Conway Impact Fees by Project Type
Conway: Single-Family Impact Fees
A new single-family home in Conway pays $6,000.00 per unit in impact fees (rates sourced November 12, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Capital Recovery Charge (City of Conway) ($2,200.00), Water Capital Recovery Charge (City of Conway) ($2,000.00) and Water Meter Connection Fee (City of Conway) — 3/4" meter, in-city ($1,800.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Conway Impact Fee Schedule
- Water Capital Recovery Charge (City of Conway)$2,000.00Residential / subdivision 4 lots or fewerCity of ConwayConway's water capital recovery charge is $2,000 per residential equivalent unit for a home on an individual lot or in a subdivision of 4 or fewer lots, effective July 1, 2026. Lots in subdivisions of 5 or more pay $2,600. The same amount applies inside and outside city limits.
- Water Meter Connection Fee (City of Conway) — 3/4" meter, in-city$1,800.00City of ConwayConway installs the water tap, service line and meter for one charge: $1,800 for a 3/4 inch meter inside the city (effective July 1, 2026); 2-inch and larger at actual cost.
- Sewer Capital Recovery Charge (City of Conway)$2,200.00Residential / subdivision 4 lots or fewerCity of ConwayConway's sewer capital recovery charge is $2,200 per residential equivalent unit for an individual lot or a subdivision of 4 or fewer lots, and $2,800 in subdivisions of 5 or more lots, effective July 1, 2026. Some areas outside city limits are sewered by Grand Strand Water and Sewer Authority instead.
- Sewer Tap Fee (City of Conway)$0.00City of ConwayConway's fee schedule lists no tap fee for a standard gravity sewer connection; the sewer capital recovery charge is the one-time sewer cost. Lots served by a residential pump station pay a $1,000 tap fee and a $7,500 installation charge instead.
- City Development Impact Fees (City of Conway)$0.00City of Conway
- County Development Impact Fee (Horry County)$0.00Horry CountyHorry County's development impact fee applies only in unincorporated Horry County, so it is not charged inside city limits.
Where in Horry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Conway: Multifamily Impact Fees
A new multifamily unit in Conway pays $7,200.00 per unit in impact fees (rates sourced November 12, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Meter Connection Fee (City of Conway, MF) — 3/4" meter, in-city ($1,800.00).
Water Capital Recovery Charge (City of Conway, MF) and Sewer Capital Recovery Charge (City of Conway, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Conway Impact Fee Schedule
- Water Capital Recovery Charge (City of Conway, MF)$2,600.00Requires confirmationSubdivision of 5+ lots / commercial tierCity of ConwayConway assesses water capital recovery per residential equivalent unit using the city's contributory loading chart. The rate for subdivisions of 5 or more lots and commercial customers is $2,600 per unit of capacity, effective July 1, 2026.
- Water Meter Connection Fee (City of Conway, MF) — 3/4" meter, in-city$1,800.00City of ConwayConway installs the water tap, service line and meter for one charge: $1,800 for a 3/4 inch meter inside the city (effective July 1, 2026); 2-inch and larger at actual cost. City code calls for a separate meter for each dwelling; a large apartment complex may use a master meter with the utilities director's approval.
- Sewer Capital Recovery Charge (City of Conway, MF)$2,800.00Requires confirmationSubdivision of 5+ lots / commercial tierCity of ConwayConway assesses sewer capital recovery per residential equivalent unit using the city's contributory loading chart. The rate for subdivisions of 5 or more lots and commercial customers is $2,800 per unit of capacity, effective July 1, 2026.
- Sewer Tap Fee (City of Conway, MF)$0.00City of ConwayConway's fee schedule lists no tap fee for a standard gravity sewer connection; sewer capital recovery is the one-time sewer cost.
- City Development Impact Fees (City of Conway, MF)$0.00City of Conway
- County Development Impact Fee (Horry County, MF)$0.00Horry CountyHorry County's development impact fee applies only in unincorporated Horry County, so it is not charged inside city limits.
Where in Horry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Conway: Commercial Impact Fees
Commercial development in Conway pays no per-square-foot impact fees, but owes $7,800.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).
For a 50,000 sq ft building, that comes to about $7,800.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Connection (City of Conway) — 1" meter ($2,400.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Capital Recovery Charge (City of Conway) and Sewer Capital Recovery Charge (City of Conway) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Conway Impact Fee Schedule
- Water Capital Recovery Charge (City of Conway)$2,600.00 one-timeRequires confirmationCity of ConwayCity of Conway water capital recovery charge for commercial development: $2,600 per residential equivalent unit (REU), effective July 1, 2026. Shown: 1 REU; the city assigns the REU count from its contributory loading chart. Same rate inside and outside city limits.
- Water Meter Connection (City of Conway) — 1" meter$2,400.00 one-timeCity of ConwayCity of Conway installs the tap, service connection and meter: $2,400 for a 1-inch meter inside city limits ($3,000 outside), effective July 1, 2026. Meters 2 inches and larger are charged at actual cost.
- Water Meter Connection (City of Conway) — 2" and larger meter$0.00City of ConwayWater meter connections of 2 inches and larger are charged at the City of Conway's actual cost of installation.
