North Myrtle Beach Impact Fees by Project Type
North Myrtle Beach: Single-Family Impact Fees
A new single-family home in North Myrtle Beach pays at least $9,824.00 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Capital Recovery Fee (City of North Myrtle Beach) ($4,493.00), Sewer Capital Recovery Fee (City of North Myrtle Beach) ($3,771.00) and Water Tap Fee (City of North Myrtle Beach) — 3/4" meter ($960.00).
City Development Impact Fees (City of North Myrtle Beach) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full North Myrtle Beach Impact Fee Schedule
- Water Capital Recovery Fee (City of North Myrtle Beach)$4,493.00City of North Myrtle BeachNorth Myrtle Beach water capital recovery fee: $4,493 per equivalent residential unit, and a single-family home is 1 unit, effective July 1, 2026 through June 30, 2027. Paid at building permit, separate from the water tap fee. Reset each July 1 in the city budget.
- Water Tap Fee (City of North Myrtle Beach) — 3/4" meter$960.00City of North Myrtle BeachNorth Myrtle Beach water tap fee for a 3/4 inch meter: $960, effective July 1, 2026, plus a refundable deposit.
- Sewer Capital Recovery Fee (City of North Myrtle Beach)$3,771.00City of North Myrtle BeachNorth Myrtle Beach wastewater capital recovery fee: $3,771 per equivalent residential unit, and a single-family home is 1 unit, effective July 1, 2026 through June 30, 2027. Paid at building permit, separate from the sewer tap fee. Reset each July 1 in the city budget.
- Sewer Tap Fee (City of North Myrtle Beach) — 4" lateral (single-family minimum)$600.00City of North Myrtle BeachNorth Myrtle Beach sewer tap fee for a 4 inch lateral: $600, effective July 1, 2026; four inches is the single-family minimum.
- City Development Impact Fees (City of North Myrtle Beach)Requires confirmationCity of North Myrtle Beach
- County Development Impact Fee (Horry County)$0.00Horry CountyHorry County's development impact fee applies only in unincorporated Horry County, so it is not charged inside city limits.
Where in Horry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
North Myrtle Beach: Multifamily Impact Fees
A new multifamily unit in North Myrtle Beach pays at least $10,064.00 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Capital Recovery Fee (City of North Myrtle Beach, MF) — 1.0 ERU per unit × $4,493/ERU ($4,493.00), Sewer Capital Recovery Fee (City of North Myrtle Beach, MF) — 1.0 ERU per unit × $3,771/ERU ($3,771.00) and Water Tap Fee (City of North Myrtle Beach, MF) — 3/4" meter ($960.00).
City Development Impact Fees (City of North Myrtle Beach, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full North Myrtle Beach Impact Fee Schedule
- Water Capital Recovery Fee (City of North Myrtle Beach, MF) — 1.0 ERU per unit × $4,493/ERU$4,493.00City of North Myrtle BeachCharged per unit: North Myrtle Beach rates apartments, condos and patio homes at 1 equivalent residential unit each, $4,493 for water, effective July 1, 2026 through June 30, 2027. Reset each July 1 in the city budget.
- Water Tap Fee (City of North Myrtle Beach, MF) — 3/4" meter$960.00City of North Myrtle BeachNorth Myrtle Beach water tap fee for a 3/4 inch meter: $960, effective July 1, 2026, plus a refundable deposit. A building on one meter pays once.
- Sewer Capital Recovery Fee (City of North Myrtle Beach, MF) — 1.0 ERU per unit × $3,771/ERU$3,771.00City of North Myrtle BeachCharged per unit: North Myrtle Beach rates apartments, condos and patio homes at 1 equivalent residential unit each, $3,771 for wastewater, effective July 1, 2026 through June 30, 2027. Reset each July 1 in the city budget.
- Sewer Tap Fee (City of North Myrtle Beach, MF)$840.006" lateral (multifamily over 2 units minimum)City of North Myrtle BeachNorth Myrtle Beach sets sewer tap fees by lateral size, not per unit; a multifamily building of more than two units needs at least a 6-inch lateral: $840, effective July 1, 2026, larger at cost. A building on one lateral pays the tap once.
- City Development Impact Fees (City of North Myrtle Beach, MF)Requires confirmationCity of North Myrtle Beach
- County Development Impact Fee (Horry County, MF)$0.00Horry CountyHorry County's development impact fee applies only in unincorporated Horry County, so it is not charged inside city limits.
