Ormond Beach Impact Fees by Project Type
Ormond Beach: Single-Family Impact Fees
A new single-family home in Ormond Beach pays $20,432.91 per unit in impact fees (rates sourced July 18, 2026). Of that, Volusia County-levied fees account for $13,200.67 and municipal or utility fees for $7,232.24.
The largest line items are County School Impact Fee (Volusia County) ($7,022.70), County Thoroughfare Road Impact Fee (Volusia County) ($5,464.00) and Water Connection Fee (Ormond Beach) ($2,855.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Ormond Beach Impact Fee Schedule
- Water Connection Fee (Ormond Beach)$2,855.00City of Ormond Beach
- Sewer Connection Fee (Ormond Beach)$2,783.00City of Ormond Beach
- City Parks Impact Fee (Ormond Beach)$1,312.24City of Ormond BeachCity of Ormond Beach Parks Impact Fee — $1,312.24 per single-family home.
- City Local Road Impact Fee (Ormond Beach)$162.61City of Ormond BeachCity of Ormond Beach Local Road Impact Fee — $162.61 per single-family home.
- City Stormwater Impact Fee (Ormond Beach)$119.39City of Ormond BeachCity of Ormond Beach Stormwater Impact Fee — $119.39 per single-family home.
- County School Impact Fee (Volusia County)$7,022.70Volusia CountyVolusia County School impact fee — 2026 Residential schedule, effective June 3, 2026. $7,022.70 per single-family unit, flat across all home sizes. Applies countywide.
- County Thoroughfare Road Impact Fee (Volusia County)$5,464.00SF Detached, 1,701-2,200 sq ftVolusia CountyVolusia County Thoroughfare (Transportation) Road impact fee — 2026 Residential schedule, effective June 3, 2026. Detached single-family, tiered by heated floor area: ≤1,200 sq ft $4,864; 1,201–1,700 $5,097; 1,701–2,200 $5,464; 2,201–3,000 $5,835; over 3,000 $6,215. Amount shown is the 1,701–2,200 sq ft tier. Applies countywide (unincorporated + every city).
- County Cultural/Rec District Park Impact Fee (Volusia County)$644.00SF Detached, 1,701-2,200 sq ftVolusia CountyVolusia County Cultural/Recreational District/Coastal Park impact fee — 2026 Residential schedule, effective June 3, 2026. Detached single-family, tiered by heated floor area: ≤1,200 sq ft $527; 1,201–1,700 $606; 1,701–2,200 $644; 2,201–3,000 $675; over 3,000 $742. Amount shown is the 1,701–2,200 sq ft tier. Applies countywide (unincorporated + every city).
- County EMS Impact Fee (Volusia County)$69.97SF Detached, 1,701-2,200 sq ftVolusia CountyVolusia County EMS impact fee — 2026 Residential schedule, effective June 3, 2026. Detached single-family, tiered by heated floor area: ≤1,200 sq ft $57.41; 1,201–1,700 $65.93; 1,701–2,200 $69.97; 2,201–3,000 $73.55; over 3,000 $80.73. Amount shown is the 1,701–2,200 sq ft tier. Applies countywide (unincorporated + every city).
Where in Volusia County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours.
Ormond Beach: Multifamily Impact Fees
A new multifamily unit in Ormond Beach pays $10,870.56 per unit in impact fees (rates sourced July 18, 2026). Of that, Volusia County-levied fees account for $6,802.36 and municipal or utility fees for $4,068.20.
The largest line items are County School Impact Fee (Volusia County) ($3,728.95), County Thoroughfare Road Impact Fee (Volusia County) ($2,489.00) and Water Connection Fee (Ormond Beach) ($1,427.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Ormond Beach Impact Fee Schedule
- Water Connection Fee (Ormond Beach)$1,427.00City of Ormond Beach
- Sewer Connection Fee (Ormond Beach)$1,391.50City of Ormond Beach
- City Parks Impact Fee (Ormond Beach)$1,048.42City of Ormond BeachCity of Ormond Beach Parks Impact Fee — $1,048.42 per dwelling unit.
- City Local Road Impact Fee (Ormond Beach)$162.61City of Ormond Beach Local Road Impact Fee — $162.61 per dwelling unit.
- City Stormwater Impact Fee (Ormond Beach)$38.67City of Ormond BeachCity of Ormond Beach Stormwater Impact Fee — $38.67 per dwelling unit.
- County School Impact Fee (Volusia County)$3,728.95High-RiseVolusia CountyVolusia County School impact fee, multifamily — 2026 Residential schedule, effective June 3, 2026. $3,728.95 per unit, flat across duplex, low-rise and high-rise. Applies countywide.
- County Thoroughfare Road Impact Fee (Volusia County)$2,489.00High-RiseVolusia CountyVolusia County Thoroughfare (Transportation) Road impact fee, multifamily — 2026 Residential schedule, effective June 3, 2026. Per unit by building type: duplex $4,733; low-rise (3 stories or less) $3,700; high-rise (4+ stories) $2,489. Amount shown is high-rise (the canonical 4-story unit). Mobile home/RV park $1,903 not modeled. Applies countywide.
- County District/Coastal Park Impact Fee$527.001,200 sq ft or lessVolusia CountyVolusia County Cultural/Recreational District/Coastal Park impact fee, multifamily — 2026 Residential schedule, effective June 3, 2026. Charged per unit by heated floor area using the residential tier table; amount shown is the ≤1,200 sq ft tier (canonical ~1,000 sq ft unit), rising with unit size. Applies countywide (unincorporated + every city).
