Volusia County impact fees by project type
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Unincorporated Volusia County: Single-Family Impact Fees
A new single-family home in unincorporated Volusia County pays $19,781.04 per unit in impact fees (rates sourced August 15, 2026). All of it is levied by Volusia County.
The largest line items are County School Impact Fee (Volusia County) ($7,022.70), County Thoroughfare Road Impact Fee (Volusia County) ($5,464.00) and Sewer Connection Fee (Volusia County - Unincorporated) ($3,850.84).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Volusia County impact fee schedule
- Water Connection Fee (Volusia County - Unincorporated)$1,748.72Volusia County Water & Sewer UtilitiesAMOUNT CORRECTED 8/4/2026: the 2022-schedule staleness is RESOLVED — the county posts annual schedules (found 01/01/26): West Volusia/unincorporated unsoftened water $1,748.72 ($2,026.77 softened: Halifax Plantation, SE Service Area, Spruce Creek Fly-In). Was $1,417.82 (2022). ⚠️ Re-check each January.
- Sewer Connection Fee (Volusia County - Unincorporated)$3,850.84Volusia County Water & Sewer UtilitiesAMOUNT CORRECTED 8/4/2026 (01/01/26 schedule): sewer all areas $3,850.84 (was $3,122.17 from 2022). ⚠️ Re-check each January.
- City Impact Fees (Volusia County - Unincorporated)$0.00Unincorporated Volusia has NO municipal (city) impact fees — development in the unincorporated area pays Volusia County impact fees (transportation, school, fire, EMS, local park) recorded separately as County-type records. Confirmed $0 city fee; placeholder documents that city-level fees were checked and do not apply.
- County School Impact Fee (Volusia County)$7,022.70Volusia County2026 Residential schedule, eff. 6/3/2026. $7,022.70 flat per SFD unit, all sizes. Countywide.
- County Thoroughfare Road Impact Fee (Volusia County)$5,464.00SF Detached, 1,701-2,200 sq ftVolusia County2026 Volusia Residential Impact Fee Schedule, eff. 6/3/2026. County Thoroughfare Road Impact Fee (Volusia County) tiered by SFD heated floor area; this record = SF Detached, 1,701-2,200 sq ft. Applies countywide (unincorporated + every city). Source: volusia.org 2026-Residential schedule.
- County Cultural/Rec District Park Impact Fee (Volusia County)$644.00SF Detached, 1,701-2,200 sq ftVolusia County2026 Volusia Residential Impact Fee Schedule, eff. 6/3/2026. County Cultural/Rec District Park Impact Fee (Volusia County) tiered by SFD heated floor area; this record = SF Detached, 1,701-2,200 sq ft. Applies countywide (unincorporated + every city). Source: volusia.org 2026-Residential schedule.
- County Fire Impact Fee (Volusia County)$596.81SF Detached, 1,701-2,200 sq ftVolusia County2026 Volusia Residential Impact Fee Schedule, eff. 6/3/2026. County Fire Impact Fee (Volusia County) tiered by SFD heated floor area; this record = SF Detached, 1,701-2,200 sq ft. Applies in the unincorporated area and the cities of Lake Helen, Pierson, and Oak Hill only. Source: volusia.org 2026-Residential schedule.
- County Cultural/Rec Local Park Impact Fee (Volusia County)$384.00SF Detached, 1,701-2,200 sq ftVolusia County2026 Volusia Residential Impact Fee Schedule, eff. 6/3/2026. County Cultural/Rec Local Park Impact Fee (Volusia County) tiered by SFD heated floor area; this record = SF Detached, 1,701-2,200 sq ft. Applies in the unincorporated area only. Source: volusia.org 2026-Residential schedule.
