Daytona Beach Shores, Florida Impact Fees

Daytona Beach Shores applies its own fee schedule: municipal fees plus the Volusia County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $15,384.67 per unit (rates sourced July 18, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Daytona Beach Shores impact fees by project type

Daytona Beach Shores: Single-Family Impact Fees

A new single-family home in Daytona Beach Shores pays at least $15,384.67 per unit in impact fees (rates sourced July 18, 2026). Of that, Volusia County-levied fees account for $13,200.67 and municipal or utility fees for $2,184.00.

The largest line items are County School Impact Fee (Volusia County) ($7,022.70), County Thoroughfare Road Impact Fee (Volusia County) ($5,464.00) and Water Connection Fee (Daytona Beach Shores) ($2,184.00).

Sewer Connection Fee (Daytona Beach Shores) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$2,184.00
  • Water Connection Fee (Daytona Beach Shores)
    City of Daytona Beach (N of Thames Ave)
    City of Daytona Beach
    CONFIRMED provider + amount (7/14/2026 audit). DBS runs no water plant: parcels N of Thames Ave are served by City of Daytona Beach, S of Thames Ave by City of Port Orange. Daytona Beach water capital facilities (impact) fee = $2,184 (1.0 ERC / 5/8" meter), Code Sec. 98-257, Ord. 2025-311 eff. 12/1/2025; no outside-city surcharge on the capital fee. Port Orange side = $1,545 (see Port Orange). Amount shown = Daytona Beach (dominant/representative).
    $2,184.00
Sewer$0.00
  • Sewer Connection Fee (Daytona Beach Shores)
    City of Daytona Beach Shores
    Provider CONFIRMED, amount UNCONFIRMED (7/14/2026 audit). DBS owns/operates its OWN sanitary sewer system (not Daytona Beach's) — Daytona Beach's $3,501 sewer fee does NOT apply here. The DBS Sewer Impact Fee is set by resolution in the DBS LDC Schedule of Fees (held at City Clerk), not published online. Confirm amount: DBS Finance/Utility 386-763-7577 or City Hall 386-763-5353.
    Requires confirmation
City$0.00
  • City Impact Fee (Daytona Beach Shores)
    City of Daytona Beach Shores
    $0 CONFIRMED (7/14/2026 audit). Daytona Beach Shores levies NO municipal impact fees — full Code chapter list + LDC Ch. 5 (Building Permits/Fees, Sec. 5-8) reviewed. The only development charges in DBS are building/permit fees, its own sewer impact fee, the Volusia County road impact fee, and Port Orange/Daytona Beach water fees. No city parks/police/fire/transportation/gen-gov impact fee (police+fire funded by ad valorem). Supersedes the incomplete county FAQ.
    $0.00
County$13,200.67
Total (Daytona Beach Shores): $15,384.67
Sources last checked July 18, 2026Official fee schedules:City of Daytona Beach City of Daytona Beach Shores Volusia County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Daytona Beach Shores: Multifamily Impact Fees

A new multifamily unit in Daytona Beach Shores pays at least $8,549.36 per unit in impact fees (rates sourced July 18, 2026). Of that, Volusia County-levied fees account for $6,802.36 and municipal or utility fees for $1,747.00.

The largest line items are County School Impact Fee (Volusia County) ($3,728.95), County Thoroughfare Road Impact Fee (Volusia County) ($2,489.00) and Water Connection Fee (Daytona Beach Shores, MF) ($1,747.00).

Sewer Connection Fee (Daytona Beach Shores, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,747.00
  • Water Connection Fee (Daytona Beach Shores, MF)
    City of Daytona Beach (N of Thames Ave)
    City of Daytona Beach
    CONFIRMED provider + amount (7/14/2026 audit). DBS N of Thames Ave = City of Daytona Beach water; S of Thames = Port Orange. Daytona Beach water capital facilities (impact) fee MF = $1,747/dwelling unit (0.80 ERC), Code Sec. 98-257, Ord. 2025-311 eff. 12/1/2025; no outside-city surcharge. Amount = Daytona Beach (representative).
    $1,747.00
Sewer$0.00
  • Sewer Connection Fee (Daytona Beach Shores, MF)
    City of Daytona Beach Shores
    Provider CONFIRMED, amount UNCONFIRMED (7/14/2026 audit). DBS runs its OWN sewer system — Daytona Beach's fee does not apply. DBS Sewer Impact Fee set by resolution (DBS LDC Schedule of Fees, City Clerk); MF per-unit vs master-connection basis unpublished. Confirm: DBS 386-763-7577 / 386-763-5353.
    Requires confirmation
City$0.00
  • City Impact Fee (Daytona Beach Shores)
    City of Daytona Beach Shores
    $0 CONFIRMED (7/14/2026 audit). Daytona Beach Shores levies NO municipal impact fees — full Code + LDC Ch. 5 (Sec. 5-8) reviewed. Only development charges are building/permit fees, its own sewer impact fee, the Volusia County road fee, and Port Orange/Daytona Beach water fees. No city parks/police/fire/transportation/gen-gov impact fee. Supersedes the incomplete county FAQ.
    $0.00
County$6,802.36
Total (Daytona Beach Shores): $8,549.36
Sources last checked July 18, 2026Official fee schedules:City of Daytona Beach City of Daytona Beach Shores Volusia County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Volusia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Daytona Beach Shores: Commercial Impact Fees

Commercial development in Daytona Beach Shores pays $6.44 per square foot in impact fees, plus $3,647.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to at least $325,647.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Facilities Fee (Daytona Beach Shores) — 1" meter ($3,647.00 one-time), County Thoroughfare Road Impact Fee (Daytona Beach Shores, Commercial) ($6.32/sq ft) and County EMS Impact Fee (Daytona Beach Shores, Commercial) ($0.12/sq ft).

