Surfside Beach, South Carolina Impact Fees

Surfside Beach applies its own fee schedule. Horry County does not currently add county-level impact fees inside city limits. A new single-family home pays $5,770.00 per unit (rates sourced ). The full breakdown is below.

Surfside Beach Impact Fees by Project Type

Surfside Beach: Single-Family Impact Fees

A new single-family home in Surfside Beach pays $5,770.00 per unit in impact fees (rates sourced November 12, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Impact Fee (GSWSA) ($2,735.00), Water Impact Fee (GSWSA) ($1,225.00) and Sewer Tap Fee (GSWSA) ($1,020.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Surfside Beach Impact Fee Schedule
Water$2,015.00
  • Water Impact Fee (GSWSA)
    Grand Strand Water & Sewer Authority
    Grand Strand Water and Sewer Authority has provided water and sewer service in Surfside Beach since taking over the town utility in 1994. Water impact fee: $1,225 per residential equivalent unit, and a home is 1 unit.
    $1,225.00
  • Water Tap Fee (GSWSA) — new tap
    Grand Strand Water & Sewer Authority
    GSWSA water tap fee for a new service tap. Where a tap was already made, for example on a lot in a developer-built subdivision, GSWSA charges a $630 meter base fee instead, never both. Separate from the water impact fee; a $40 new service installation fee also applies.
    $790.00
Sewer$3,755.00
  • Sewer Impact Fee (GSWSA)
    Grand Strand Water & Sewer Authority
    Grand Strand Water and Sewer Authority has provided water and sewer service in Surfside Beach since taking over the town utility in 1994. Sewer impact fee: $2,735 per residential equivalent unit, and a home is 1 unit.
    $2,735.00
  • Sewer Tap Fee (GSWSA)
    Grand Strand Water & Sewer Authority
    GSWSA sewer tap fee for a standard residential service connection, plus an $80 sewer connection inspection fee. Deeper or nonstandard taps are priced higher. Separate from the sewer impact fee.
    $1,020.00
City$0.00
County$0.00
Total (Surfside Beach): $5,770.00
Sources last checked Official fee schedules:Grand Strand Water & Sewer Authority Town of Surfside Beach Horry County

Where in Horry County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Surfside Beach: Multifamily Impact Fees

A new multifamily unit in Surfside Beach pays $5,770.00 per unit in impact fees (rates sourced November 12, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Impact Fee (GSWSA, MF) — 1 REU per dwelling unit × $2,735/REU ($2,735.00), Water Impact Fee (GSWSA, MF) — 1 REU per dwelling unit × $1,225/REU ($1,225.00) and Sewer Tap Fee (GSWSA, MF) ($1,020.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Surfside Beach Impact Fee Schedule
Water$2,015.00
  • Water Impact Fee (GSWSA, MF) — 1 REU per dwelling unit × $1,225/REU
    Grand Strand Water & Sewer Authority
    GSWSA water impact fee: $1,225 per residential equivalent unit. GSWSA assesses each dwelling unit as one unit, whether single family or multifamily and whether individually or master metered.
    $1,225.00
  • Water Tap Fee (GSWSA, MF) — new tap
    Grand Strand Water & Sewer Authority
    Charged per tap, not per unit: a building served by one water connection pays it once. Where a tap was already made, GSWSA charges a $630 meter base fee instead, never both. Separate from the water impact fee.
    $790.00
Sewer$3,755.00
  • Sewer Impact Fee (GSWSA, MF) — 1 REU per dwelling unit × $2,735/REU
    Grand Strand Water & Sewer Authority
    GSWSA sewer impact fee: $2,735 per residential equivalent unit. GSWSA assesses each dwelling unit as one unit, whether single family or multifamily and whether individually or master metered.
    $2,735.00
  • Sewer Tap Fee (GSWSA, MF)
    Grand Strand Water & Sewer Authority
    GSWSA sewer tap fee for a standard service connection. Charged per connection, not per unit: a building served by one sewer service line pays it once. Deeper or nonstandard taps are priced higher, and a separate $80 sewer connection inspection fee applies. Separate from the sewer impact fee, which is charged per dwelling unit.
    $1,020.00
City$0.00
County$0.00
Total (Surfside Beach): $5,770.00
Sources last checked Official fee schedules:Grand Strand Water & Sewer Authority Town of Surfside Beach Horry County

Where in Horry County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Surfside Beach: Commercial Impact Fees

Commercial development in Surfside Beach pays no per-square-foot impact fees, but owes $17,650.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).

