Beach) — 3/4" meter ($960.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Atlantic Beach Impact Fee Schedule
- Water Capital Recovery Fee (City of North Myrtle Beach)$4,493.00City of North Myrtle BeachWater service in Atlantic Beach is provided by the City of North Myrtle Beach. Water capital recovery fee: $4,493 per equivalent residential unit, and a single-family home is 1 unit, effective July 1, 2026 through June 30, 2027. Paid at building permit, separate from the tap fee.
- Water Tap Fee (City of North Myrtle Beach) — 3/4" meter$960.00City of North Myrtle BeachWater service in Atlantic Beach is provided by the City of North Myrtle Beach at its in-city rates. North Myrtle Beach water tap fee for a 3/4 inch meter: $960, effective July 1, 2026, plus a refundable deposit.
- Sewer Capital Recovery Fee (City of North Myrtle Beach)$3,771.00City of North Myrtle BeachSewer service in Atlantic Beach is provided by the City of North Myrtle Beach. Wastewater capital recovery fee: $3,771 per equivalent residential unit, and a single-family home is 1 unit, effective July 1, 2026 through June 30, 2027. Separate from the sewer tap fee.
- Sewer Tap Fee (City of North Myrtle Beach) — 4" lateral (single-family minimum)$600.00City of North Myrtle BeachNorth Myrtle Beach sewer tap fee for a 4 inch lateral: $600, effective July 1, 2026; four inches is the single-family minimum.
- City Development Impact Fees (Town of Atlantic Beach)$0.00Town of Atlantic Beach
- County Development Impact Fee (Horry County)$0.00Horry CountyHorry County's development impact fee applies only in unincorporated Horry County, so it is not charged inside town limits.
Where in Horry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Atlantic Beach: Multifamily Impact Fees
A new multifamily unit in Atlantic Beach pays $10,064.00 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Capital Recovery Fee (City of North Myrtle Beach, MF) — 1.0 ERU per unit × $4,493/ERU ($4,493.00), Sewer Capital Recovery Fee (City of North Myrtle Beach, MF) — 1.0 ERU per unit × $3,771/ERU ($3,771.00) and Water Tap Fee (City of North Myrtle Beach, MF) — 3/4" meter ($960.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Atlantic Beach Impact Fee Schedule
- Water Capital Recovery Fee (City of North Myrtle Beach, MF) — 1.0 ERU per unit × $4,493/ERU$4,493.00City of North Myrtle BeachWater service in Atlantic Beach is provided by the City of North Myrtle Beach, which charges apartments, condos and patio homes 1 equivalent residential unit each: $4,493 per unit for water, effective July 1, 2026 through June 30, 2027.
- Water Tap Fee (City of North Myrtle Beach, MF) — 3/4" meter$960.00City of North Myrtle BeachWater service in Atlantic Beach is provided by the City of North Myrtle Beach at its in-city rates. North Myrtle Beach water tap fee for a 3/4 inch meter: $960, effective July 1, 2026, plus a refundable deposit. A building on one meter pays once.
- Sewer Capital Recovery Fee (City of North Myrtle Beach, MF) — 1.0 ERU per unit × $3,771/ERU$3,771.00City of North Myrtle BeachSewer service in Atlantic Beach is provided by the City of North Myrtle Beach, which charges apartments, condos and patio homes 1 equivalent residential unit each: $3,771 per unit for wastewater, effective July 1, 2026 through June 30, 2027.
- Sewer Tap Fee (City of North Myrtle Beach, MF)$840.006" lateral (multifamily over 2 units minimum)City of North Myrtle BeachSewer service in Atlantic Beach is provided by the City of North Myrtle Beach. North Myrtle Beach sets sewer tap fees by lateral size, not per unit; a multifamily building of more than two units needs at least a 6-inch lateral: $840, effective July 1, 2026, larger at cost. A building on one lateral pays the tap once.
- City Development Impact Fees (Town of Atlantic Beach, MF)$0.00Town of Atlantic Beach
- County Development Impact Fee (Horry County, MF)$0.00Horry CountyHorry County's development impact fee applies only in unincorporated Horry County, so it is not charged inside town limits.
