South Daytona, Florida Impact Fees

South Daytona applies its own fee schedule: municipal fees plus the Volusia County-levied fees that apply inside city limits. Combined, a new single-family home pays $17,914.27 per unit (rates sourced ). The full breakdown is below.

South Daytona impact fees by project type

South Daytona: Single-Family Impact Fees

A new single-family home in South Daytona pays $17,914.27 per unit in impact fees (rates sourced August 12, 2026). Of that, Volusia County-levied fees account for $13,200.67 and municipal or utility fees for $4,713.60.

The largest line items are County School Impact Fee (Volusia County) ($7,022.70), County Thoroughfare Road Impact Fee (Volusia County) ($5,464.00) and Water Connection Fee (South Daytona) ($2,266.06).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full South Daytona impact fee schedule
Water$2,266.06
  • Water Connection Fee (South Daytona)
    City of South Daytona
    South Daytona Code ch. 21 (Consolidated Fee Schedule), Sec. 21-21 Water connection fees, as amended in its entirety by Ord. No. 2025-15, Sec. 2(Att. A), adopted 9-23-25, effective 10/1/2025. 5/8-inch x 3/4-inch meter connection fee = $2,266.06 (1-inch $2,871.96, 1.5-inch $5,168.32, 2-inch $5,222.86). Connection charges increase annually by the BLS water/sewer/trash CPI for the 12 months ending June 30. Note a separate water impact fee also exists under Sec. 21-14 at $793.72 per single-family dwelling unit. 8/5/2026.
    $2,266.06
Sewer$545.31
  • Sewer Connection Fee (South Daytona)
    City of South Daytona
    South Daytona Code ch. 21, Sec. 21-25 Sanitary sewer connection charges (Ord. No. 2025-15, Sec. 2(Att. A), 9-23-25, effective 10/1/2025): Single Family Dwelling Units $545.31; Multifamily Units $545.31; developer subdivision sewer tap $428.79; half the charge where a private disposal system was previously in use. CPI-indexed annually. Separate sewer impact fee under Sec. 21-14 is $793.72 per dwelling unit. 8/5/2026.
    $545.31
City$1,902.23
  • Transportation Impact Fee
    City of South Daytona
    Ch. 21 Consolidated Fee Schedule; CPI-adjusted annually Oct 1 per Sec. 18-6 et seq.
    $838.00
  • Police Impact Fee
    City of South Daytona
    Ch. 21 Consolidated Fee Schedule; CPI-adjusted annually Oct 1 per Sec. 8.5-71(f). Spot-check found city fees missed by Volusia County FAQ.
    $685.78
  • Fire Impact Fee
    City of South Daytona
    Ch. 21 Consolidated Fee Schedule; CPI-adjusted annually Oct 1 per Sec. 8.5-62(f)
    $378.45
County$13,200.67
  • County School Impact Fee (Volusia County)
    Volusia County
    2026 Residential schedule, eff. 6/3/2026. $7,022.70 flat per SFD unit, all sizes. Countywide.
    $7,022.70
  • County Thoroughfare Road Impact Fee (Volusia County)
    SF Detached, 1,701-2,200 sq ft
    Volusia County
    2026 Volusia Residential Impact Fee Schedule, eff. 6/3/2026. County Thoroughfare Road Impact Fee (Volusia County) tiered by SFD heated floor area; this record = SF Detached, 1,701-2,200 sq ft. Applies countywide (unincorporated + every city). Source: volusia.org 2026-Residential schedule.
    $5,464.00
  • County Cultural/Rec District Park Impact Fee (Volusia County)
    SF Detached, 1,701-2,200 sq ft
    Volusia County
    2026 Volusia Residential Impact Fee Schedule, eff. 6/3/2026. County Cultural/Rec District Park Impact Fee (Volusia County) tiered by SFD heated floor area; this record = SF Detached, 1,701-2,200 sq ft. Applies countywide (unincorporated + every city). Source: volusia.org 2026-Residential schedule.
    $644.00
  • County EMS Impact Fee (Volusia County)
    SF Detached, 1,701-2,200 sq ft
    Volusia County
    2026 Volusia Residential Impact Fee Schedule, eff. 6/3/2026. County EMS Impact Fee (Volusia County) tiered by SFD heated floor area; this record = SF Detached, 1,701-2,200 sq ft. Applies countywide (unincorporated + every city). Source: volusia.org 2026-Residential schedule.
    $69.97
Total (South Daytona): $17,914.27
Sources last checked Official fee schedules:City of South Daytona Volusia County

