Edgewater impact fees by project type
Edgewater: Single-Family Impact Fees
A new single-family home in Edgewater pays at least $17,039.79 per unit in impact fees (rates sourced July 24, 2026). Of that, Volusia County-levied fees account for $13,200.67 and municipal or utility fees for $3,839.12.
The largest line items are County School Impact Fee (Volusia County) ($7,022.70), County Thoroughfare Road Impact Fee (Volusia County) ($5,464.00) and County Cultural/Rec District Park Impact Fee (Volusia County) ($644.00).
Sewer Connection Fee (Edgewater) and Water Connection Fee (Edgewater) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Transportation, Fire Protection and EMS, Police Impact Fee, and Parks & Recreation are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Connection Fee (Edgewater)$1,612.43Requires confirmationCity of Edgewater⚠️ VERIFY — ~$1,612.43/ERU per web search (FY 2026 Impact Fee Worksheet). Municode Sec. 19-12(a): rates set by resolution (Res. 2025-R-27). Could not access worksheet directly. Phone: 386-424-2400 x1340.
- Sewer Connection Fee (Edgewater)$2,226.69Requires confirmationCity of Edgewater⚠️ VERIFY — ~$2,226.69/ERU per web search (FY 2026 Impact Fee Worksheet). Municode Sec. 19-34: wastewater impact fees. Rates set by resolution (Res. 2025-R-27). Could not access worksheet directly. Phone: 386-424-2400 x1340.
- TransportationRequires confirmationCity of EdgewaterNo non-W/S city impact fees. Municode Ch. 19 (Utilities & Services) contains only water (Sec. 19-12) and wastewater (Sec. 19-34) impact fees. Full code of ordinances TOC reviewed — no parks, transportation, fire, or police impact fee chapters. Stormwater/housing impact fee ordinances were under consideration during 2025 moratorium but not yet codified (Supp. 34, Oct 2024). Confirmed June 2026.
- Fire Protection and EMSRequires confirmationCity of EdgewaterNo non-W/S city impact fees. Municode Ch. 19 (Utilities & Services) contains only water (Sec. 19-12) and wastewater (Sec. 19-34) impact fees. Full code of ordinances TOC reviewed — no parks, transportation, fire, or police impact fee chapters. Stormwater/housing impact fee ordinances were under consideration during 2025 moratorium but not yet codified (Supp. 34, Oct 2024). Confirmed June 2026.
- Police Impact FeeRequires confirmationCity of EdgewaterNo non-W/S city impact fees. Municode Ch. 19 (Utilities & Services) contains only water (Sec. 19-12) and wastewater (Sec. 19-34) impact fees. Full code of ordinances TOC reviewed — no parks, transportation, fire, or police impact fee chapters. Stormwater/housing impact fee ordinances were under consideration during 2025 moratorium but not yet codified (Supp. 34, Oct 2024). Confirmed June 2026.
- Parks & RecreationRequires confirmationCity of EdgewaterNo non-W/S city impact fees. Municode Ch. 19 (Utilities & Services) contains only water (Sec. 19-12) and wastewater (Sec. 19-34) impact fees. Full code of ordinances TOC reviewed — no parks, transportation, fire, or police impact fee chapters. Stormwater/housing impact fee ordinances were under consideration during 2025 moratorium but not yet codified (Supp. 34, Oct 2024). Confirmed June 2026.
- County School Impact Fee (Volusia County)$7,022.70Volusia County2026 schedule, eff. 6/3/2026. $7,022.70 flat for all SFR tiers. All jurisdictions.
- County Thoroughfare Road Impact Fee (Volusia County)$5,464.00SF Detached, 1,701-2,200 sq ftVolusia County2026 schedule, eff. 6/3/2026. SFR tiered: ≤1,200=$4,864; 1,201-1,700=$5,097; 1,701-2,200=$5,464; 2,201-3,000=$5,835; >3,000=$6,215. Amount=1,701-2,200 tier.
- County Cultural/Rec District Park Impact Fee (Volusia County)$644.00SF Detached, 1,701-2,200 sq ftVolusia County2026 schedule, eff. 6/3/2026. All jurisdictions.
- County EMS Impact Fee (Volusia County)$69.97SF Detached, 1,701-2,200 sq ftVolusia County2026 schedule, eff. 6/3/2026. All jurisdictions.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Edgewater: Multifamily Impact Fees
A new multifamily unit in Edgewater pays $10,641.48 per unit in impact fees (rates sourced July 24, 2026). Of that, Volusia County-levied fees account for $6,802.36 and municipal or utility fees for $3,839.12.
The largest line items are County School Impact Fee (Volusia County) ($3,728.95), County Thoroughfare Road Impact Fee (Volusia County) ($2,489.00) and County District/Coastal Park Impact Fee ($527.00).