Where in Horry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
North Myrtle Beach: Commercial Impact Fees
Commercial development in North Myrtle Beach pays no per-square-foot impact fees, but owes $9,924.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to at least $9,924.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (City of North Myrtle Beach) — 1" meter ($1,060.00 one-time) and Sewer Tap Fee (City of North Myrtle Beach) — 4" lateral ($600.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Capital Recovery Fee (City of North Myrtle Beach) and Sewer Capital Recovery Fee (City of North Myrtle Beach) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee (City of North Myrtle Beach, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full North Myrtle Beach Impact Fee Schedule
- Water Capital Recovery Fee (City of North Myrtle Beach)$4,493.00 one-timeRequires confirmationEffective July 1, 2026 (FY2027 Adopted Budget): $4,493 per ERU. One ERU = 317 gallons/day; a commercial project is assigned an ERU count by the City. Paid at building-permit issuance. Increases about 5% each July 1 (roughly $4,718 on July 1, 2027).
- Water Tap Fee (City of North Myrtle Beach) — 1" meter$1,060.00 one-timeEffective July 1, 2026 (FY2027 Adopted Budget); rate for a 1" meter. Water tap fee is set by meter size and is separate from the water capital recovery (impact) fee.
- Water Tap Fee (City of North Myrtle Beach) — 6" and larger meter$0.00For 6-inch and larger meters the water tap fee is the City's actual cost of labor and materials plus 50% (no fixed published amount). Effective July 1, 2026.
- Sewer Capital Recovery Fee (City of North Myrtle Beach)$3,771.00 one-timeRequires confirmationEffective July 1, 2026 (FY2027 Adopted Budget): $3,771 per ERU. One ERU = 317 gallons/day; a commercial project is assigned an ERU count by the City. Paid at building-permit issuance. Increases about 5% each July 1 (roughly $3,960 on July 1, 2027).
- Sewer Tap Fee (City of North Myrtle Beach) — 4" lateral$600.00 one-timeEffective July 1, 2026; rate for the standard 4" sewer lateral. Set by lateral size (6" is $840; over 6" is actual cost). Separate from the sewer capital recovery (impact) fee.
- Sewer Tap Fee (City of North Myrtle Beach) — over 6" lateral$0.00For sewer laterals over 6 inches the tap fee is the City's actual cost (no fixed published amount). Effective July 1, 2026.
- City Impact Fee (City of North Myrtle Beach, Commercial)Requires confirmationThe City of North Myrtle Beach does not levy a municipal impact fee on nonresidential development. Water and sewer capital recovery fees are charged separately (see the Water/Sewer records).
- County Impact Fee (Horry County, Commercial)$0.00Horry County development impact fees apply only in unincorporated Horry County; they are not levied within the City of North Myrtle Beach.
Where in Horry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
North Myrtle Beach: Industrial Impact Fees
Industrial development in North Myrtle Beach pays no per-square-foot impact fees, but owes $9,924.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to at least $9,924.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (City of North Myrtle Beach) — 1" meter ($1,060.00 one-time) and Sewer Tap Fee (City of North Myrtle Beach) — 4" lateral ($600.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Capital Recovery Fee (City of North Myrtle Beach) and Sewer Capital Recovery Fee (City of North Myrtle Beach) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee (City of North Myrtle Beach, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full North Myrtle Beach Impact Fee Schedule
- Water Capital Recovery Fee (City of North Myrtle Beach)$4,493.00 one-timeRequires confirmationEffective July 1, 2026 (FY2027 Adopted Budget): $4,493 per ERU. One ERU = 317 gallons/day; a commercial project is assigned an ERU count by the City. Paid at building-permit issuance. Increases about 5% each July 1 (roughly $4,718 on July 1, 2027).
- Water Tap Fee (City of North Myrtle Beach) — 1" meter$1,060.00 one-timeEffective July 1, 2026 (FY2027 Adopted Budget); rate for a 1" meter. Water tap fee is set by meter size and is separate from the water capital recovery (impact) fee.
- Water Tap Fee (City of North Myrtle Beach) — 6" and larger meter$0.00For 6-inch and larger meters the water tap fee is the City's actual cost of labor and materials plus 50% (no fixed published amount). Effective July 1, 2026.
- Sewer Capital Recovery Fee (City of North Myrtle Beach)$3,771.00 one-timeRequires confirmationEffective July 1, 2026 (FY2027 Adopted Budget): $3,771 per ERU. One ERU = 317 gallons/day; a commercial project is assigned an ERU count by the City. Paid at building-permit issuance. Increases about 5% each July 1 (roughly $3,960 on July 1, 2027).