- County EMS Impact Fee (Volusia County)$69.97SF Detached, 1,701-2,200 sq ftVolusia County2026 Volusia Residential Impact Fee Schedule, eff. 6/3/2026. County EMS Impact Fee (Volusia County) tiered by SFD heated floor area; this record = SF Detached, 1,701-2,200 sq ft. Applies countywide (unincorporated + every city). Source: volusia.org 2026-Residential schedule.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Unincorporated Volusia County: Multifamily Impact Fees
A new multifamily unit in unincorporated Volusia County pays $13,203.52 per unit in impact fees (rates sourced August 15, 2026). All of it is levied by Volusia County.
The largest line items are Sewer Connection Fee (Volusia County - Unincorporated) ($3,850.84), County School Impact Fee (Volusia County) ($3,728.95) and County Thoroughfare Road Impact Fee (Volusia County) ($2,489.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Volusia County impact fee schedule
- Water Connection Fee (Volusia County - Unincorporated)$1,748.72Volusia County Water & Sewer UtilitiesAmount = 1/1/2026 Volusia County Utilities schedule: West Volusia unsoftened water $1,748.72 per connection (softened service areas $2,026.77). Per-connection basis — individually-metered MF units pay per connection; master-meter case priced by the county. County re-posts a schedule each January.
- Sewer Connection Fee (Volusia County - Unincorporated)$3,850.84Volusia County Water & Sewer UtilitiesAmount = 1/1/2026 Volusia County Utilities schedule: sewer $3,850.84 per connection (was $3,122.17 in 2022). Per-connection basis. County re-posts a schedule each January.
- City Impact Fees (Volusia County - Unincorporated)$0.00Unincorporated Volusia has NO municipal (city) impact fees — development pays Volusia County impact fees (transportation, school, fire, EMS, local park) recorded separately as County-type records. Confirmed $0 city fee; placeholder documents that city-level fees were checked and do not apply.
- County School Impact Fee (Volusia County)$3,728.95High-RiseVolusia County2026 Residential schedule, eff. 6/3/2026. School $3,728.95/unit flat across Duplex/Low-Rise/High-Rise (Mobile Home/RV Park $1,415.25 not modeled). Building-type tiers kept parallel to Road per schedule columns. Countywide.
- County Thoroughfare Road Impact Fee (Volusia County)$2,489.00High-RiseVolusia County2026 Residential schedule, eff. 6/3/2026. MF Road by building type: Duplex $4,733; Low-Rise (≤3 stories) $3,700; High-Rise (4+ stories) $2,489. This = High-Rise. Mobile Home/RV Park $1,903 not modeled. Countywide.
- County District/Coastal Park Impact Fee$527.001,200 sq ft or lessVolusia County2026 Residential schedule, eff. 6/3/2026. County District/Coastal Park Impact Fee: MF charged per unit using the SFD heated-area tier table; this record = 1,200 sq ft or less. Applies countywide (unincorporated + every city).
- County Fire Impact Fee$485.601,200 sq ft or lessVolusia County2026 Residential schedule, eff. 6/3/2026. County Fire Impact Fee: MF charged per unit using the SFD heated-area tier table; this record = 1,200 sq ft or less. Applies in the unincorporated area and the cities of Lake Helen, Pierson, and Oak Hill only.
- County Local Park Impact Fee$316.001,200 sq ft or lessVolusia County2026 Residential schedule, eff. 6/3/2026. County Local Park Impact Fee: MF charged per unit using the SFD heated-area tier table; this record = 1,200 sq ft or less. Applies in the unincorporated area only.
- County EMS Impact Fee$57.411,200 sq ft or lessVolusia County2026 Residential schedule, eff. 6/3/2026. County EMS Impact Fee: MF charged per unit using the SFD heated-area tier table; this record = 1,200 sq ft or less. Applies countywide (unincorporated + every city).
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Volusia County: Commercial Impact Fees
Commercial development in unincorporated Volusia County pays $7.53 per square foot in impact fees, plus $5,877.61 in one-time water and sewer connection fees (rates sourced August 15, 2026).