Sewer Connection Fee (Edgewater) and Water Connection Fee (Edgewater) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Connection Fee (Edgewater)$1,612.43Requires confirmationCity of Edgewater⚠️ VERIFY — ~$1,612.43/ERU per web search (FY 2026 Impact Fee Worksheet). MF ERU = 1.0/unit per Sec. 19-10(b). Rates set by resolution (Res. 2025-R-27). Phone: 386-424-2400 x1340.
- Sewer Connection Fee (Edgewater)$2,226.69Requires confirmationCity of Edgewater⚠️ VERIFY — ~$2,226.69/ERU per web search (FY 2026 Impact Fee Worksheet). MF ERU = 1.0/unit per Sec. 19-10(b). Wastewater per Sec. 19-34. Phone: 386-424-2400 x1340.
- City Impact Fee (Edgewater)$0.00City of EdgewaterNo non-W/S city impact fees. Municode Ch. 19 (Utilities & Services) contains only water (Sec. 19-12) and wastewater (Sec. 19-34) impact fees. Full code of ordinances TOC reviewed — no parks, transportation, fire, or police impact fee chapters. Confirmed June 2026.
- County School Impact Fee (Volusia County)$3,728.95High-RiseVolusia County2026 schedule, eff. 6/3/2026. 3+ stories.
- County Thoroughfare Road Impact Fee (Volusia County)$2,489.00High-RiseVolusia County2026 schedule, eff. 6/3/2026. 3+ stories.
- County District/Coastal Park Impact Fee$527.00Per SFD tiered rate, 1,200 sq ft or lessVolusia County** per tiered rate — use SFR tiered rate based on unit SF. Amount shown is ≤1,200 SF tier. Eff. 6/3/2026.
- County EMS Impact Fee$57.41Per SFD tiered rate, 1,200 sq ft or lessVolusia County** per tiered rate — use SFR tiered rate based on unit SF. Amount shown is ≤1,200 SF tier. Eff. 6/3/2026.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Edgewater: Commercial Impact Fees
Commercial development in Edgewater pays $6.44 per square foot in impact fees, plus $3,839.12 in one-time water and sewer connection fees (rates sourced July 24, 2026).
For a 50,000 sq ft building, that comes to about $325,839.12. The calculator below adjusts to your exact square footage.
The largest line items are County Thoroughfare Road Impact Fee (Edgewater, Commercial) ($6.32/sq ft) and County EMS Impact Fee (Edgewater, Commercial) ($0.12/sq ft).
Water Impact Fee (City of Edgewater) — 1 ERU min and Sewer Impact Fee (City of Edgewater) — 1 ERU min are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Impact Fee (City of Edgewater) — 1 ERU min$1,612.43 one-timeRequires confirmationCity of EdgewaterEdgewater water impact fee, ERU-based (Code Sec. 19-12, rates set by Res. 2025-R-27). ~$1,612.43 per ERU from FY2026 Impact Fee Worksheet (web-surfaced lead; worksheet PDF not directly accessible this run; the posted rate sheet is monthly charges only). 1-ERU nonres minimum entered; nonres ERU multiplier basis unconfirmed. Call 386-424-2400 x1340.
- Sewer Impact Fee (City of Edgewater) — 1 ERU min$2,226.69 one-timeRequires confirmationCity of EdgewaterEdgewater wastewater impact fee, ERU-based (Code Sec. 19-34, Res. 2025-R-27). ~$2,226.69 per ERU from FY2026 Impact Fee Worksheet (web-surfaced lead; worksheet PDF not directly accessible). 1-ERU nonres minimum entered; nonres ERU multiplier basis unconfirmed. Call 386-424-2400 x1340.
- City Impact Fee (Edgewater, Commercial)$0.00City of Edgewater$0 confirmed — Edgewater levies no municipal non-utility impact fee. Full Municode code-of-ordinances TOC reviewed: only water (Sec. 19-12) and wastewater (Sec. 19-34) impact fees exist (utility fees, in W/S table); no transportation/parks/fire/police impact-fee chapters. Stormwater/housing fees were under 2025 moratorium consideration, not codified (Supp. 34). Confirmed 6/2026.
- County Thoroughfare Road Impact Fee (Edgewater, Commercial)$6.32/sq ftVolusia CountyVolusia County Commercial Impact Fee Schedule eff. 3/6/2023 (current). Road countywide. Row: Retail/Shopping Center 40,000-150,000 sq ft.
- County EMS Impact Fee (Edgewater, Commercial)$0.12/sq ftVolusia CountyVolusia County Commercial Impact Fee Schedule eff. 3/6/2023. EMS countywide. Row: Retail/Shopping Center 40,000-150,000 sq ft.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Edgewater: Industrial Impact Fees
Industrial development in Edgewater pays $2.44 per square foot in impact fees, plus $3,839.12 in one-time water and sewer connection fees (rates sourced July 24, 2026).
