Pierson, Florida Impact Fees

Pierson applies its own fee schedule: municipal fees plus the Volusia County-levied fees that apply inside city limits. Combined, a new single-family home pays $14,017.48 per unit (rates sourced July 18, 2026). The full breakdown is below.

Pierson impact fees by project type

Pierson: Single-Family Impact Fees

A new single-family home in Pierson pays $14,017.48 per unit in impact fees (rates sourced July 18, 2026). Of that, Volusia County-levied fees account for $13,797.48 and municipal or utility fees for $220.00.

The largest line items are County School Impact Fee (Volusia County) ($7,022.70), County Thoroughfare Road Impact Fee (Volusia County) ($5,464.00) and County Cultural/Rec District Park Impact Fee (Volusia County) ($644.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$220.00
  • Water Connection Fee (Pierson)
    Town of Pierson
    CONFIRMED (7/14/2026 audit). Town of Pierson municipal water. Water hook-up (tap) fee, 3/4" meter (standard SFR) = $220.00, plus $19.75 backflow valve (Town Residential Customers fee schedule; Code Ch. 14 Art. III, rates by Council resolution). Road bore/jack extra if required. Deposits ($75 owner/$125 tenant) separate. Per-meter basis (no ERU capacity fee).
    $220.00
Sewer$0.00
  • Sewer Connection Fee (Pierson)
    None (septic)
    $0 CONFIRMED (7/14/2026 audit). Pierson has NO sewer/wastewater chapter and provides no centralized sewer — properties are on septic (Volusia County Health permitting). Confirmed: no municipal sewer fee exists.
    $0.00
City$0.00
  • City Impact Fee (Pierson)
    Town of Pierson
    $0 CONFIRMED (7/14/2026 audit). Town of Pierson Code (Ch. 1-21) has NO impact-fee chapter; the only utility chapter is Ch. 14 Municipal Water. New development pays Volusia County countywide fees only. Supersedes the incomplete county FAQ.
    $0.00
County$13,797.48
Total (Pierson): $14,017.48
Sources last checked July 18, 2026Official fee schedules:Town of Pierson Volusia County

Pierson: Multifamily Impact Fees

A new multifamily unit in Pierson pays at least $7,287.96 per unit in impact fees (rates sourced July 18, 2026). All of it is levied by Volusia County.

The largest line items are County School Impact Fee (Volusia County) ($3,728.95), County Thoroughfare Road Impact Fee (Volusia County) ($2,489.00) and County District/Coastal Park Impact Fee ($527.00).

Water Connection Fee (Pierson, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Pierson, MF)
    Town of Pierson
    Provider + basis CONFIRMED, MF per-unit amount UNCONFIRMED (7/14/2026 audit). Town of Pierson municipal water; hook-up is per-meter ($220 at 3/4", + $19.75 backflow), NOT per unit. A small MF with individual 3/4" meters pays $220/meter; master-metered MF priced by meter size (Commercial schedule). No published per-unit ERU capacity fee. See SFR record. Contact 386-749-2661.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Pierson, MF)
    None (septic)
    $0 CONFIRMED (7/14/2026 audit). Pierson has NO sewer/wastewater chapter and provides no centralized sewer — properties on septic. Confirmed: no municipal sewer fee exists.
    $0.00
City$0.00
  • City Impact Fee (Pierson)
    Town of Pierson
    $0 CONFIRMED (7/14/2026 audit). Town of Pierson Code (Ch. 1-21) has NO impact-fee chapter; only utility chapter is Ch. 14 Municipal Water. Supersedes the incomplete county FAQ.
    $0.00
County$7,287.96
Total (Pierson): $7,287.96
Sources last checked July 18, 2026Official fee schedules:Town of Pierson Volusia County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Volusia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pierson: Commercial Impact Fees

Commercial development in Pierson pays $7.53 per square foot in impact fees, plus $220.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $376,720.00. The calculator below adjusts to your exact square footage.

The largest line items are County Thoroughfare Road Impact Fee (Pierson, Commercial) ($6.32/sq ft), County Fire Impact Fee (Pierson, Commercial) ($1.09/sq ft) and County EMS Impact Fee (Pierson, Commercial) ($0.12/sq ft).