For a 50,000 sq ft building, that comes to about $17,650.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (GSWSA) — 1" meter, 4 REU × $2,735/REU ($10,940.00 one-time) and Water Impact Fee (GSWSA) — 1" meter, 4 REU × $1,225/REU ($4,900.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (GSWSA) and Water Tap Fee (GSWSA) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Surfside Beach Impact Fee Schedule
Water$5,690.00 one-time
  • Water Impact Fee (GSWSA) — 1" meter, 4 REU × $1,225/REU
    GSWSA water impact fee: $1,225 per residential equivalent unit (REU), charged on the higher of the meter-size minimum or the project's calculated demand. Shown: 1-inch meter, 4 REU minimum. Some areas carry supplemental impact fees.
    $4,900.00 one-time
  • Water Tap Fee (GSWSA)
    GSWSA water tap fee for a new service tap, separate from the water impact fee. Larger commercial taps may be priced differently by the Authority.
    $790.00 one-timeRequires confirmation
Sewer$11,960.00 one-time
  • Sewer Impact Fee (GSWSA) — 1" meter, 4 REU × $2,735/REU
    GSWSA sewer impact fee: $2,735 per residential equivalent unit (REU), charged on the higher of the water-meter-size minimum or the project's calculated demand. Shown: 1-inch meter, 4 REU minimum.
    $10,940.00 one-time
  • Sewer Tap Fee (GSWSA)
    GSWSA sewer tap fee is $1,020 plus an $80 connection inspection fee. Separate from the sewer impact fee.
    $1,020.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Surfside Beach): $17,650.00 one-time (≈ $17,650.00 at 50,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Horry County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Surfside Beach: Industrial Impact Fees

Industrial development in Surfside Beach pays no per-square-foot impact fees, but owes $17,650.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).

For a 50,000 sq ft building, that comes to about $17,650.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (GSWSA) — 1" meter, 4 REU × $2,735/REU ($10,940.00 one-time) and Water Impact Fee (GSWSA) — 1" meter, 4 REU × $1,225/REU ($4,900.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (GSWSA) and Water Tap Fee (GSWSA) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Surfside Beach Impact Fee Schedule
Water$5,690.00 one-time
  • Water Impact Fee (GSWSA) — 1" meter, 4 REU × $1,225/REU
    GSWSA water impact fee: $1,225 per residential equivalent unit (REU), charged on the higher of the meter-size minimum or the project's calculated demand. Shown: 1-inch meter, 4 REU minimum. Some areas carry supplemental impact fees.
    $4,900.00 one-time
  • Water Tap Fee (GSWSA)
    GSWSA water tap fee for a new service tap, separate from the water impact fee. Larger commercial taps may be priced differently by the Authority.
    $790.00 one-timeRequires confirmation
Sewer$11,960.00 one-time
  • Sewer Impact Fee (GSWSA) — 1" meter, 4 REU × $2,735/REU
    GSWSA sewer impact fee: $2,735 per residential equivalent unit (REU), charged on the higher of the water-meter-size minimum or the project's calculated demand. Shown: 1-inch meter, 4 REU minimum.
    $10,940.00 one-time
  • Sewer Tap Fee (GSWSA)
    GSWSA sewer tap fee is $1,020 plus an $80 connection inspection fee. Separate from the sewer impact fee.
    $1,020.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Surfside Beach): $17,650.00 one-time (≈ $17,650.00 at 50,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Horry County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Surfside Beach: Office Impact Fees

Office development in Surfside Beach pays no per-square-foot impact fees, but owes $17,650.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).

For a 25,000 sq ft building, that comes to about $17,650.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (GSWSA) — 1" meter, 4 REU × $2,735/REU ($10,940.00 one-time) and Water Impact Fee (GSWSA) — 1" meter, 4 REU × $1,225/REU ($4,900.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (GSWSA) and Water Tap Fee (GSWSA) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Surfside Beach Impact Fee Schedule
Water$5,690.00 one-time
  • Water Impact Fee (GSWSA) — 1" meter, 4 REU × $1,225/REU
    GSWSA water impact fee: $1,225 per residential equivalent unit (REU), charged on the higher of the meter-size minimum or the project's calculated demand. Shown: 1-inch meter, 4 REU minimum. Some areas carry supplemental impact fees.
    $4,900.00 one-time
  • Water Tap Fee (GSWSA)
    GSWSA water tap fee for a new service tap, separate from the water impact fee. Larger commercial taps may be priced differently by the Authority.
    $790.00 one-timeRequires confirmation
Sewer$11,960.00 one-time
  • Sewer Impact Fee (GSWSA) — 1" meter, 4 REU × $2,735/REU
    GSWSA sewer impact fee: $2,735 per residential equivalent unit (REU), charged on the higher of the water-meter-size minimum or the project's calculated demand. Shown: 1-inch meter, 4 REU minimum.
    $10,940.00 one-time
  • Sewer Tap Fee (GSWSA)
    GSWSA sewer tap fee is $1,020 plus an $80 connection inspection fee. Separate from the sewer impact fee.
    $1,020.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Surfside Beach): $17,650.00 one-time (≈ $17,650.00 at 25,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Horry County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Surfside Beach Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Surfside Beach Impact Fee FAQs

What are the total impact fees for a single-family home in Surfside Beach, South Carolina?

A new single-family home in Surfside Beach pays $5,770.00 per unit in combined impact fees (rates sourced November 12, 2026).

How much are commercial impact fees in Surfside Beach?

Commercial development in Surfside Beach pays no per-square-foot impact fees, but owes $17,650.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Surfside Beach charge its own impact fees?

Yes. Surfside Beach levies its own municipal impact or utility fees. Horry County does not currently add county-level impact fees inside Surfside Beach. The schedule on this page shows every fee that applies to development in Surfside Beach.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Horry County impact fees page.