- County EMS Impact Fee$57.411,200 sq ft or lessVolusia CountyVolusia County EMS impact fee, multifamily — 2026 Residential schedule, effective June 3, 2026. Charged per unit by heated floor area using the residential tier table; amount shown is the ≤1,200 sq ft tier (canonical ~1,000 sq ft unit), rising with unit size. Applies countywide (unincorporated + every city).
Where in Volusia County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours.
Ormond Beach: Commercial Impact Fees
Commercial development in Ormond Beach pays $12.77 per square foot in impact fees, plus $5,910.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $644,264.50. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (City of Ormond Beach) — 1 ELU min ($3,577.00 one-time), Water Connection Fee (City of Ormond Beach) — 1 ELU min ($2,333.00 one-time) and County Thoroughfare Road Impact Fee (Ormond Beach, Commercial) ($6.32/sq ft).
Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.
View the Full Ormond Beach Impact Fee Schedule
- Water Connection Fee (City of Ormond Beach) — 1 ELU min$2,333.00 one-timeCity of Ormond BeachPer-ELU fee (1 ELU = 60 plumbing fixture units); 1-ELU minimum. Effective September 4, 2023.
- Sewer Connection Fee (City of Ormond Beach) — 1 ELU min$3,577.00 one-timeCity of Ormond BeachPer-ELU fee (1 ELU = 60 plumbing fixture units); 1-ELU minimum. Effective September 4, 2023.
- City Local Roads Impact Fee (Ormond Beach, Commercial)$5.56/sq ftGeneral Commercial 40,000–150,000 SFCity of Ormond BeachRate applies to general commercial 40,000–150,000 sf; other commercial sizes pay different rates. Properties in designated TCEA areas pay a trip-based mobility fee instead. Effective September 4, 2023. Per 1,000 sf of gross floor area.
- City Fire Impact Fee (Ormond Beach, Commercial)$0.43/sq ftCity of Ormond Beach
- City Police Impact Fee (Ormond Beach, Commercial)$0.34/sq ftCity of Ormond Beach
- $6.32/sq ft
- County EMS Impact Fee (Ormond Beach, Commercial)$0.12/sq ftVolusia County
Where in Volusia County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ormond Beach: Industrial Impact Fees
Industrial development in Ormond Beach pays $2.92 per square foot in impact fees, plus $5,910.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $152,121.50. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (City of Ormond Beach) — 1 ELU min ($3,577.00 one-time), Water Connection Fee (City of Ormond Beach) — 1 ELU min ($2,333.00 one-time) and County Thoroughfare Road Impact Fee (Ormond Beach, Industrial) ($2.42/sq ft).
View the Full Ormond Beach Impact Fee Schedule
- Water Connection Fee (City of Ormond Beach) — 1 ELU min$2,333.00 one-timeCity of Ormond BeachPer-ELU fee (1 ELU = 60 plumbing fixture units); 1-ELU minimum. Effective September 4, 2023.
- Sewer Connection Fee (City of Ormond Beach) — 1 ELU min$3,577.00 one-timeCity of Ormond BeachPer-ELU fee (1 ELU = 60 plumbing fixture units); 1-ELU minimum. Effective September 4, 2023.
- City Local Roads Impact Fee (Ormond Beach, Industrial)$0.45/sq ftCity of Ormond Beach
- City Fire Impact Fee (Ormond Beach, Industrial)$0.02/sq ftCity of Ormond Beach
- City Police Impact Fee (Ormond Beach, Industrial)$0.01/sq ftCity of Ormond Beach
- $2.42/sq ft
- County EMS Impact Fee (Ormond Beach, Industrial)$0.02/sq ftVolusia County
Where in Volusia County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ormond Beach: Office Impact Fees
Office development in Ormond Beach pays $7.59 per square foot in impact fees, plus $5,910.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 25,000 sq ft building, that comes to about $195,542.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (City of Ormond Beach) — 1 ELU min ($3,577.00 one-time), Water Connection Fee (City of Ormond Beach) — 1 ELU min ($2,333.00 one-time) and County Thoroughfare Road Impact Fee (Ormond Beach, Office) ($5.40/sq ft).
View the Full Ormond Beach Impact Fee Schedule
- Water Connection Fee (City of Ormond Beach) — 1 ELU min$2,333.00 one-timeCity of Ormond BeachPer-ELU fee (1 ELU = 60 plumbing fixture units); 1-ELU minimum. Effective September 4, 2023.
- Sewer Connection Fee (City of Ormond Beach) — 1 ELU min$3,577.00 one-timeCity of Ormond BeachPer-ELU fee (1 ELU = 60 plumbing fixture units); 1-ELU minimum. Effective September 4, 2023.
- City Local Roads Impact Fee (Ormond Beach, Office)$1.71/sq ftCity of Ormond Beach
- City Fire Impact Fee (Ormond Beach, Office)$0.24/sq ftCity of Ormond Beach
- City Police Impact Fee (Ormond Beach, Office)$0.19/sq ftCity of Ormond Beach
- $5.40/sq ft
- County EMS Impact Fee (Ormond Beach, Office)$0.04/sq ftVolusia County
Where in Volusia County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ormond Beach Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Ormond Beach Impact Fee FAQs
What are the total impact fees for a single-family home in Ormond Beach, Florida?
A new single-family home in Ormond Beach pays $20,432.91 per unit in combined impact fees (rates sourced July 18, 2026).
How much are commercial impact fees in Ormond Beach?
Commercial development in Ormond Beach pays $12.77 per square foot in impact fees, plus $5,910.00 in one-time water and sewer connection fees, about $644,264.50 for a 50,000 sq ft building.
Does Ormond Beach charge its own impact fees?
Yes. Ormond Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Ormond Beach, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Volusia County impact fees page.