Loris, South Carolina Impact Fees

Loris applies its own fee schedule. Horry County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $6,200.00 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Loris Impact Fees by Project Type

Loris: Single-Family Impact Fees

A new single-family home in Loris pays at least $6,200.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Impact Fee (City of Loris) — 4" sewer w/ 3/4" meter ($2,500.00), Water Impact Fee (City of Loris) — 3/4" meter ($2,000.00) and Water Tap Fee (City of Loris) — 3/4" meter ($950.00).

Fire Impact Fee (City of Loris) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Loris Impact Fee Schedule
Water$2,950.00
  • Water Impact Fee (City of Loris) — 3/4" meter
    3/4" meter, in-city
    City of Loris
    City of Loris water impact fee for a 3/4 inch meter inside the city: $2,000 (Ordinance 05-26, FY2026-27). Outside-city rates are higher; properties contiguous to the city must annex to receive in-city rates.
    $2,000.00
  • Water Tap Fee (City of Loris) — 3/4" meter
    3/4" meter, in-city
    City of Loris
    City of Loris water tap fee for a 3/4 inch meter inside the city: $950 (Ordinance 05-26, FY2026-27). Outside-city rates are higher; properties contiguous to the city must annex to receive in-city rates.
    $950.00
Sewer$3,250.00
  • Sewer Impact Fee (City of Loris) — 4" sewer w/ 3/4" meter
    4" sewer w/ 3/4" meter, in-city
    City of Loris
    City of Loris sewer impact fee for a 4 inch sewer w/ 3/4 inch meter inside the city: $2,500 (Ordinance 05-26, FY2026-27). Outside-city rates are higher; properties contiguous to the city must annex to receive in-city rates.
    $2,500.00
  • Sewer Tap Fee (City of Loris) — 4" sewer w/ 3/4" meter
    4" sewer w/ 3/4" meter, in-city
    City of Loris
    City of Loris sewer tap fee for a 4 inch sewer w/ 3/4 inch meter inside the city: $750 (Ordinance 05-26, FY2026-27). Outside-city rates are higher; properties contiguous to the city must annex to receive in-city rates.
    $750.00
City$0.00
  • Fire Impact Fee (City of Loris)
    City of Loris
    Loris charges a fire impact fee of 0.5% of project cost on single-family construction, collected with the building permit. The amount depends on construction cost, so it is not included in the total. Loris levies no other development impact fee.
    Requires confirmation
County$0.00
Total (Loris): $6,200.00
Sources last checked Official fee schedules:City of Loris Horry County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Horry County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Loris: Multifamily Impact Fees

A new multifamily unit in Loris pays at least $6,200.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Impact Fee (City of Loris, MF) — 4" sewer w/ 3/4" meter ($2,500.00), Water Impact Fee (City of Loris, MF) — 3/4" meter ($2,000.00) and Water Tap Fee (City of Loris, MF) — 3/4" meter ($950.00).

Fire Impact Fee (City of Loris, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Loris Impact Fee Schedule
Water$2,950.00
  • Water Impact Fee (City of Loris, MF) — 3/4" meter
    3/4" meter, in-city
    City of Loris
    City of Loris water impact fee for a 3/4 inch meter inside the city: $2,000 (Ordinance 05-26, FY2026-27). Outside-city rates are higher; properties contiguous to the city must annex to receive in-city rates. A building on one connection pays once.
    $2,000.00
  • Water Tap Fee (City of Loris, MF) — 3/4" meter
    3/4" meter, in-city
    City of Loris
    City of Loris water tap fee for a 3/4 inch meter inside the city: $950 (Ordinance 05-26, FY2026-27). Outside-city rates are higher; properties contiguous to the city must annex to receive in-city rates. A building on one connection pays once.
    $950.00
Sewer$3,250.00
  • Sewer Impact Fee (City of Loris, MF) — 4" sewer w/ 3/4" meter
    4" sewer w/ 3/4" meter, in-city
    City of Loris
    City of Loris sewer impact fee for a 4 inch sewer w/ 3/4 inch meter inside the city: $2,500 (Ordinance 05-26, FY2026-27). Outside-city rates are higher; properties contiguous to the city must annex to receive in-city rates. A building on one connection pays once.
    $2,500.00
  • Sewer Tap Fee (City of Loris, MF) — 4" sewer w/ 3/4" meter
    4" sewer w/ 3/4" meter, in-city
    City of Loris
    City of Loris sewer tap fee for a 4 inch sewer w/ 3/4 inch meter inside the city: $750 (Ordinance 05-26, FY2026-27). Outside-city rates are higher; properties contiguous to the city must annex to receive in-city rates. A building on one connection pays once.
    $750.00
City$0.00
  • Fire Impact Fee (City of Loris, MF)
    City of Loris
    Loris charges a fire impact fee of 1% of project cost on multifamily construction, collected with the building permit. The amount depends on construction cost, so it is not included in the total. Loris levies no other development impact fee.
    Requires confirmation
County$0.00
Total (Loris): $6,200.00
Sources last checked Official fee schedules:City of Loris Horry County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Horry County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Loris: Commercial Impact Fees

