Ormond Beach impact fees by project type
Ormond Beach: Single-Family Impact Fees
A new single-family home in Ormond Beach pays $20,432.91 per unit in impact fees (rates sourced July 18, 2026). Of that, Volusia County-levied fees account for $13,200.67 and municipal or utility fees for $7,232.24.
The largest line items are County School Impact Fee (Volusia County) ($7,022.70), County Thoroughfare Road Impact Fee (Volusia County) ($5,464.00) and Water Connection Fee (Ormond Beach) ($2,855.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- $2,855.00
- $2,783.00
- $1,312.24
- $162.61
- $119.39
- County School Impact Fee (Volusia County)$7,022.70Volusia County2026 schedule, eff. 6/3/2026. $7,022.70 flat for all SFR tiers. All jurisdictions.
- County Thoroughfare Road Impact Fee (Volusia County)$5,464.00SF Detached, 1,701-2,200 sq ftVolusia County2026 schedule, eff. 6/3/2026. SFR tiered: ≤1,200=$4,864; 1,201-1,700=$5,097; 1,701-2,200=$5,464; 2,201-3,000=$5,835; >3,000=$6,215. Amount=1,701-2,200 tier.
- County Cultural/Rec District Park Impact Fee (Volusia County)$644.00SF Detached, 1,701-2,200 sq ftVolusia County2026 schedule, eff. 6/3/2026. All jurisdictions.
- County EMS Impact Fee (Volusia County)$69.97SF Detached, 1,701-2,200 sq ftVolusia County2026 schedule, eff. 6/3/2026. All jurisdictions.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ormond Beach: Multifamily Impact Fees
A new multifamily unit in Ormond Beach pays $10,870.56 per unit in impact fees (rates sourced July 18, 2026). Of that, Volusia County-levied fees account for $6,802.36 and municipal or utility fees for $4,068.20.
The largest line items are County School Impact Fee (Volusia County) ($3,728.95), County Thoroughfare Road Impact Fee (Volusia County) ($2,489.00) and Water Connection Fee (Ormond Beach) ($1,427.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- $1,427.00
- $1,391.50
- $1,048.42
- City Local Road Impact Fee (Ormond Beach)$162.61Ormond Beach Schedule of Impact Fees (City Impact Fee Schedule, eff. 1/1/2020), p.2 Local Road table. Fee is per unit and NOT tiered by construction type — MF = $162.61/unit, identical to SFR (and to mobile/manufactured). Confirmed 7/15/2026 from the schedule PDF. Note: development within a Transportation Concurrency Exception Area (TCEA) pays a trip-based mobility fee instead of the Local Road fee.
- $38.67
- County School Impact Fee (Volusia County)$3,728.95High-RiseVolusia County2026 schedule, eff. 6/3/2026. 3+ stories.
- County Thoroughfare Road Impact Fee (Volusia County)$2,489.00High-RiseVolusia County2026 schedule, eff. 6/3/2026. 3+ stories.
- County District/Coastal Park Impact Fee$527.00Per SFD tiered rate, 1,200 sq ft or lessVolusia County** per tiered rate — use SFR tiered rate based on unit SF. Amount shown is ≤1,200 SF tier. Eff. 6/3/2026.
- County EMS Impact Fee$57.41Per SFD tiered rate, 1,200 sq ft or lessVolusia County** per tiered rate — use SFR tiered rate based on unit SF. Amount shown is ≤1,200 SF tier. Eff. 6/3/2026.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ormond Beach: Commercial Impact Fees
Commercial development in Ormond Beach pays $12.77 per square foot in impact fees, plus $5,910.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $644,264.50. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (City of Ormond Beach) — 1 ELU min ($3,577.00 one-time), Water Connection Fee (City of Ormond Beach) — 1 ELU min ($2,333.00 one-time) and County Thoroughfare Road Impact Fee (Ormond Beach, Commercial) ($6.32/sq ft).
View the full fee schedule
- Water Connection Fee (City of Ormond Beach) — 1 ELU min$2,333.00 one-timeCity of Ormond BeachOwn utility, Ord. 2023-30 eff. 9/4/2023. Nonres = ELU-based, not meter ladder: $2,333/ELU where 1 ELU = 60 plumbing fixture units (fixtures ÷60 = ELUs × $2,333). 1-ELU minimum entered. LDC §1-25.
- Sewer Connection Fee (City of Ormond Beach) — 1 ELU min$3,577.00 one-timeCity of Ormond BeachOwn utility, Ord. 2023-30 eff. 9/4/2023. Nonres = ELU-based: $3,577/ELU, 1 ELU = 60 fixture units. 1-ELU minimum entered.
- City Local Roads Impact Fee (Ormond Beach, Commercial)$5.56/sq ftCity of Ormond BeachLocal Roads (transportation) impact fee, Ord. 2023-30, eff. 9/4/2023. Per 1,000 sf GFA. Row: General Commercial 40,000-150,000 sf. TCEA areas pay a trip-based mobility fee instead. Parks residential-only.
