Edgewater impact fees by project type
Edgewater: Single-Family Impact Fees
A new single-family home in Edgewater pays $28,617.67 per unit in impact fees (rates sourced August 7, 2026). Of that, Volusia County-levied fees account for $13,200.67 and municipal or utility fees for $15,417.00.
The largest line items are County School Impact Fee (Volusia County) ($7,022.70), County Thoroughfare Road Impact Fee (Volusia County) ($5,464.00) and Sewer Impact Fee (City of Edgewater) ($4,685.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Edgewater impact fee schedule
- Water Impact Fee (City of Edgewater)$4,605.00City of EdgewaterAMOUNT CORRECTED 8/3/2026 from $1,612.43 (unverified web-search snippet) to $4,605.00 per ERU — Water Impact Fee per the city's FY2026 Impact Fee Worksheet ('effective 10-01-2025'). A separate $600 3/4" Water Connection Fee applies — never sum into this record. Sewer sibling: $4,685/ERU impact + $175 connection. Authority: Sec. 19-12(a), rates by Res. 2025-R-27.
- Reclaimed Water Connection Fee (City of Edgewater)$600.00City of EdgewaterCity of Edgewater FY2026 Impact Fee Worksheet, Utilities section, 'Reclaimed Water Connection Fee' = $600.00 per meter. Effective 10-01-2025; worksheet provided by user 8/7/2026. Applies where reclaimed/reuse water service is available.
- Water Connection Fee (City of Edgewater)$600.003/4 inch meterCity of EdgewaterCity of Edgewater FY2026 Impact Fee Worksheet, Utilities section, 'Water Connection' by meter size. 3/4 inch = $600 (canonical SFR meter, default). Full tier set: 3/4"=$600, 1"=$725, 1-1/2"=$1,000, 2"=$1,575, 3"=$2,050, 4"=$3,800. Effective 10-01-2025; provided by user 8/7/2026. SEPARATE from the $4,605/ERU Water Impact Fee (both apply).
- Sewer Impact Fee (City of Edgewater)$4,685.00City of EdgewaterAMOUNT CORRECTED 8/3/2026 from $2,226.69 (unverified web-search snippet that matches nothing in the city's documents) to $4,685.00 per ERU — Sewer Impact Fee per the city's FY2026 Impact Fee Worksheet ('effective 10-01-2025'; city migrated to a new CivicEngage site, old URLs 404). A separate $175/ERU Sewer Connection Fee applies — never sum into this record. Same worksheet: Water Impact $4,605/ERU + $600 3/4" connection (see water sibling); Reclaimed $600; stormwater eff. 11/17/2025. Authority: Sec. 19-34, rates by Res. 2025-R-27.
- Sewer Connection Fee (City of Edgewater)$175.00City of EdgewaterCity of Edgewater FY2026 Impact Fee Worksheet, Utilities section, 'Sewer Connection Fee' = $175.00 per ERU. Effective 10-01-2025; worksheet provided by user 8/7/2026. SEPARATE from the $4,685/ERU Sewer Impact Fee (both apply). Authority: Code Sec. 19-34; Res. 2025-R-27.
- Parks & Recreation$1,306.00City of EdgewaterCity of Edgewater FY 2026 Impact Fee Worksheet, 'Single Family/ Multi-Family' row, 'Parks & Recreation' column = $1,306 per dwelling unit. 8/5/2026.
- Fire Protection and EMS$1,019.00City of EdgewaterCity of Edgewater FY 2026 Impact Fee Worksheet, 'Single Family/ Multi-Family' row, 'Fire/Rescue' column = $1,019 per dwelling unit. Edgewater's fire/rescue impact fee covers fire and emergency response; there is no separately named EMS fee. 8/5/2026.
- General Government Buildings Impact Fee$833.00City of EdgewaterCity of Edgewater FY2026 Impact Fee Worksheet (Development Services), 'Single Family/ Multi-Family' row, 'General Gvt Bldg' column = $833 per dwelling unit. Effective 10-01-2025 (as of 06-30-2026); worksheet provided by user 8/7/2026. Rates adopted by Res. 2025-R-27. Residential package: Fire/Rescue $1,019 + Law Enforcement $408 + General Gvt Bldg $833 + Parks & Rec $1,306 + Multi-Modal $346 = $3,912/DU. This category was missing from the DB before 8/7/2026.