Commercial development in Loris pays no per-square-foot impact fees, but owes $11,150.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to at least $11,150.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Loris) — 1" meter ($4,000.00 one-time), Water Impact Fee (City of Loris) — 1" meter ($3,100.00 one-time) and Sewer Tap Fee (City of Loris) — 1" meter ($2,550.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Fire Impact Fee (City of Loris, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Loris Impact Fee Schedule
Water$4,600.00 one-time
  • Water Impact Fee (City of Loris) — 1" meter
    Effective FY2026-27 (Ordinance 05-26, adopted June 29, 2026); in-city rate for a 1" meter. Properties outside city limits pay a higher out-of-city rate. Impact fee is set by meter size, is separate from the water tap fee, and is revisited each July.
    $3,100.00 one-time
  • Water Tap Fee (City of Loris) — 1" meter
    Effective FY2026-27 (Ordinance 05-26, adopted June 29, 2026); in-city rate for a 1" meter. Properties outside city limits pay a higher out-of-city rate. Water tap fee is set by meter size, is separate from the water impact fee, and is revisited each July.
    $1,500.00 one-time
Sewer$6,550.00 one-time
  • Sewer Impact Fee (City of Loris) — 1" meter
    Effective FY2026-27 (Ordinance 05-26, adopted June 29, 2026); in-city rate for a 1" meter. Properties outside city limits pay a higher out-of-city rate. Impact fee is set by meter size, is separate from the sewer tap fee, and is revisited each July.
    $4,000.00 one-time
  • Sewer Tap Fee (City of Loris) — 1" meter
    Effective FY2026-27 (Ordinance 05-26, adopted June 29, 2026); in-city rate for a 1" meter. Properties outside city limits pay a higher out-of-city rate. Sewer tap fee is set by meter size, is separate from the sewer impact fee, and is revisited each July.
    $2,550.00 one-time
City$0.00
  • Fire Impact Fee (City of Loris, Commercial)
    City of Loris
    The City of Loris charges a fire impact fee of 1% of project cost on nonresidential (commercial) construction, collected with the building permit.
    Requires confirmation
County$0.00
Total (Loris): $11,150.00 one-time (≈ $11,150.00 at 50,000 sq ft)
Sources last checked Official fee schedule:City of Loris
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Horry County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Loris: Industrial Impact Fees

