IMPACTFEES.ORG

Ponce Inlet, Florida Impact Fees

Ponce Inlet applies its own fee schedule: municipal fees plus the Volusia County-levied fees that apply inside city limits. Combined, a new single-family home pays $16,993.98 per unit (rates sourced July 18, 2026). The full breakdown is below.

Ponce Inlet impact fees by project type

Ponce Inlet: Single-Family Impact Fees

A new single-family home in Ponce Inlet pays $16,993.98 per unit in impact fees (rates sourced July 18, 2026). Of that, Volusia County-levied fees account for $13,200.67 and municipal or utility fees for $3,793.31.

The largest line items are County School Impact Fee (Volusia County) ($7,022.70), County Thoroughfare Road Impact Fee (Volusia County) ($5,464.00) and Sewer Connection Fee (Ponce Inlet) ($2,427.50).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,018.00
Sewer$2,427.50
City$347.81
County$13,200.67
Total (Ponce Inlet): $16,993.98
Sources last checked July 18, 2026Official fee schedules:Town of Ponce Inlet Volusia County

Ponce Inlet: Multifamily Impact Fees

A new multifamily unit in Ponce Inlet pays $10,510.74 per unit in impact fees (rates sourced July 18, 2026). Of that, Volusia County-levied fees account for $6,802.36 and municipal or utility fees for $3,708.38.

The largest line items are County School Impact Fee (Volusia County) ($3,728.95), County Thoroughfare Road Impact Fee (Volusia County) ($2,489.00) and County District/Coastal Park Impact Fee ($527.00).

Water Impact Fee (Ponce Inlet) and Sewer Impact Fee (Ponce Inlet) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,018.00
  • Water Impact Fee (Ponce Inlet)
    Town of Ponce Inlet
    ⚠️ VERIFY — using SFR rate ($1,018). Confirm MF rate from fee schedule. Per-unit or per-ERU basis unknown.
    $1,018.00Requires confirmation
Sewer$2,427.50
  • Sewer Impact Fee (Ponce Inlet)
    Town of Ponce Inlet
    ⚠️ VERIFY — using SFR rate ($2,427.50). Confirm MF rate from fee schedule. Per-unit or per-ERU basis unknown.
    $2,427.50Requires confirmation
City$262.88
County$6,802.36
Total (Ponce Inlet): $10,510.74
Sources last checked July 18, 2026Official fee schedules:Town of Ponce Inlet Volusia County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Volusia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ponce Inlet: Commercial Impact Fees

Commercial development in Ponce Inlet pays $6.44 per square foot in impact fees, plus $5,209.25 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $327,209.25. The calculator below adjusts to your exact square footage.

The largest line items are Water Development Fee (Town of Ponce Inlet) — 1 ELU base ($2,949.25 one-time), Sewer Development Fee (Town of Ponce Inlet / Port Orange) — 1 unit base ($2,260.00 one-time) and County Thoroughfare Road Impact Fee (Ponce Inlet, Commercial) ($6.32/sq ft).

View the full fee schedule
Water$2,949.25 one-time
  • Water Development Fee (Town of Ponce Inlet) — 1 ELU base
    Town of Ponce Inlet (bulk water from City of Port Orange)
    Appendix A Part XII(2), Res. 2024-21 (12/19/2024). Nonres water impact/capacity fee = $2,949.25/ELU base ($1,931.25 Port Orange + $1,018.00 Ponce Inlet) PLUS per-fixture-unit surcharge over 15 FU. ELU-based, not meter. 1-ELU base entered. Separate physical connection (meter) fee 1"=$1,030 not the capacity fee.
    $2,949.25 one-time
Sewer$2,260.00 one-time
  • Sewer Development Fee (Town of Ponce Inlet / Port Orange) — 1 unit base
    City of Port Orange (sewer system; Town of Ponce Inlet bills)
    Appendix A Part XII(2)/(3), Res. 2024-21 (12/19/2024). Nonres sewer impact/capacity = $2,260.00/equivalent unit base + per-FU surcharge over 15 FU, plus $1,775 min service-connection charge if made after main. Some areas on septic. 1-unit base entered.
    $2,260.00 one-time
City$0.00
  • City Impact Fee (Ponce Inlet, Commercial)
    Town of Ponce Inlet
    No municipal nonres impact fee. Confirmed $0 from full Appendix A fee schedule (all 20 parts); the only impact fee (Recreational) is residential-only. Fire 'new construction fee' is a plans-review fee, not impact.
    $0.00
County$6.44/sq ft
Total (Ponce Inlet): $6.44/sq ft + $5,209.25 one-time (≈ $327,209.25 at 50,000 sq ft)

Where in Volusia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ponce Inlet: Industrial Impact Fees

Industrial development in Ponce Inlet pays $2.44 per square foot in impact fees, plus $5,209.25 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $127,209.25. The calculator below adjusts to your exact square footage.