- Police Impact Fee$408.00City of EdgewaterCity of Edgewater FY 2026 Impact Fee Worksheet, 'Single Family/ Multi-Family' row, 'Law Enforcement' column = $408 per dwelling unit. This is the city's police impact fee. 8/5/2026.
- Transportation$346.00City of EdgewaterCity of Edgewater FY 2026 Impact Fee Worksheet (Development Services), row 'Single Family/ Multi-Family', column 'Multi-Modal Transport' = $346 per dwelling unit. Same worksheet: Fire/Rescue $1,019, Law Enforcement $408, General Government Buildings $833, Parks & Recreation $1,306; residential sub-total $3,912 per DU. Worksheet linked from the city's Building Permit Fees page alongside Res. 2025-R-27. 8/5/2026.
- County School Impact Fee (Volusia County)$7,022.70Volusia County2026 Residential schedule, eff. 6/3/2026. $7,022.70 flat per SFD unit, all sizes. Countywide.
- County Thoroughfare Road Impact Fee (Volusia County)$5,464.00SF Detached, 1,701-2,200 sq ftVolusia County2026 Volusia Residential Impact Fee Schedule, eff. 6/3/2026. County Thoroughfare Road Impact Fee (Volusia County) tiered by SFD heated floor area; this record = SF Detached, 1,701-2,200 sq ft. Applies countywide (unincorporated + every city). Source: volusia.org 2026-Residential schedule.
- County Cultural/Rec District Park Impact Fee (Volusia County)$644.00SF Detached, 1,701-2,200 sq ftVolusia County2026 Volusia Residential Impact Fee Schedule, eff. 6/3/2026. County Cultural/Rec District Park Impact Fee (Volusia County) tiered by SFD heated floor area; this record = SF Detached, 1,701-2,200 sq ft. Applies countywide (unincorporated + every city). Source: volusia.org 2026-Residential schedule.
- County EMS Impact Fee (Volusia County)$69.97SF Detached, 1,701-2,200 sq ftVolusia County2026 Volusia Residential Impact Fee Schedule, eff. 6/3/2026. County EMS Impact Fee (Volusia County) tiered by SFD heated floor area; this record = SF Detached, 1,701-2,200 sq ft. Applies countywide (unincorporated + every city). Source: volusia.org 2026-Residential schedule.
- Stormwater Impact Fee (City of Edgewater)$840.00City of EdgewaterCity of Edgewater FY2026 Impact Fee Worksheet, Utilities section, 'Stormwater Impact- effective November 17th, 2025', Residential = $840.00 per EDU. Worksheet provided by user 8/7/2026. Commercial basis differs ($0.430/impervious sq ft + $210 base). One-time developer-input fee; residential = 1 EDU/dwelling.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Edgewater: Multifamily Impact Fees
A new multifamily unit in Edgewater pays $22,219.36 per unit in impact fees (rates sourced August 7, 2026). Of that, Volusia County-levied fees account for $6,802.36 and municipal or utility fees for $15,417.00.
The largest line items are Sewer Impact Fee (City of Edgewater, MF) ($4,685.00), Water Impact Fee (City of Edgewater, MF) ($4,605.00) and County School Impact Fee (Volusia County) ($3,728.95).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Edgewater impact fee schedule
- Water Impact Fee (City of Edgewater, MF)$4,605.00City of EdgewaterCity of Edgewater FY2026 Impact Fee Worksheet, Utilities 'Water Impact Fee' = $4,605.00 per ERU. The worksheet lists residential utility fees 'Per Dwelling Unit' and its 300-unit example computes 300 x $4,605 = $1,381,500, i.e. 1.0 ERU per dwelling unit for MF as well as SF. So MF = SFR per unit = $4,605, CONFIRMED via the worksheet (not a copy bug). Separate $600 3/4-in water connection fee also applies. Authority: Code Sec. 19-12(a); Res. 2025-R-27. Effective 10-01-2025.
- Reclaimed Water Connection Fee (City of Edgewater, MF)$600.00City of EdgewaterCity of Edgewater FY2026 Impact Fee Worksheet, 'Reclaimed Water Connection Fee' = $600.00 per meter. Effective 10-01-2025; provided by user 8/7/2026. Applies where reclaimed/reuse service available; per meter (MF master meter).