- Sewer Tap Fee (City of North Myrtle Beach) — 4" lateral$600.00 one-timeEffective July 1, 2026; rate for the standard 4" sewer lateral. Set by lateral size (6" is $840; over 6" is actual cost). Separate from the sewer capital recovery (impact) fee.
- Sewer Tap Fee (City of North Myrtle Beach) — over 6" lateral$0.00For sewer laterals over 6 inches the tap fee is the City's actual cost (no fixed published amount). Effective July 1, 2026.
- City Impact Fee (City of North Myrtle Beach, Industrial)Requires confirmationThe City of North Myrtle Beach does not levy a municipal impact fee on nonresidential development. Water and sewer capital recovery fees are charged separately (see the Water/Sewer records).
- County Impact Fee (Horry County, Industrial)$0.00Horry County development impact fees apply only in unincorporated Horry County; they are not levied within the City of North Myrtle Beach.
Where in Horry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
North Myrtle Beach: Office Impact Fees
Office development in North Myrtle Beach pays no per-square-foot impact fees, but owes $9,924.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 25,000 sq ft building, that comes to at least $9,924.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (City of North Myrtle Beach) — 1" meter ($1,060.00 one-time) and Sewer Tap Fee (City of North Myrtle Beach) — 4" lateral ($600.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Capital Recovery Fee (City of North Myrtle Beach) and Sewer Capital Recovery Fee (City of North Myrtle Beach) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee (City of North Myrtle Beach, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full North Myrtle Beach Impact Fee Schedule
- Water Capital Recovery Fee (City of North Myrtle Beach)$4,493.00 one-timeRequires confirmationEffective July 1, 2026 (FY2027 Adopted Budget): $4,493 per ERU. One ERU = 317 gallons/day; a commercial project is assigned an ERU count by the City. Paid at building-permit issuance. Increases about 5% each July 1 (roughly $4,718 on July 1, 2027).
- Water Tap Fee (City of North Myrtle Beach) — 1" meter$1,060.00 one-timeEffective July 1, 2026 (FY2027 Adopted Budget); rate for a 1" meter. Water tap fee is set by meter size and is separate from the water capital recovery (impact) fee.
- Water Tap Fee (City of North Myrtle Beach) — 6" and larger meter$0.00For 6-inch and larger meters the water tap fee is the City's actual cost of labor and materials plus 50% (no fixed published amount). Effective July 1, 2026.
- Sewer Capital Recovery Fee (City of North Myrtle Beach)$3,771.00 one-timeRequires confirmationEffective July 1, 2026 (FY2027 Adopted Budget): $3,771 per ERU. One ERU = 317 gallons/day; a commercial project is assigned an ERU count by the City. Paid at building-permit issuance. Increases about 5% each July 1 (roughly $3,960 on July 1, 2027).
- Sewer Tap Fee (City of North Myrtle Beach) — 4" lateral$600.00 one-timeEffective July 1, 2026; rate for the standard 4" sewer lateral. Set by lateral size (6" is $840; over 6" is actual cost). Separate from the sewer capital recovery (impact) fee.
- Sewer Tap Fee (City of North Myrtle Beach) — over 6" lateral$0.00For sewer laterals over 6 inches the tap fee is the City's actual cost (no fixed published amount). Effective July 1, 2026.
- City Impact Fee (City of North Myrtle Beach, Office)Requires confirmationThe City of North Myrtle Beach does not levy a municipal impact fee on nonresidential development. Water and sewer capital recovery fees are charged separately (see the Water/Sewer records).
- County Impact Fee (Horry County, Office)$0.00Horry County development impact fees apply only in unincorporated Horry County; they are not levied within the City of North Myrtle Beach.
Where in Horry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
North Myrtle Beach Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
North Myrtle Beach Impact Fee FAQs
What are the total impact fees for a single-family home in North Myrtle Beach, South Carolina?
A new single-family home in North Myrtle Beach pays at least $9,824.00 per unit in combined impact fees (rates sourced November 19, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in North Myrtle Beach?
Commercial development in North Myrtle Beach pays no per-square-foot impact fees, but owes $9,924.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does North Myrtle Beach charge its own impact fees?
Yes. North Myrtle Beach levies its own municipal impact or utility fees. Horry County does not currently add county-level impact fees inside North Myrtle Beach. The schedule on this page shows every fee that applies to development in North Myrtle Beach.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Horry County impact fees page.