- City Fire Impact Fee (Ormond Beach, Commercial)$0.43/sq ftCity of Ormond BeachOrd. 2023-30, eff. 9/4/2023. PSF. Retail row (Institutional $0.320, default nonres $0.454).
- City Police Impact Fee (Ormond Beach, Commercial)$0.34/sq ftCity of Ormond BeachOrd. 2023-30, eff. 9/4/2023. PSF. Retail row (Institutional $0.249, default nonres $0.220).
- County Thoroughfare Road Impact Fee (Ormond Beach, Commercial)$6.32/sq ftVolusia CountyVolusia County overlay; Road + EMS countywide.
- County EMS Impact Fee (Ormond Beach, Commercial)$0.12/sq ftVolusia CountyVolusia County EMS overlay; countywide.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ormond Beach: Industrial Impact Fees
Industrial development in Ormond Beach pays $2.92 per square foot in impact fees, plus $5,910.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $152,121.50. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (City of Ormond Beach) — 1 ELU min ($3,577.00 one-time), Water Connection Fee (City of Ormond Beach) — 1 ELU min ($2,333.00 one-time) and County Thoroughfare Road Impact Fee (Ormond Beach, Industrial) ($2.42/sq ft).
View the full fee schedule
- Water Connection Fee (City of Ormond Beach) — 1 ELU min$2,333.00 one-timeCity of Ormond BeachOwn utility, Ord. 2023-30 eff. 9/4/2023. Nonres = ELU-based, not meter ladder: $2,333/ELU where 1 ELU = 60 plumbing fixture units (fixtures ÷60 = ELUs × $2,333). 1-ELU minimum entered. LDC §1-25.
- Sewer Connection Fee (City of Ormond Beach) — 1 ELU min$3,577.00 one-timeCity of Ormond BeachOwn utility, Ord. 2023-30 eff. 9/4/2023. Nonres = ELU-based: $3,577/ELU, 1 ELU = 60 fixture units. 1-ELU minimum entered.
- City Local Roads Impact Fee (Ormond Beach, Industrial)$0.45/sq ftCity of Ormond BeachOrd. 2023-30, eff. 9/4/2023. Row: Industrial (Warehouse $176.56).
- City Fire Impact Fee (Ormond Beach, Industrial)$0.02/sq ftCity of Ormond BeachOrd. 2023-30, eff. 9/4/2023. PSF. Industrial/Warehousing row.
- City Police Impact Fee (Ormond Beach, Industrial)$0.01/sq ftCity of Ormond BeachOrd. 2023-30, eff. 9/4/2023. PSF. Industrial/Warehousing row.
- County Thoroughfare Road Impact Fee (Ormond Beach, Industrial)$2.42/sq ftVolusia CountyVolusia County overlay; countywide.
- County EMS Impact Fee (Ormond Beach, Industrial)$0.02/sq ftVolusia CountyVolusia County EMS overlay; countywide.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ormond Beach: Office Impact Fees
Office development in Ormond Beach pays $7.59 per square foot in impact fees, plus $5,910.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 25,000 sq ft building, that comes to about $195,542.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Connection Fee (City of Ormond Beach) — 1 ELU min ($3,577.00 one-time), Water Connection Fee (City of Ormond Beach) — 1 ELU min ($2,333.00 one-time) and County Thoroughfare Road Impact Fee (Ormond Beach, Office) ($5.40/sq ft).
View the full fee schedule
- Water Connection Fee (City of Ormond Beach) — 1 ELU min$2,333.00 one-timeCity of Ormond BeachOwn utility, Ord. 2023-30 eff. 9/4/2023. Nonres = ELU-based, not meter ladder: $2,333/ELU where 1 ELU = 60 plumbing fixture units (fixtures ÷60 = ELUs × $2,333). 1-ELU minimum entered. LDC §1-25.
- Sewer Connection Fee (City of Ormond Beach) — 1 ELU min$3,577.00 one-timeCity of Ormond BeachOwn utility, Ord. 2023-30 eff. 9/4/2023. Nonres = ELU-based: $3,577/ELU, 1 ELU = 60 fixture units. 1-ELU minimum entered.
- City Local Roads Impact Fee (Ormond Beach, Office)$1.71/sq ftCity of Ormond BeachOrd. 2023-30, eff. 9/4/2023. Row: General/Government Office.
- $0.24/sq ft
- $0.19/sq ft
- County Thoroughfare Road Impact Fee (Ormond Beach, Office)$5.40/sq ftVolusia CountyVolusia County overlay; countywide.
- $0.04/sq ft
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Ormond Beach
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Ormond Beach, Florida?
A new single-family home in Ormond Beach pays $20,432.91 per unit in combined impact fees (rates sourced July 18, 2026).
How much are commercial impact fees in Ormond Beach?
Commercial development in Ormond Beach pays $12.77 per square foot in impact fees, plus $5,910.00 in one-time water and sewer connection fees, about $644,264.50 for a 50,000 sq ft building.
Does Ormond Beach charge its own impact fees?
Yes. Ormond Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Ormond Beach, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Volusia County impact fees page.