- Water Connection Fee (City of Edgewater, MF)$600.003/4 inch meterCity of EdgewaterCity of Edgewater FY2026 Impact Fee Worksheet, 'Water Connection' by meter size. Default = smallest 3/4-in $600 as a floor; a multifamily master meter is sized to the building and scales up (1"=$725, 1-1/2"=$1,000, 2"=$1,575, 3"=$2,050, 4"=$3,800). Effective 10-01-2025. SEPARATE from the $4,605/ERU Water Impact Fee.
- Sewer Impact Fee (City of Edgewater, MF)$4,685.00City of EdgewaterCity of Edgewater FY2026 Impact Fee Worksheet, Utilities 'Sewer Impact Fee' = $4,685.00 per ERU. Worksheet lists residential utility fees per dwelling unit at 1.0 ERU/unit (300-unit example: 300 x $4,685 = $1,405,500). MF = SFR per unit = $4,685, CONFIRMED via worksheet. Separate $175/ERU sewer connection fee also applies. Authority: Code Sec. 19-34; Res. 2025-R-27. Effective 10-01-2025.
- Sewer Connection Fee (City of Edgewater, MF)$175.00City of EdgewaterCity of Edgewater FY2026 Impact Fee Worksheet, 'Sewer Connection Fee' = $175.00 per ERU. Effective 10-01-2025; provided by user 8/7/2026. Per-ERU, so $175/unit at 1.0 ERU/unit. SEPARATE from the $4,685/ERU Sewer Impact Fee.
- Parks & Recreation Impact Fee (MF)$1,306.00City of EdgewaterCity of Edgewater FY2026 Impact Fee Worksheet, 'Single Family/ Multi-Family' row, 'Parks & Recreation' column = $1,306 per dwelling unit. Effective 10-01-2025; provided by user 8/7/2026. MF = SF amount is correct (combined worksheet row). Res. 2025-R-27.
- Fire and Rescue Impact Fee (MF)$1,019.00City of EdgewaterCity of Edgewater FY2026 Impact Fee Worksheet, 'Single Family/ Multi-Family' row (one combined residential rate applies to both SF and MF), 'Fire/Rescue' column = $1,019 per dwelling unit. Effective 10-01-2025; worksheet provided by user 8/7/2026. MF = SF amount is CORRECT (worksheet does not split SF vs MF for city impact fees). Res. 2025-R-27. Before 8/7/2026 the MF table wrongly carried a $0 'no city impact fees' placeholder.
- General Government Buildings Impact Fee (MF)$833.00City of EdgewaterCity of Edgewater FY2026 Impact Fee Worksheet, 'Single Family/ Multi-Family' row, 'General Gvt Bldg' column = $833 per dwelling unit. Effective 10-01-2025; provided by user 8/7/2026. MF = SF amount is correct (combined worksheet row). Res. 2025-R-27.
- Police Impact Fee (MF)$408.00City of EdgewaterCity of Edgewater FY2026 Impact Fee Worksheet, 'Single Family/ Multi-Family' row, 'Law Enforcement' column = $408 per dwelling unit. Effective 10-01-2025; provided by user 8/7/2026. City police impact fee. MF = SF amount is correct (combined worksheet row). Res. 2025-R-27.
- Multi-Modal Transportation Impact Fee (MF)$346.00City of EdgewaterCity of Edgewater FY2026 Impact Fee Worksheet, 'Single Family/ Multi-Family' row, 'Multi-Modal Transport' column = $346 per dwelling unit. Effective 10-01-2025; provided by user 8/7/2026. MF = SF amount is correct (combined worksheet row). Note: Mobile Home Park row carries a lower $131 multi-modal rate, but the canonical MF apartment unit uses the Single Family/Multi-Family row. Res. 2025-R-27.
- County School Impact Fee (Volusia County)$3,728.95High-RiseVolusia County2026 Residential schedule, eff. 6/3/2026. School $3,728.95/unit flat across Duplex/Low-Rise/High-Rise (Mobile Home/RV Park $1,415.25 not modeled). Building-type tiers kept parallel to Road per schedule columns. Countywide.
- County Thoroughfare Road Impact Fee (Volusia County)$2,489.00High-RiseVolusia County2026 Residential schedule, eff. 6/3/2026. MF Road by building type: Duplex $4,733; Low-Rise (≤3 stories) $3,700; High-Rise (4+ stories) $2,489. This = High-Rise. Mobile Home/RV Park $1,903 not modeled. Countywide.
- County District/Coastal Park Impact Fee$527.001,200 sq ft or lessVolusia County2026 Residential schedule, eff. 6/3/2026. County District/Coastal Park Impact Fee: MF charged per unit using the SFD heated-area tier table; this record = 1,200 sq ft or less. Applies countywide (unincorporated + every city).