Industrial development in Loris pays no per-square-foot impact fees, but owes $11,150.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to at least $11,150.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Loris) — 1" meter ($4,000.00 one-time), Water Impact Fee (City of Loris) — 1" meter ($3,100.00 one-time) and Sewer Tap Fee (City of Loris) — 1" meter ($2,550.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Fire Impact Fee (City of Loris, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Loris Impact Fee Schedule
Water$4,600.00 one-time
  • Water Impact Fee (City of Loris) — 1" meter
    Effective FY2026-27 (Ordinance 05-26, adopted June 29, 2026); in-city rate for a 1" meter. Properties outside city limits pay a higher out-of-city rate. Impact fee is set by meter size, is separate from the water tap fee, and is revisited each July.
    $3,100.00 one-time
  • Water Tap Fee (City of Loris) — 1" meter
    Effective FY2026-27 (Ordinance 05-26, adopted June 29, 2026); in-city rate for a 1" meter. Properties outside city limits pay a higher out-of-city rate. Water tap fee is set by meter size, is separate from the water impact fee, and is revisited each July.
    $1,500.00 one-time
Sewer$6,550.00 one-time
  • Sewer Impact Fee (City of Loris) — 1" meter
    Effective FY2026-27 (Ordinance 05-26, adopted June 29, 2026); in-city rate for a 1" meter. Properties outside city limits pay a higher out-of-city rate. Impact fee is set by meter size, is separate from the sewer tap fee, and is revisited each July.
    $4,000.00 one-time
  • Sewer Tap Fee (City of Loris) — 1" meter
    Effective FY2026-27 (Ordinance 05-26, adopted June 29, 2026); in-city rate for a 1" meter. Properties outside city limits pay a higher out-of-city rate. Sewer tap fee is set by meter size, is separate from the sewer impact fee, and is revisited each July.
    $2,550.00 one-time
City$0.00
  • Fire Impact Fee (City of Loris, Industrial)
    City of Loris
    The City of Loris charges a fire impact fee of 1% of project cost on nonresidential (commercial) construction, collected with the building permit.
    Requires confirmation
County$0.00
Total (Loris): $11,150.00 one-time (≈ $11,150.00 at 50,000 sq ft)
Sources last checked Official fee schedule:City of Loris
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Horry County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Loris: Office Impact Fees

Office development in Loris pays no per-square-foot impact fees, but owes $11,150.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 25,000 sq ft building, that comes to at least $11,150.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (City of Loris) — 1" meter ($4,000.00 one-time), Water Impact Fee (City of Loris) — 1" meter ($3,100.00 one-time) and Sewer Tap Fee (City of Loris) — 1" meter ($2,550.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Fire Impact Fee (City of Loris, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Loris Impact Fee Schedule
Water$4,600.00 one-time
  • Water Impact Fee (City of Loris) — 1" meter
    Effective FY2026-27 (Ordinance 05-26, adopted June 29, 2026); in-city rate for a 1" meter. Properties outside city limits pay a higher out-of-city rate. Impact fee is set by meter size, is separate from the water tap fee, and is revisited each July.
    $3,100.00 one-time
  • Water Tap Fee (City of Loris) — 1" meter
    Effective FY2026-27 (Ordinance 05-26, adopted June 29, 2026); in-city rate for a 1" meter. Properties outside city limits pay a higher out-of-city rate. Water tap fee is set by meter size, is separate from the water impact fee, and is revisited each July.
    $1,500.00 one-time
Sewer$6,550.00 one-time
  • Sewer Impact Fee (City of Loris) — 1" meter
    Effective FY2026-27 (Ordinance 05-26, adopted June 29, 2026); in-city rate for a 1" meter. Properties outside city limits pay a higher out-of-city rate. Impact fee is set by meter size, is separate from the sewer tap fee, and is revisited each July.
    $4,000.00 one-time
  • Sewer Tap Fee (City of Loris) — 1" meter
    Effective FY2026-27 (Ordinance 05-26, adopted June 29, 2026); in-city rate for a 1" meter. Properties outside city limits pay a higher out-of-city rate. Sewer tap fee is set by meter size, is separate from the sewer impact fee, and is revisited each July.
    $2,550.00 one-time
City$0.00
  • Fire Impact Fee (City of Loris, Office)
    City of Loris
    The City of Loris charges a fire impact fee of 1% of project cost on nonresidential (commercial) construction, collected with the building permit.
    Requires confirmation
County$0.00
Total (Loris): $11,150.00 one-time (≈ $11,150.00 at 25,000 sq ft)
Sources last checked Official fee schedule:City of Loris
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Horry County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Loris Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Loris Impact Fee FAQs

What are the total impact fees for a single-family home in Loris, South Carolina?

A new single-family home in Loris pays at least $6,200.00 per unit in combined impact fees (rates sourced November 11, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Loris?

Commercial development in Loris pays no per-square-foot impact fees, but owes $11,150.00 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Loris charge its own impact fees?

Yes. Loris levies its own municipal impact or utility fees. Horry County does not currently add county-level impact fees inside Loris. The schedule on this page shows every fee that applies to development in Loris.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Horry County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000