Where in Horry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Atlantic Beach: Commercial Impact Fees
Commercial development in Atlantic Beach pays no per-square-foot impact fees, but owes $9,924.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to about $9,924.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Tap Fee (City of North Myrtle Beach) — 4" lateral, Water Tap Fee (City of North Myrtle Beach) — 1" meter, Water Capital Recovery Fee (City of North Myrtle Beach), and Sewer Capital Recovery Fee (City of North Myrtle Beach) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Atlantic Beach Impact Fee Schedule
- Water Capital Recovery Fee (City of North Myrtle Beach)$4,493.00 one-timeRequires confirmationCity of North Myrtle BeachNorth Myrtle Beach water capital recovery fee: $4,493 per equivalent residential unit (ERU), effective July 1, 2026. The city assigns ERUs by use (for example 0.5 ERU per 1,000 sq ft of shopping center, 0.0625 ERU per office occupant). Shown: 1 ERU.
- Water Tap Fee (City of North Myrtle Beach) — 1" meter$1,060.00 one-timeRequires confirmationCity of North Myrtle BeachWater and sewer in Atlantic Beach are provided by the City of North Myrtle Beach. NMB water tap fee for a 1-inch meter, effective July 1, 2026; set by meter size and separate from the water capital recovery fee.
- Water Tap Fee (City of North Myrtle Beach) — 6" and larger meter$0.00City of North Myrtle BeachNorth Myrtle Beach charges water taps of 6 inches and larger at the cost of labor and materials plus 50%.
- Sewer Capital Recovery Fee (City of North Myrtle Beach)$3,771.00 one-timeRequires confirmationCity of North Myrtle BeachNorth Myrtle Beach sewer capital recovery fee: $3,771 per equivalent residential unit (ERU), effective July 1, 2026. The city assigns ERUs by use (for example 0.5 ERU per 1,000 sq ft of shopping center). Shown: 1 ERU.
- Sewer Tap Fee (City of North Myrtle Beach) — 4" lateral$600.00 one-timeRequires confirmationCity of North Myrtle BeachNorth Myrtle Beach sewer tap fee for a 4-inch lateral, effective July 1, 2026.
- Sewer Tap Fee (City of North Myrtle Beach) — over 6" lateral$0.00City of North Myrtle BeachNorth Myrtle Beach charges sewer laterals larger than 6 inches at cost.
- City Impact Fee (Town of Atlantic Beach, Commercial)$0.00Town of Atlantic BeachThe Town of Atlantic Beach does not levy a municipal impact fee on nonresidential development. Water and sewer are provided by the City of North Myrtle Beach (see the Water/Sewer records).
- County Impact Fee (Horry County, Commercial)$0.00Horry CountyHorry County development impact fees (Ord. 30-2026) are assessed only on development in unincorporated Horry County; they are not levied within the Town of Atlantic Beach.
Where in Horry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Atlantic Beach: Industrial Impact Fees
Industrial development in Atlantic Beach pays no per-square-foot impact fees, but owes $9,924.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to about $9,924.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Tap Fee (City of North Myrtle Beach) — 4" lateral, Water Tap Fee (City of North Myrtle Beach) — 1" meter, Water Capital Recovery Fee (City of North Myrtle Beach), and Sewer Capital Recovery Fee (City of North Myrtle Beach) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Atlantic Beach Impact Fee Schedule
- Water Capital Recovery Fee (City of North Myrtle Beach)$4,493.00 one-timeRequires confirmationCity of North Myrtle BeachNorth Myrtle Beach water capital recovery fee: $4,493 per equivalent residential unit (ERU), effective July 1, 2026. The city assigns ERUs by use (for example 0.5 ERU per 1,000 sq ft of shopping center, 0.0625 ERU per office occupant). Shown: 1 ERU.
- Water Tap Fee (City of North Myrtle Beach) — 1" meter$1,060.00 one-timeRequires confirmationCity of North Myrtle BeachWater and sewer in Atlantic Beach are provided by the City of North Myrtle Beach. NMB water tap fee for a 1-inch meter, effective July 1, 2026; set by meter size and separate from the water capital recovery fee.
- Water Tap Fee (City of North Myrtle Beach) — 6" and larger meter$0.00City of North Myrtle BeachNorth Myrtle Beach charges water taps of 6 inches and larger at the cost of labor and materials plus 50%.
- Sewer Capital Recovery Fee (City of North Myrtle Beach)$3,771.00 one-timeRequires confirmationCity of North Myrtle BeachNorth Myrtle Beach sewer capital recovery fee: $3,771 per equivalent residential unit (ERU), effective July 1, 2026. The city assigns ERUs by use (for example 0.5 ERU per 1,000 sq ft of shopping center). Shown: 1 ERU.
