Lady Lake applies its own fee schedule: municipal fees plus the Lake County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $16,337.00 per unit (rates sourced July 13, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Lady Lake impact fees by project type

Lady Lake: Single-Family Impact Fees

A new single-family home in Lady Lake pays at least $16,337.00 per unit in impact fees (rates sourced July 13, 2026). All of it is levied by Lake County.

The largest line items are School Impact Fee (Lake County, SFR) ($11,247.00), Fire Impact Fee (Lake County, SFR) ($536.00) and Parks Impact Fee (Lake County, SFR) ($263.00).

Roads Impact Fee (Lake County, SFR) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection/Capacity Fee (Town of Lady Lake, SFR) and Water Connection/Capacity Fee (Town of Lady Lake, SFR) are set by the utility and not published online. Municipal Impact Fees (Town of Lady Lake, SFR) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (Town of Lady Lake, SFR)
    Town of Lady Lake
    Town of Lady Lake operates its own water utility. Capacity/connection (impact) fee in Town Fee Schedule (eff. Jan 2025) but amount not extractable online. $0 placeholder. ⚠️ VERIFY: Utility Customer Service (352) 751-1525.
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (Town of Lady Lake, SFR)
    Town of Lady Lake
    Town of Lady Lake own sewer utility (limited service area; some septic). Capacity/connection fee in Fee Schedule; amount not extractable online. $0 placeholder. ⚠️ VERIFY: (352) 751-1525.
    Requires confirmation
City$0.00
  • Municipal Impact Fees (Town of Lady Lake, SFR)
    Town of Lady Lake
    Town of Lady Lake municipal impact fees (e.g. recreation) not confirmed against adopted Fee Schedule. $0 placeholder. ⚠️ VERIFY: Town Hall (352) 751-1525.
    Requires confirmation
County$16,337.00
Total (Lady Lake): $16,337.00
Sources last checked July 13, 2026Official fee schedules:Town of Lady Lake Lake County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lady Lake: Multifamily Impact Fees

A new multifamily unit in Lady Lake pays at least $12,609.00 per unit in impact fees (rates sourced July 13, 2026). All of it is levied by Lake County.

The largest line items are School Impact Fee - Multifamily 801+ sf ($9,543.00), Fire Impact Fee - Multifamily 801+ sf ($336.00) and Parks Impact Fee - Multifamily 801+ sf ($213.00).

Roads Impact Fee - Multifamily 801+ sf, 4+ Stories is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Connection/Capacity Fee (Town of Lady Lake, MF) and Sewer Connection/Capacity Fee (Town of Lady Lake, MF) are set by the utility and not published online. Municipal Impact Fees (Town of Lady Lake, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
Sewer$0.00
City$0.00
  • Municipal Impact Fees (Town of Lady Lake, MF)
    Town of Lady Lake
    Town of Lady Lake municipal impact fees (e.g. recreation) not confirmed against adopted Fee Schedule. $0 placeholder. ⚠️ VERIFY: (352) 751-1525.
    Requires confirmation
County$12,609.00
Total (Lady Lake): $12,609.00
Sources last checked July 13, 2026Official fee schedules:Town of Lady Lake Lake County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lady Lake: Commercial Impact Fees

Commercial development in Lady Lake pays $5.06 per square foot in impact fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to at least $253,100.00. The calculator below adjusts to your exact square footage.

The largest line items are County Transportation Impact Fee (Lake County, Commercial) ($4.20/sq ft) and County Fire Rescue Impact Fee (Lake County, Commercial) ($0.86/sq ft).