- County EMS Impact Fee$57.411,200 sq ft or lessVolusia County2026 Residential schedule, eff. 6/3/2026. County EMS Impact Fee: MF charged per unit using the SFD heated-area tier table; this record = 1,200 sq ft or less. Applies countywide (unincorporated + every city).
- Stormwater Impact Fee (City of Edgewater, MF)$840.00City of EdgewaterCity of Edgewater FY2026 Impact Fee Worksheet, 'Stormwater Impact- effective November 17th, 2025', Residential = $840.00 per EDU. Provided by user 8/7/2026. Residential = 1 EDU/dwelling unit (MF per unit). Commercial basis differs ($0.430/impervious sq ft + $210 base).
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Edgewater: Commercial Impact Fees
Commercial development in Edgewater pays $6.44 per square foot in impact fees, plus $3,839.12 in one-time water and sewer connection fees (rates sourced August 7, 2026).
For a 50,000 sq ft building, that comes to about $325,839.12. The calculator below adjusts to your exact square footage.
The largest line items are County Thoroughfare Road Impact Fee (Edgewater, Commercial) ($6.32/sq ft) and County EMS Impact Fee (Edgewater, Commercial) ($0.12/sq ft).
Water Impact Fee (City of Edgewater) — 1 ERU min and Sewer Impact Fee (City of Edgewater) — 1 ERU min are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full Edgewater impact fee schedule
- Water Impact Fee (City of Edgewater) — 1 ERU min$1,612.43 one-timeRequires confirmationCity of EdgewaterEdgewater water impact fee, ERU-based (Code Sec. 19-12, rates set by Res. 2025-R-27). ~$1,612.43 per ERU from FY2026 Impact Fee Worksheet (web-surfaced lead; worksheet PDF not directly accessible this run; the posted rate sheet is monthly charges only). 1-ERU nonres minimum entered; nonres ERU multiplier basis unconfirmed. Call 386-424-2400 x1340.
- Sewer Impact Fee (City of Edgewater) — 1 ERU min$2,226.69 one-timeRequires confirmationCity of EdgewaterEdgewater wastewater impact fee, ERU-based (Code Sec. 19-34, Res. 2025-R-27). ~$2,226.69 per ERU from FY2026 Impact Fee Worksheet (web-surfaced lead; worksheet PDF not directly accessible). 1-ERU nonres minimum entered; nonres ERU multiplier basis unconfirmed. Call 386-424-2400 x1340.
- City Impact Fee (Edgewater, Commercial)$0.00City of Edgewater$0 confirmed — Edgewater levies no municipal non-utility impact fee. Full Municode code-of-ordinances TOC reviewed: only water (Sec. 19-12) and wastewater (Sec. 19-34) impact fees exist (utility fees, in W/S table); no transportation/parks/fire/police impact-fee chapters. Stormwater/housing fees were under 2025 moratorium consideration, not codified (Supp. 34). Confirmed 6/2026.
- County Thoroughfare Road Impact Fee (Edgewater, Commercial)$6.32/sq ftVolusia CountyVolusia County Commercial Impact Fee Schedule eff. 3/6/2023 (current). Road countywide. Row: Retail/Shopping Center 40,000-150,000 sq ft.
- County EMS Impact Fee (Edgewater, Commercial)$0.12/sq ftVolusia CountyVolusia County Commercial Impact Fee Schedule eff. 3/6/2023. EMS countywide. Row: Retail/Shopping Center 40,000-150,000 sq ft.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Edgewater: Industrial Impact Fees
Industrial development in Edgewater pays $2.44 per square foot in impact fees, plus $3,839.12 in one-time water and sewer connection fees (rates sourced August 7, 2026).
For a 50,000 sq ft building, that comes to about $125,839.12. The calculator below adjusts to your exact square footage.
The largest line items are County Thoroughfare Road Impact Fee (Edgewater, Industrial) ($2.42/sq ft) and County EMS Impact Fee (Edgewater, Industrial) ($0.02/sq ft).