For a 50,000 sq ft building, that comes to about $125,839.12. The calculator below adjusts to your exact square footage.
The largest line items are County Thoroughfare Road Impact Fee (Edgewater, Industrial) ($2.42/sq ft) and County EMS Impact Fee (Edgewater, Industrial) ($0.02/sq ft).
Water Impact Fee (City of Edgewater) — 1 ERU min and Sewer Impact Fee (City of Edgewater) — 1 ERU min are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Impact Fee (City of Edgewater) — 1 ERU min$1,612.43 one-timeRequires confirmationCity of EdgewaterEdgewater water impact fee, ERU-based (Code Sec. 19-12, rates set by Res. 2025-R-27). ~$1,612.43 per ERU from FY2026 Impact Fee Worksheet (web-surfaced lead; worksheet PDF not directly accessible this run; the posted rate sheet is monthly charges only). 1-ERU nonres minimum entered; nonres ERU multiplier basis unconfirmed. Call 386-424-2400 x1340.
- Sewer Impact Fee (City of Edgewater) — 1 ERU min$2,226.69 one-timeRequires confirmationCity of EdgewaterEdgewater wastewater impact fee, ERU-based (Code Sec. 19-34, Res. 2025-R-27). ~$2,226.69 per ERU from FY2026 Impact Fee Worksheet (web-surfaced lead; worksheet PDF not directly accessible). 1-ERU nonres minimum entered; nonres ERU multiplier basis unconfirmed. Call 386-424-2400 x1340.
- City Impact Fee (Edgewater, Industrial)$0.00City of Edgewater$0 confirmed — no municipal non-utility impact fee (only W/S impact fees in Ch. 19). Confirmed 6/2026.
- County Thoroughfare Road Impact Fee (Edgewater, Industrial)$2.42/sq ftVolusia CountyVolusia County Commercial Impact Fee Schedule eff. 3/6/2023. Road countywide. Row: General Industrial.
- County EMS Impact Fee (Edgewater, Industrial)$0.02/sq ftVolusia CountyVolusia County Commercial Impact Fee Schedule eff. 3/6/2023. EMS countywide. Row: General Industrial.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Edgewater: Office Impact Fees
Office development in Edgewater pays $5.44 per square foot in impact fees, plus $3,839.12 in one-time water and sewer connection fees (rates sourced July 24, 2026).
For a 25,000 sq ft building, that comes to about $139,839.12. The calculator below adjusts to your exact square footage.
The largest line items are County Thoroughfare Road Impact Fee (Edgewater, Office) ($5.40/sq ft) and County EMS Impact Fee (Edgewater, Office) ($0.04/sq ft).
Water Impact Fee (City of Edgewater) — 1 ERU min and Sewer Impact Fee (City of Edgewater) — 1 ERU min are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Impact Fee (City of Edgewater) — 1 ERU min$1,612.43 one-timeRequires confirmationCity of EdgewaterEdgewater water impact fee, ERU-based (Code Sec. 19-12, rates set by Res. 2025-R-27). ~$1,612.43 per ERU from FY2026 Impact Fee Worksheet (web-surfaced lead; worksheet PDF not directly accessible this run; the posted rate sheet is monthly charges only). 1-ERU nonres minimum entered; nonres ERU multiplier basis unconfirmed. Call 386-424-2400 x1340.
- Sewer Impact Fee (City of Edgewater) — 1 ERU min$2,226.69 one-timeRequires confirmationCity of EdgewaterEdgewater wastewater impact fee, ERU-based (Code Sec. 19-34, Res. 2025-R-27). ~$2,226.69 per ERU from FY2026 Impact Fee Worksheet (web-surfaced lead; worksheet PDF not directly accessible). 1-ERU nonres minimum entered; nonres ERU multiplier basis unconfirmed. Call 386-424-2400 x1340.
- City Impact Fee (Edgewater, Office)$0.00City of Edgewater$0 confirmed — no municipal non-utility impact fee (only W/S impact fees in Ch. 19). Confirmed 6/2026.
- County Thoroughfare Road Impact Fee (Edgewater, Office)$5.40/sq ftVolusia CountyVolusia County Commercial Impact Fee Schedule eff. 3/6/2023. Road countywide. Row: Office.
- County EMS Impact Fee (Edgewater, Office)$0.04/sq ftVolusia CountyVolusia County Commercial Impact Fee Schedule eff. 3/6/2023. EMS countywide. Row: Office.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Edgewater
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Edgewater, Florida?
A new single-family home in Edgewater pays at least $17,039.79 per unit in combined impact fees (rates sourced July 24, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Edgewater?
Commercial development in Edgewater pays $6.44 per square foot in impact fees, plus $3,839.12 in one-time water and sewer connection fees, about $325,839.12 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Edgewater charge its own impact fees?
Yes. Edgewater levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Edgewater, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Volusia County impact fees page.