Sewer Impact Fee (Town of Lady Lake) — 1 ERU (250 gpd) and Water Impact Fee (Town of Lady Lake) — 1 ERU (250 gpd) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Impact Fee (Town of Lady Lake) — 1 ERU (250 gpd)
    Town of Lady Lake
    UNCONFIRMED AMOUNT. Lady Lake LDC Ch. 14, Sec. 14-11(b) imposes a water impact fee per ERU, but the DOLLAR amount per ERU is set by Town Commission and is not published in the code, the Town fee schedule, or on the Town website. Nonres ERU basis IS published (LDC Ch. 14 Appendix A; 1 ERU = 250 gpd): Commercial Business = 1 ERU per first 2,500 sq ft + 1 per each additional 5,000 sq ft; Office Building = 1 ERU per first 3,000 sq ft + 1 per each additional 3,000 sq ft. Value entered is the 1-ERU minimum. Note: the Villages of Lady Lake portion of town is served by VCCDD Utilities (352) 750-0000, not the Town. Contact Lady Lake Utilities Customer Service (352) 751-1525.
    Requires confirmation
Sewer$0.00
  • Sewer Impact Fee (Town of Lady Lake) — 1 ERU (250 gpd)
    Town of Lady Lake
    UNCONFIRMED AMOUNT. Lady Lake LDC Ch. 14, Sec. 14-11(b) imposes a sewer impact fee per ERU; the $/ERU is set by Town Commission and is not published in the code, the Town fee schedule, or on the Town website. Nonres ERU basis published in LDC Ch. 14 Appendix A (1 ERU = 250 gpd; same table as water). Value entered is the 1-ERU minimum. Villages of Lady Lake portion served by VCCDD Utilities. Contact Utilities Customer Service (352) 751-1525.
    Requires confirmation
City$0.00
  • Municipal Impact Fees (Town of Lady Lake, Commercial) — Residential-Only, None on Nonres
    Town of Lady Lake
    Confirmed $0. Lady Lake Code Ch. 13 contains all three of the Town's impact/supplemental fees and every one is RESIDENTIAL-ONLY: Art. II Supplemental Education Assistance Fee ($1,930/DU) - §13-22(f) expressly exempts 'Nonresidential buildings or structures'; Art. III Library Impact Fee ($391 per residential dwelling unit, Ord. 2008-29) - §13-38(f) expressly exempts nonresidential; Art. IV Park Impact Fee ($2,332 per residential dwelling unit, Ord. 2008-30). No transportation, fire, police or general nonres municipal impact fee exists. (Ch. 13 formerly held a Lake County road impact fee opt-out, repealed by Ord. 92-13.)
    $0.00
County$5.06/sq ft
  • County Transportation Impact Fee (Lake County, Commercial)
    Lake County
    Lake County Commercial Impact Fee Schedule, eff. Jan 2 - Sep 30, 2026. Countywide incl. all cities (Code §22-1(1)). Schedule row: Retail/Shopping (40,000-150,000 SFGLA), per 1,000 SF gross leasable area. Transportation benefit district = CENTRAL (confirmed by point query of the county GIS Transportation Impact Fee Zones layer, MapServer/41); Central & North Central column.
    $4.20/sq ft
  • County Fire Rescue Impact Fee (Lake County, Commercial)
    Lake County
    Lake County Commercial Impact Fee Schedule, eff. Jan 2 - Sep 30, 2026, FIRE column. Column header expressly reads 'All unincorporated areas, including Howey-in-the-Hills and Lady Lake' (Code §22-1(2)) - Lady Lake is one of only two municipalities inside the county fire impact fee area. Schedule row: Retail/Shopping (40,000-150,000 SFGLA), per 1,000 SF.
    $0.86/sq ft
Total (Lady Lake): $5.06/sq ft (≈ $253,100.00 at 50,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:Town of Lady Lake Lake County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lady Lake: Industrial Impact Fees

Industrial development in Lady Lake pays $1.80 per square foot in impact fees (rates sourced July 13, 2026).

For a 50,000 sq ft building, that comes to at least $90,050.00. The calculator below adjusts to your exact square footage.

The largest line items are County Transportation Impact Fee (Lake County, Industrial) ($1.64/sq ft) and County Fire Rescue Impact Fee (Lake County, Industrial) ($0.16/sq ft).