For a 50,000 sq ft building, that comes to about $382,377.61. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Development Fee (Volusia County Utilities) — 1 ERU ($3,850.84 one-time), Water Development Fee (Volusia County Utilities) — 1 ERU (Softened/East) ($2,026.77 one-time) and County Thoroughfare Road Impact Fee (Volusia County - Unincorporated, Commercial) ($6.32/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full Volusia County impact fee schedule
- Water Development Fee (Volusia County Utilities) — 1 ERU (Softened/East)$2,026.77 one-timeVCU Water & Sanitary Sewer Development Fee Schedule, eff. 1/1/2026 (Code Ch.122 Art.II; CPI+1% each Jan 1). Softened/East systems (Halifax Plantation, Southeast, Spruce Creek Fly-In) = $2,026.77/ERU. Basis: 300 gpd/ERU water; 1-ERU nonres minimum; scaled by design-flow gpd, no meter multiplier. District-split + slugged on audit 2026-08-15 (sibling = Unsoftened/West $1,748.72, recaV4mFpcYvV2LTt); default sits on highest-rate district per rule.
- Sewer Development Fee (Volusia County Utilities) — 1 ERU$3,850.84 one-timeVolusia County UtilitiesVCU schedule eff. 1/1/2026 (Code Ch. 122 Art. II; CPI+1% each Jan 1). Per ERU = CIAC $1,638.15 + Connection $2,212.69 = $3,850.84 (single rate both softened/unsoftened). Basis: 284 gpd/ERU sewer; 1 ERU nonres minimum; nonres scaled by design-flow gpd (× BOD ratio for high-strength), no meter multiplier.
- City Impact Fee (Volusia County - Unincorporated, Commercial)$0.00Volusia CountyUnincorporated area — no municipality, so no City-level impact fee. Placeholder $0. County overlay carries the applicable fees.
- County Thoroughfare Road Impact Fee (Volusia County - Unincorporated, Commercial)$6.32/sq ftVolusia CountyVolusia County full overlay in unincorporated area: Road + EMS + Fire all apply (2023 Commercial Impact Fee Schedule; Municode Ch. 70).
- County Fire Impact Fee (Volusia County - Unincorporated, Commercial)$1.09/sq ftVolusia CountyVolusia County Fire Rescue overlay; applies in unincorporated area (+ Lake Helen, Oak Hill, Pierson).
- County EMS Impact Fee (Volusia County - Unincorporated, Commercial)$0.12/sq ftVolusia CountyVolusia County EMS overlay; unincorporated.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Volusia County: Industrial Impact Fees
Industrial development in unincorporated Volusia County pays $2.65 per square foot in impact fees, plus $5,877.61 in one-time water and sewer connection fees (rates sourced August 15, 2026).
For a 50,000 sq ft building, that comes to about $138,377.61. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Development Fee (Volusia County Utilities) — 1 ERU ($3,850.84 one-time), Water Development Fee (Volusia County Utilities) — 1 ERU (Softened/East) ($2,026.77 one-time) and County Thoroughfare Road Impact Fee (Volusia County - Unincorporated, Industrial) ($2.42/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full Volusia County impact fee schedule
- Water Development Fee (Volusia County Utilities) — 1 ERU (Softened/East)$2,026.77 one-timeVCU Water & Sanitary Sewer Development Fee Schedule, eff. 1/1/2026 (Code Ch.122 Art.II; CPI+1% each Jan 1). Softened/East systems (Halifax Plantation, Southeast, Spruce Creek Fly-In) = $2,026.77/ERU. Basis: 300 gpd/ERU water; 1-ERU nonres minimum; scaled by design-flow gpd, no meter multiplier. District-split + slugged on audit 2026-08-15 (sibling = Unsoftened/West $1,748.72, recaV4mFpcYvV2LTt); default sits on highest-rate district per rule.
- Sewer Development Fee (Volusia County Utilities) — 1 ERU$3,850.84 one-timeVolusia County UtilitiesVCU schedule eff. 1/1/2026 (Code Ch. 122 Art. II; CPI+1% each Jan 1). Per ERU = CIAC $1,638.15 + Connection $2,212.69 = $3,850.84 (single rate both softened/unsoftened). Basis: 284 gpd/ERU sewer; 1 ERU nonres minimum; nonres scaled by design-flow gpd (× BOD ratio for high-strength), no meter multiplier.