Sewer Impact Fee (Daytona Beach Shores) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$3,647.00 one-time
  • Water Capital Facilities Fee (Daytona Beach Shores) — 1" meter
    DBS runs no water plant. Parcels N of Thames Ave served by City of Daytona Beach (fee shown, General Service/Commercial capital facilities, 1" meter, eff. 12/1/2025); full commercial meter ladder = Daytona Beach schedule (see Daytona Beach records). Parcels S of Thames Ave served by City of Port Orange (see Port Orange). Representative = Daytona Beach.
    $3,647.00 one-time
Sewer$0.00
  • Sewer Impact Fee (Daytona Beach Shores)
    UNCONFIRMED amount. DBS owns/operates its OWN sanitary sewer (not Daytona Beach's). Sewer impact fee set by resolution in the DBS LDC Schedule of Fees (held at City Clerk), not published online. Confirm nonres amount: DBS Finance/Utility 386-763-7577 or City Hall 386-763-5353.
    Requires confirmation
City$0.00
  • City Impact Fee (Daytona Beach Shores, Commercial)
    City of Daytona Beach Shores
    $0 CONFIRMED. Daytona Beach Shores levies NO municipal impact fees (full Code + LDC Ch. 5 Building Permits/Fees §5-8 reviewed 7/2026; police & fire funded by ad valorem). Only development charges are building/permit fees, DBS sewer impact fee, county road/EMS fees, and Daytona Beach/Port Orange water fees.
    $0.00
County$6.44/sq ft
Total (Daytona Beach Shores): $6.44/sq ft + $3,647.00 one-time (≈ $325,647.00 at 50,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:City of Daytona Beach Shores Volusia County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Volusia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Daytona Beach Shores: Industrial Impact Fees

Industrial development in Daytona Beach Shores pays $2.44 per square foot in impact fees, plus $3,647.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to at least $125,647.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Facilities Fee (Daytona Beach Shores) — 1" meter ($3,647.00 one-time), County Thoroughfare Road Impact Fee (Daytona Beach Shores, Industrial) ($2.42/sq ft) and County EMS Impact Fee (Daytona Beach Shores, Industrial) ($0.02/sq ft).

Sewer Impact Fee (Daytona Beach Shores) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$3,647.00 one-time
  • Water Capital Facilities Fee (Daytona Beach Shores) — 1" meter
    DBS runs no water plant. Parcels N of Thames Ave served by City of Daytona Beach (fee shown, General Service/Commercial capital facilities, 1" meter, eff. 12/1/2025); full commercial meter ladder = Daytona Beach schedule (see Daytona Beach records). Parcels S of Thames Ave served by City of Port Orange (see Port Orange). Representative = Daytona Beach.
    $3,647.00 one-time
Sewer$0.00
  • Sewer Impact Fee (Daytona Beach Shores)
    UNCONFIRMED amount. DBS owns/operates its OWN sanitary sewer (not Daytona Beach's). Sewer impact fee set by resolution in the DBS LDC Schedule of Fees (held at City Clerk), not published online. Confirm nonres amount: DBS Finance/Utility 386-763-7577 or City Hall 386-763-5353.
    Requires confirmation
City$0.00
County$2.44/sq ft
Total (Daytona Beach Shores): $2.44/sq ft + $3,647.00 one-time (≈ $125,647.00 at 50,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:City of Daytona Beach Shores Volusia County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Volusia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Daytona Beach Shores: Office Impact Fees

Office development in Daytona Beach Shores pays $5.44 per square foot in impact fees, plus $3,647.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 25,000 sq ft building, that comes to at least $139,647.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Facilities Fee (Daytona Beach Shores) — 1" meter ($3,647.00 one-time), County Thoroughfare Road Impact Fee (Daytona Beach Shores, Office) ($5.40/sq ft) and County EMS Impact Fee (Daytona Beach Shores, Office) ($0.04/sq ft).

Sewer Impact Fee (Daytona Beach Shores) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$3,647.00 one-time
  • Water Capital Facilities Fee (Daytona Beach Shores) — 1" meter
    DBS runs no water plant. Parcels N of Thames Ave served by City of Daytona Beach (fee shown, General Service/Commercial capital facilities, 1" meter, eff. 12/1/2025); full commercial meter ladder = Daytona Beach schedule (see Daytona Beach records). Parcels S of Thames Ave served by City of Port Orange (see Port Orange). Representative = Daytona Beach.
    $3,647.00 one-time
Sewer$0.00
  • Sewer Impact Fee (Daytona Beach Shores)
    UNCONFIRMED amount. DBS owns/operates its OWN sanitary sewer (not Daytona Beach's). Sewer impact fee set by resolution in the DBS LDC Schedule of Fees (held at City Clerk), not published online. Confirm nonres amount: DBS Finance/Utility 386-763-7577 or City Hall 386-763-5353.
    Requires confirmation
City$0.00
County$5.44/sq ft
Total (Daytona Beach Shores): $5.44/sq ft + $3,647.00 one-time (≈ $139,647.00 at 25,000 sq ft)
Sources last checked July 18, 2026Official fee schedules:City of Daytona Beach Shores Volusia County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Volusia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Daytona Beach Shores

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Daytona Beach Shores, Florida?

A new single-family home in Daytona Beach Shores pays at least $15,384.67 per unit in combined impact fees (rates sourced July 18, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Daytona Beach Shores?

Commercial development in Daytona Beach Shores pays $6.44 per square foot in impact fees, plus $3,647.00 in one-time water and sewer connection fees, at least $325,647.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Daytona Beach Shores charge its own impact fees?

Yes. Daytona Beach Shores levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Daytona Beach Shores, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Volusia County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000