Sewer Impact Fee (Town of Lady Lake) — 1 ERU (250 gpd) and Water Impact Fee (Town of Lady Lake) — 1 ERU (250 gpd) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Impact Fee (Town of Lady Lake) — 1 ERU (250 gpd)
    Town of Lady Lake
    UNCONFIRMED AMOUNT. Lady Lake LDC Ch. 14, Sec. 14-11(b) imposes a water impact fee per ERU, but the DOLLAR amount per ERU is set by Town Commission and is not published in the code, the Town fee schedule, or on the Town website. Nonres ERU basis IS published (LDC Ch. 14 Appendix A; 1 ERU = 250 gpd): Commercial Business = 1 ERU per first 2,500 sq ft + 1 per each additional 5,000 sq ft; Office Building = 1 ERU per first 3,000 sq ft + 1 per each additional 3,000 sq ft. Value entered is the 1-ERU minimum. Note: the Villages of Lady Lake portion of town is served by VCCDD Utilities (352) 750-0000, not the Town. Contact Lady Lake Utilities Customer Service (352) 751-1525.
    Requires confirmation
Sewer$0.00
  • Sewer Impact Fee (Town of Lady Lake) — 1 ERU (250 gpd)
    Town of Lady Lake
    UNCONFIRMED AMOUNT. Lady Lake LDC Ch. 14, Sec. 14-11(b) imposes a sewer impact fee per ERU; the $/ERU is set by Town Commission and is not published in the code, the Town fee schedule, or on the Town website. Nonres ERU basis published in LDC Ch. 14 Appendix A (1 ERU = 250 gpd; same table as water). Value entered is the 1-ERU minimum. Villages of Lady Lake portion served by VCCDD Utilities. Contact Utilities Customer Service (352) 751-1525.
    Requires confirmation
City$0.00
County$1.80/sq ft
Total (Lady Lake): $1.80/sq ft (≈ $90,050.00 at 50,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:Town of Lady Lake Lake County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lady Lake: Office Impact Fees

Office development in Lady Lake pays $3.92 per square foot in impact fees (rates sourced July 13, 2026).

For a 25,000 sq ft building, that comes to at least $97,950.00. The calculator below adjusts to your exact square footage.

The largest line items are County Transportation Impact Fee (Lake County, Office) ($3.60/sq ft) and County Fire Rescue Impact Fee (Lake County, Office) ($0.32/sq ft).

Sewer Impact Fee (Town of Lady Lake) — 1 ERU (250 gpd) and Water Impact Fee (Town of Lady Lake) — 1 ERU (250 gpd) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Impact Fee (Town of Lady Lake) — 1 ERU (250 gpd)
    Town of Lady Lake
    UNCONFIRMED AMOUNT. Lady Lake LDC Ch. 14, Sec. 14-11(b) imposes a water impact fee per ERU, but the DOLLAR amount per ERU is set by Town Commission and is not published in the code, the Town fee schedule, or on the Town website. Nonres ERU basis IS published (LDC Ch. 14 Appendix A; 1 ERU = 250 gpd): Commercial Business = 1 ERU per first 2,500 sq ft + 1 per each additional 5,000 sq ft; Office Building = 1 ERU per first 3,000 sq ft + 1 per each additional 3,000 sq ft. Value entered is the 1-ERU minimum. Note: the Villages of Lady Lake portion of town is served by VCCDD Utilities (352) 750-0000, not the Town. Contact Lady Lake Utilities Customer Service (352) 751-1525.
    Requires confirmation
Sewer$0.00
  • Sewer Impact Fee (Town of Lady Lake) — 1 ERU (250 gpd)
    Town of Lady Lake
    UNCONFIRMED AMOUNT. Lady Lake LDC Ch. 14, Sec. 14-11(b) imposes a sewer impact fee per ERU; the $/ERU is set by Town Commission and is not published in the code, the Town fee schedule, or on the Town website. Nonres ERU basis published in LDC Ch. 14 Appendix A (1 ERU = 250 gpd; same table as water). Value entered is the 1-ERU minimum. Villages of Lady Lake portion served by VCCDD Utilities. Contact Utilities Customer Service (352) 751-1525.
    Requires confirmation
City$0.00
County$3.92/sq ft
Total (Lady Lake): $3.92/sq ft (≈ $97,950.00 at 25,000 sq ft)
Sources last checked July 13, 2026Official fee schedules:Town of Lady Lake Lake County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Lake County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Lady Lake

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Lady Lake, Florida?

A new single-family home in Lady Lake pays at least $16,337.00 per unit in combined impact fees (rates sourced July 13, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Lady Lake?

Commercial development in Lady Lake pays $5.06 per square foot in impact fees, at least $253,100.00 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Lady Lake charge its own impact fees?

Yes. Lady Lake levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Lady Lake, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Lake County impact fees page.