- City Impact Fee (Volusia County - Unincorporated, Industrial)$0.00Volusia CountyUnincorporated area — no municipality. Placeholder $0.
- County Thoroughfare Road Impact Fee (Volusia County - Unincorporated, Industrial)$2.42/sq ftVolusia CountyVolusia County overlay; unincorporated.
- County Fire Impact Fee (Volusia County - Unincorporated, Industrial)$0.21/sq ftVolusia CountyVolusia County Fire Rescue overlay; unincorporated.
- County EMS Impact Fee (Volusia County - Unincorporated, Industrial)$0.02/sq ftVolusia CountyVolusia County EMS overlay; unincorporated.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Volusia County: Office Impact Fees
Office development in unincorporated Volusia County pays $5.85 per square foot in impact fees, plus $5,877.61 in one-time water and sewer connection fees (rates sourced August 15, 2026).
For a 25,000 sq ft building, that comes to about $152,127.61. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Development Fee (Volusia County Utilities) — 1 ERU ($3,850.84 one-time), Water Development Fee (Volusia County Utilities) — 1 ERU (Softened/East) ($2,026.77 one-time) and County Thoroughfare Road Impact Fee (Volusia County - Unincorporated, Office) ($5.40/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full Volusia County impact fee schedule
- Water Development Fee (Volusia County Utilities) — 1 ERU (Softened/East)$2,026.77 one-timeVCU Water & Sanitary Sewer Development Fee Schedule, eff. 1/1/2026 (Code Ch.122 Art.II; CPI+1% each Jan 1). Softened/East systems (Halifax Plantation, Southeast, Spruce Creek Fly-In) = $2,026.77/ERU. Basis: 300 gpd/ERU water; 1-ERU nonres minimum; scaled by design-flow gpd, no meter multiplier. District-split + slugged on audit 2026-08-15 (sibling = Unsoftened/West $1,748.72, recaV4mFpcYvV2LTt); default sits on highest-rate district per rule.
- Sewer Development Fee (Volusia County Utilities) — 1 ERU$3,850.84 one-timeVolusia County UtilitiesVCU schedule eff. 1/1/2026 (Code Ch. 122 Art. II; CPI+1% each Jan 1). Per ERU = CIAC $1,638.15 + Connection $2,212.69 = $3,850.84 (single rate both softened/unsoftened). Basis: 284 gpd/ERU sewer; 1 ERU nonres minimum; nonres scaled by design-flow gpd (× BOD ratio for high-strength), no meter multiplier.
- City Impact Fee (Volusia County - Unincorporated, Office)$0.00Volusia CountyUnincorporated area — no municipality. Placeholder $0.
- County Thoroughfare Road Impact Fee (Volusia County - Unincorporated, Office)$5.40/sq ftVolusia CountyVolusia County overlay; unincorporated.
- County Fire Impact Fee (Volusia County - Unincorporated, Office)$0.41/sq ftVolusia CountyVolusia County Fire Rescue overlay; unincorporated.
- County EMS Impact Fee (Volusia County - Unincorporated, Office)$0.04/sq ftVolusia CountyVolusia County EMS overlay; unincorporated.
Volusia County impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
Recent changes
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Volusia County impact fee FAQs
What are single-family impact fees in Volusia County, Florida?
A new single-family home in unincorporated Volusia County pays $19,781.04 per unit in impact fees (rates sourced August 15, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.
How much are multifamily impact fees in Volusia County?
Multifamily development in unincorporated Volusia County pays $13,203.52 per unit in impact fees (rates sourced August 15, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.
How much are commercial impact fees in Volusia County?
Commercial development in unincorporated Volusia County pays $7.53 per square foot in impact fees, plus $5,877.61 in one-time water and sewer connection fees (assuming a 1-inch meter), about $382,377.61 for a 50,000 sq ft building.
Do cities in Volusia County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 14 of 16 cities in Volusia County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.