The largest line items are Water Development Fee (Town of Ponce Inlet) — 1 ELU base ($2,949.25 one-time), Sewer Development Fee (Town of Ponce Inlet / Port Orange) — 1 unit base ($2,260.00 one-time) and County Thoroughfare Road Impact Fee (Ponce Inlet, Industrial) ($2.42/sq ft).

View the full fee schedule
Water$2,949.25 one-time
  • Water Development Fee (Town of Ponce Inlet) — 1 ELU base
    Town of Ponce Inlet (bulk water from City of Port Orange)
    Appendix A Part XII(2), Res. 2024-21 (12/19/2024). Nonres water impact/capacity fee = $2,949.25/ELU base ($1,931.25 Port Orange + $1,018.00 Ponce Inlet) PLUS per-fixture-unit surcharge over 15 FU. ELU-based, not meter. 1-ELU base entered. Separate physical connection (meter) fee 1"=$1,030 not the capacity fee.
    $2,949.25 one-time
Sewer$2,260.00 one-time
  • Sewer Development Fee (Town of Ponce Inlet / Port Orange) — 1 unit base
    City of Port Orange (sewer system; Town of Ponce Inlet bills)
    Appendix A Part XII(2)/(3), Res. 2024-21 (12/19/2024). Nonres sewer impact/capacity = $2,260.00/equivalent unit base + per-FU surcharge over 15 FU, plus $1,775 min service-connection charge if made after main. Some areas on septic. 1-unit base entered.
    $2,260.00 one-time
City$0.00
County$2.44/sq ft
Total (Ponce Inlet): $2.44/sq ft + $5,209.25 one-time (≈ $127,209.25 at 50,000 sq ft)

Where in Volusia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ponce Inlet: Office Impact Fees

Office development in Ponce Inlet pays $5.44 per square foot in impact fees, plus $5,209.25 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 25,000 sq ft building, that comes to about $141,209.25. The calculator below adjusts to your exact square footage.

The largest line items are Water Development Fee (Town of Ponce Inlet) — 1 ELU base ($2,949.25 one-time), Sewer Development Fee (Town of Ponce Inlet / Port Orange) — 1 unit base ($2,260.00 one-time) and County Thoroughfare Road Impact Fee (Ponce Inlet, Office) ($5.40/sq ft).

View the full fee schedule
Water$2,949.25 one-time
  • Water Development Fee (Town of Ponce Inlet) — 1 ELU base
    Town of Ponce Inlet (bulk water from City of Port Orange)
    Appendix A Part XII(2), Res. 2024-21 (12/19/2024). Nonres water impact/capacity fee = $2,949.25/ELU base ($1,931.25 Port Orange + $1,018.00 Ponce Inlet) PLUS per-fixture-unit surcharge over 15 FU. ELU-based, not meter. 1-ELU base entered. Separate physical connection (meter) fee 1"=$1,030 not the capacity fee.
    $2,949.25 one-time
Sewer$2,260.00 one-time
  • Sewer Development Fee (Town of Ponce Inlet / Port Orange) — 1 unit base
    City of Port Orange (sewer system; Town of Ponce Inlet bills)
    Appendix A Part XII(2)/(3), Res. 2024-21 (12/19/2024). Nonres sewer impact/capacity = $2,260.00/equivalent unit base + per-FU surcharge over 15 FU, plus $1,775 min service-connection charge if made after main. Some areas on septic. 1-unit base entered.
    $2,260.00 one-time
City$0.00
County$5.44/sq ft
Total (Ponce Inlet): $5.44/sq ft + $5,209.25 one-time (≈ $141,209.25 at 25,000 sq ft)

Where in Volusia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Ponce Inlet

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Ponce Inlet, Florida?

A new single-family home in Ponce Inlet pays $16,993.98 per unit in combined impact fees (rates sourced July 18, 2026).

How much are commercial impact fees in Ponce Inlet?

Commercial development in Ponce Inlet pays $6.44 per square foot in impact fees, plus $5,209.25 in one-time water and sewer connection fees, about $327,209.25 for a 50,000 sq ft building.

Does Ponce Inlet charge its own impact fees?

Yes. Ponce Inlet levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Ponce Inlet, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Volusia County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000