- Sewer Capital Recovery Charge (City of Conway)$2,800.00 one-timeRequires confirmationCity of ConwayCity of Conway sewer capital recovery charge for commercial development: $2,800 per residential equivalent unit (REU), effective July 1, 2026. Shown: 1 REU; the city assigns the REU count from its contributory loading chart. Same rate inside and outside city limits.
- City Impact Fee (City of Conway, Commercial)$0.00City of ConwayThe City of Conway does not levy a municipal impact fee on nonresidential development; municipal development charges are limited to building-permit and utility connection fees.
- County Impact Fee (Horry County, Commercial)$0.00Horry CountyHorry County development impact fees (Ord. 30-2026) are assessed only in unincorporated Horry County; not levied within the City of Conway.
Where in Horry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Conway: Industrial Impact Fees
Industrial development in Conway pays no per-square-foot impact fees, but owes $7,800.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).
For a 50,000 sq ft building, that comes to about $7,800.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Connection (City of Conway) — 1" meter ($2,400.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Capital Recovery Charge (City of Conway) and Sewer Capital Recovery Charge (City of Conway) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Conway Impact Fee Schedule
- Water Capital Recovery Charge (City of Conway)$2,600.00 one-timeRequires confirmationCity of ConwayCity of Conway water capital recovery charge for commercial development: $2,600 per residential equivalent unit (REU), effective July 1, 2026. Shown: 1 REU; the city assigns the REU count from its contributory loading chart. Same rate inside and outside city limits.
- Water Meter Connection (City of Conway) — 1" meter$2,400.00 one-timeCity of ConwayCity of Conway installs the tap, service connection and meter: $2,400 for a 1-inch meter inside city limits ($3,000 outside), effective July 1, 2026. Meters 2 inches and larger are charged at actual cost.
- Water Meter Connection (City of Conway) — 2" and larger meter$0.00City of ConwayWater meter connections of 2 inches and larger are charged at the City of Conway's actual cost of installation.
- Sewer Capital Recovery Charge (City of Conway)$2,800.00 one-timeRequires confirmationCity of ConwayCity of Conway sewer capital recovery charge for commercial development: $2,800 per residential equivalent unit (REU), effective July 1, 2026. Shown: 1 REU; the city assigns the REU count from its contributory loading chart. Same rate inside and outside city limits.
- City Impact Fee (City of Conway, Industrial)$0.00City of ConwayThe City of Conway does not levy a municipal impact fee on nonresidential development; municipal development charges are limited to building-permit and utility connection fees.
- County Impact Fee (Horry County, Industrial)$0.00Horry CountyHorry County development impact fees are assessed only in unincorporated Horry County; not levied within the City of Conway.
Where in Horry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Conway: Office Impact Fees
Office development in Conway pays no per-square-foot impact fees, but owes $7,800.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).
For a 25,000 sq ft building, that comes to about $7,800.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Connection (City of Conway) — 1" meter ($2,400.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Capital Recovery Charge (City of Conway) and Sewer Capital Recovery Charge (City of Conway) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Conway Impact Fee Schedule
- Water Capital Recovery Charge (City of Conway)$2,600.00 one-timeRequires confirmationCity of ConwayCity of Conway water capital recovery charge for commercial development: $2,600 per residential equivalent unit (REU), effective July 1, 2026. Shown: 1 REU; the city assigns the REU count from its contributory loading chart. Same rate inside and outside city limits.
- Water Meter Connection (City of Conway) — 1" meter$2,400.00 one-timeCity of ConwayCity of Conway installs the tap, service connection and meter: $2,400 for a 1-inch meter inside city limits ($3,000 outside), effective July 1, 2026. Meters 2 inches and larger are charged at actual cost.
- Water Meter Connection (City of Conway) — 2" and larger meter$0.00City of ConwayWater meter connections of 2 inches and larger are charged at the City of Conway's actual cost of installation.
- Sewer Capital Recovery Charge (City of Conway)$2,800.00 one-timeRequires confirmationCity of ConwayCity of Conway sewer capital recovery charge for commercial development: $2,800 per residential equivalent unit (REU), effective July 1, 2026. Shown: 1 REU; the city assigns the REU count from its contributory loading chart. Same rate inside and outside city limits.
- City Impact Fee (City of Conway, Office)$0.00City of ConwayThe City of Conway does not levy a municipal impact fee on nonresidential development; municipal development charges are limited to building-permit and utility connection fees.
- County Impact Fee (Horry County, Office)$0.00Horry CountyHorry County development impact fees are assessed only in unincorporated Horry County; not levied within the City of Conway.
Where in Horry County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Conway Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Conway Impact Fee FAQs
What are the total impact fees for a single-family home in Conway, South Carolina?
A new single-family home in Conway pays $6,000.00 per unit in combined impact fees (rates sourced November 12, 2026).
How much are commercial impact fees in Conway?
Commercial development in Conway pays no per-square-foot impact fees, but owes $7,800.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Conway charge its own impact fees?
Yes. Conway levies its own municipal impact or utility fees. Horry County does not currently add county-level impact fees inside Conway. The schedule on this page shows every fee that applies to development in Conway.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Horry County impact fees page.