Water Impact Fee (City of Edgewater) — 1 ERU min and Sewer Impact Fee (City of Edgewater) — 1 ERU min are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full Edgewater impact fee schedule
- Water Impact Fee (City of Edgewater) — 1 ERU min$1,612.43 one-timeRequires confirmationCity of EdgewaterEdgewater water impact fee, ERU-based (Code Sec. 19-12, rates set by Res. 2025-R-27). ~$1,612.43 per ERU from FY2026 Impact Fee Worksheet (web-surfaced lead; worksheet PDF not directly accessible this run; the posted rate sheet is monthly charges only). 1-ERU nonres minimum entered; nonres ERU multiplier basis unconfirmed. Call 386-424-2400 x1340.
- Sewer Impact Fee (City of Edgewater) — 1 ERU min$2,226.69 one-timeRequires confirmationCity of EdgewaterEdgewater wastewater impact fee, ERU-based (Code Sec. 19-34, Res. 2025-R-27). ~$2,226.69 per ERU from FY2026 Impact Fee Worksheet (web-surfaced lead; worksheet PDF not directly accessible). 1-ERU nonres minimum entered; nonres ERU multiplier basis unconfirmed. Call 386-424-2400 x1340.
- City Impact Fee (Edgewater, Industrial)$0.00City of Edgewater$0 confirmed — no municipal non-utility impact fee (only W/S impact fees in Ch. 19). Confirmed 6/2026.
- County Thoroughfare Road Impact Fee (Edgewater, Industrial)$2.42/sq ftVolusia CountyVolusia County Commercial Impact Fee Schedule eff. 3/6/2023. Road countywide. Row: General Industrial.
- County EMS Impact Fee (Edgewater, Industrial)$0.02/sq ftVolusia CountyVolusia County Commercial Impact Fee Schedule eff. 3/6/2023. EMS countywide. Row: General Industrial.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Edgewater: Office Impact Fees
Office development in Edgewater pays $5.44 per square foot in impact fees, plus $3,839.12 in one-time water and sewer connection fees (rates sourced August 7, 2026).
For a 25,000 sq ft building, that comes to about $139,839.12. The calculator below adjusts to your exact square footage.
The largest line items are County Thoroughfare Road Impact Fee (Edgewater, Office) ($5.40/sq ft) and County EMS Impact Fee (Edgewater, Office) ($0.04/sq ft).
Water Impact Fee (City of Edgewater) — 1 ERU min and Sewer Impact Fee (City of Edgewater) — 1 ERU min are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full Edgewater impact fee schedule
- Water Impact Fee (City of Edgewater) — 1 ERU min$1,612.43 one-timeRequires confirmationCity of EdgewaterEdgewater water impact fee, ERU-based (Code Sec. 19-12, rates set by Res. 2025-R-27). ~$1,612.43 per ERU from FY2026 Impact Fee Worksheet (web-surfaced lead; worksheet PDF not directly accessible this run; the posted rate sheet is monthly charges only). 1-ERU nonres minimum entered; nonres ERU multiplier basis unconfirmed. Call 386-424-2400 x1340.
- Sewer Impact Fee (City of Edgewater) — 1 ERU min$2,226.69 one-timeRequires confirmationCity of EdgewaterEdgewater wastewater impact fee, ERU-based (Code Sec. 19-34, Res. 2025-R-27). ~$2,226.69 per ERU from FY2026 Impact Fee Worksheet (web-surfaced lead; worksheet PDF not directly accessible). 1-ERU nonres minimum entered; nonres ERU multiplier basis unconfirmed. Call 386-424-2400 x1340.
- City Impact Fee (Edgewater, Office)$0.00City of Edgewater$0 confirmed — no municipal non-utility impact fee (only W/S impact fees in Ch. 19). Confirmed 6/2026.
- County Thoroughfare Road Impact Fee (Edgewater, Office)$5.40/sq ftVolusia CountyVolusia County Commercial Impact Fee Schedule eff. 3/6/2023. Road countywide. Row: Office.
- County EMS Impact Fee (Edgewater, Office)$0.04/sq ftVolusia CountyVolusia County Commercial Impact Fee Schedule eff. 3/6/2023. EMS countywide. Row: Office.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Edgewater impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Edgewater impact fee FAQs
What are the total impact fees for a single-family home in Edgewater, Florida?
A new single-family home in Edgewater pays $28,617.67 per unit in combined impact fees (rates sourced August 7, 2026).
How much are commercial impact fees in Edgewater?
Commercial development in Edgewater pays $6.44 per square foot in impact fees, plus $3,839.12 in one-time water and sewer connection fees, about $325,839.12 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Edgewater charge its own impact fees?
Yes. Edgewater levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Edgewater, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Volusia County impact fees page.