- Sewer Tap Fee (City of North Myrtle Beach) — 4" lateral$600.00 one-timeRequires confirmationCity of North Myrtle BeachNorth Myrtle Beach sewer tap fee for a 4-inch lateral, effective July 1, 2026.
- Sewer Tap Fee (City of North Myrtle Beach) — over 6" lateral$0.00City of North Myrtle BeachNorth Myrtle Beach charges sewer laterals larger than 6 inches at cost.
- City Impact Fee (Town of Atlantic Beach, Industrial)$0.00Town of Atlantic BeachThe Town of Atlantic Beach does not levy a municipal impact fee on nonresidential development. Water and sewer are provided by the City of North Myrtle Beach (see the Water/Sewer records).
- County Impact Fee (Horry County, Industrial)$0.00Horry CountyHorry County development impact fees are assessed only in unincorporated Horry County; not levied within the Town of Atlantic Beach.
Where in Horry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Atlantic Beach: Office Impact Fees
Office development in Atlantic Beach pays no per-square-foot impact fees, but owes $9,924.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 25,000 sq ft building, that comes to about $9,924.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Tap Fee (City of North Myrtle Beach) — 4" lateral, Water Tap Fee (City of North Myrtle Beach) — 1" meter, Water Capital Recovery Fee (City of North Myrtle Beach), and Sewer Capital Recovery Fee (City of North Myrtle Beach) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Atlantic Beach Impact Fee Schedule
- Water Capital Recovery Fee (City of North Myrtle Beach)$4,493.00 one-timeRequires confirmationCity of North Myrtle BeachNorth Myrtle Beach water capital recovery fee: $4,493 per equivalent residential unit (ERU), effective July 1, 2026. The city assigns ERUs by use (for example 0.5 ERU per 1,000 sq ft of shopping center, 0.0625 ERU per office occupant). Shown: 1 ERU.
- Water Tap Fee (City of North Myrtle Beach) — 1" meter$1,060.00 one-timeRequires confirmationCity of North Myrtle BeachWater and sewer in Atlantic Beach are provided by the City of North Myrtle Beach. NMB water tap fee for a 1-inch meter, effective July 1, 2026; set by meter size and separate from the water capital recovery fee.
- Water Tap Fee (City of North Myrtle Beach) — 6" and larger meter$0.00City of North Myrtle BeachNorth Myrtle Beach charges water taps of 6 inches and larger at the cost of labor and materials plus 50%.
- Sewer Capital Recovery Fee (City of North Myrtle Beach)$3,771.00 one-timeRequires confirmationCity of North Myrtle BeachNorth Myrtle Beach sewer capital recovery fee: $3,771 per equivalent residential unit (ERU), effective July 1, 2026. The city assigns ERUs by use (for example 0.5 ERU per 1,000 sq ft of shopping center). Shown: 1 ERU.
- Sewer Tap Fee (City of North Myrtle Beach) — 4" lateral$600.00 one-timeRequires confirmationCity of North Myrtle BeachNorth Myrtle Beach sewer tap fee for a 4-inch lateral, effective July 1, 2026.
- Sewer Tap Fee (City of North Myrtle Beach) — over 6" lateral$0.00City of North Myrtle BeachNorth Myrtle Beach charges sewer laterals larger than 6 inches at cost.
- City Impact Fee (Town of Atlantic Beach, Office)$0.00Town of Atlantic BeachThe Town of Atlantic Beach does not levy a municipal impact fee on nonresidential development. Water and sewer are provided by the City of North Myrtle Beach (see the Water/Sewer records).
- County Impact Fee (Horry County, Office)$0.00Horry CountyHorry County development impact fees are assessed only in unincorporated Horry County; not levied within the Town of Atlantic Beach.
Where in Horry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Atlantic Beach Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Atlantic Beach Impact Fee FAQs
What are the total impact fees for a single-family home in Atlantic Beach, South Carolina?
A new single-family home in Atlantic Beach pays $9,824.00 per unit in combined impact fees (rates sourced November 19, 2026).
How much are commercial impact fees in Atlantic Beach?
Commercial development in Atlantic Beach pays no per-square-foot impact fees, but owes $9,924.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Atlantic Beach charge its own impact fees?
Yes. Atlantic Beach levies its own municipal impact or utility fees. Horry County does not currently add county-level impact fees inside Atlantic Beach. The schedule on this page shows every fee that applies to development in Atlantic Beach.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Horry County impact fees page.