Water Hook-up Fee (Town of Pierson) — 3/4" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$220.00 one-time
  • Water Hook-up Fee (Town of Pierson) — 3/4" meter
    Town of Pierson
    Town's own water utility. Commercial fee schedule publishes ONLY a 3/4" hook-up fee ($220 in-town; $220 outside) + $220 deposit; NO capacity/impact fee and no 1"+ meter ladder (bore/jack + larger meters quoted 'TBD', set administratively). Only published tier entered. Call Utilities (386) 749-2661 for 1"+ quote.
    $220.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Pierson)
    Town of Pierson
    No central sewer — town has no wastewater system; development uses on-site septic (Volusia County FL DOH permits). Sewer $0 confirmed.
    $0.00
City$0.00
  • City Impact Fee (Pierson, Commercial)
    Town of Pierson
    No municipal nonres impact fee. Town directs ALL impact fees (Transp/Educ/Parks/EMS/Fire) to Volusia County; only permit/inspection fees levied. Confirmed $0.
    $0.00
County$7.53/sq ft
Total (Pierson): $7.53/sq ft + $220.00 one-time (≈ $376,720.00 at 50,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:Town of Pierson Volusia County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Volusia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pierson: Industrial Impact Fees

Industrial development in Pierson pays $2.65 per square foot in impact fees, plus $220.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $132,720.00. The calculator below adjusts to your exact square footage.

The largest line items are County Thoroughfare Road Impact Fee (Pierson, Industrial) ($2.42/sq ft), County Fire Impact Fee (Pierson, Industrial) ($0.21/sq ft) and County EMS Impact Fee (Pierson, Industrial) ($0.02/sq ft).

Water Hook-up Fee (Town of Pierson) — 3/4" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$220.00 one-time
  • Water Hook-up Fee (Town of Pierson) — 3/4" meter
    Town of Pierson
    Town's own water utility. Commercial fee schedule publishes ONLY a 3/4" hook-up fee ($220 in-town; $220 outside) + $220 deposit; NO capacity/impact fee and no 1"+ meter ladder (bore/jack + larger meters quoted 'TBD', set administratively). Only published tier entered. Call Utilities (386) 749-2661 for 1"+ quote.
    $220.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Pierson)
    Town of Pierson
    No central sewer — town has no wastewater system; development uses on-site septic (Volusia County FL DOH permits). Sewer $0 confirmed.
    $0.00
City$0.00
County$2.65/sq ft
Total (Pierson): $2.65/sq ft + $220.00 one-time (≈ $132,720.00 at 50,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:Town of Pierson Volusia County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Volusia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pierson: Office Impact Fees

Office development in Pierson pays $5.85 per square foot in impact fees, plus $220.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 25,000 sq ft building, that comes to about $146,470.00. The calculator below adjusts to your exact square footage.

The largest line items are County Thoroughfare Road Impact Fee (Pierson, Office) ($5.40/sq ft), County Fire Impact Fee (Pierson, Office) ($0.41/sq ft) and County EMS Impact Fee (Pierson, Office) ($0.04/sq ft).

Water Hook-up Fee (Town of Pierson) — 3/4" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$220.00 one-time
  • Water Hook-up Fee (Town of Pierson) — 3/4" meter
    Town of Pierson
    Town's own water utility. Commercial fee schedule publishes ONLY a 3/4" hook-up fee ($220 in-town; $220 outside) + $220 deposit; NO capacity/impact fee and no 1"+ meter ladder (bore/jack + larger meters quoted 'TBD', set administratively). Only published tier entered. Call Utilities (386) 749-2661 for 1"+ quote.
    $220.00 one-timeRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Pierson)
    Town of Pierson
    No central sewer — town has no wastewater system; development uses on-site septic (Volusia County FL DOH permits). Sewer $0 confirmed.
    $0.00
City$0.00
County$5.85/sq ft
Total (Pierson): $5.85/sq ft + $220.00 one-time (≈ $146,470.00 at 25,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:Town of Pierson Volusia County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Volusia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Pierson

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Pierson, Florida?

A new single-family home in Pierson pays $14,017.48 per unit in combined impact fees (rates sourced July 18, 2026).

How much are commercial impact fees in Pierson?

Commercial development in Pierson pays $7.53 per square foot in impact fees, plus $220.00 in one-time water and sewer connection fees, about $376,720.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Pierson charge its own impact fees?

Yes. Pierson levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Pierson, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Volusia County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000