South Daytona: Multifamily Impact Fees

A new multifamily unit in South Daytona pays $11,201.38 per unit in impact fees (rates sourced August 12, 2026). Of that, Volusia County-levied fees account for $6,802.36 and municipal or utility fees for $4,399.02.

The largest line items are County School Impact Fee (Volusia County) ($3,728.95), County Thoroughfare Road Impact Fee (Volusia County) ($2,489.00) and Water Connection Fee (South Daytona) ($2,266.06).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full South Daytona impact fee schedule
Water$2,266.06
  • Water Connection Fee (South Daytona)
    City of South Daytona
    South Daytona water capacity/impact fee per City Code §21-43 (equivalent-residential-unit basis; a pass-through of the City of Daytona Beach wholesale water capacity charge). Each dwelling unit = 1 ERU = $2,266.06 (matches SFR). Individually-metered units each pay per ERU; a master-metered building is sized by meter/ERU count.
    $2,266.06
Sewer$545.31
  • Sewer Connection Fee (South Daytona)
    City of South Daytona
    South Daytona Code ch. 21, Sec. 21-25 (Ord. No. 2025-15, effective 10/1/2025) lists 'Multifamily Units $545.31' as a per-unit sanitary sewer connection charge. Separate sewer impact fee of $793.72 per multifamily dwelling unit applies under Sec. 21-14. 8/5/2026.
    $545.31
City$1,587.65
  • Police Impact Fee
    City of South Daytona
    Ch. 21 Consolidated Fee Schedule; CPI-adjusted annually Oct 1 per Sec. 8.5-71(f). Spot-check found city fees missed by Volusia County FAQ.
    $685.78
  • Transportation Impact Fee
    City of South Daytona
    Ch. 21 Consolidated Fee Schedule; CPI-adjusted annually Oct 1 per Sec. 18-6 et seq. MF rate = Apartment per dwelling unit.
    $580.54
  • Fire Impact Fee
    City of South Daytona
    Ch. 21 Consolidated Fee Schedule; CPI-adjusted annually Oct 1 per Sec. 8.5-62(f)
    $321.33
County$6,802.36
  • County School Impact Fee (Volusia County)
    High-Rise
    Volusia County
    2026 Residential schedule, eff. 6/3/2026. School $3,728.95/unit flat across Duplex/Low-Rise/High-Rise (Mobile Home/RV Park $1,415.25 not modeled). Building-type tiers kept parallel to Road per schedule columns. Countywide.
    $3,728.95
  • County Thoroughfare Road Impact Fee (Volusia County)
    High-Rise
    Volusia County
    2026 Residential schedule, eff. 6/3/2026. MF Road by building type: Duplex $4,733; Low-Rise (≤3 stories) $3,700; High-Rise (4+ stories) $2,489. This = High-Rise. Mobile Home/RV Park $1,903 not modeled. Countywide.
    $2,489.00
  • County District/Coastal Park Impact Fee
    1,200 sq ft or less
    Volusia County
    2026 Residential schedule, eff. 6/3/2026. County District/Coastal Park Impact Fee: MF charged per unit using the SFD heated-area tier table; this record = 1,200 sq ft or less. Applies countywide (unincorporated + every city).
    $527.00
  • County EMS Impact Fee
    1,200 sq ft or less
    Volusia County
    2026 Residential schedule, eff. 6/3/2026. County EMS Impact Fee: MF charged per unit using the SFD heated-area tier table; this record = 1,200 sq ft or less. Applies countywide (unincorporated + every city).
    $57.41
Total (South Daytona): $11,201.38
Sources last checked Official fee schedules:City of South Daytona Volusia County

South Daytona: Commercial Impact Fees

Commercial development in South Daytona pays $9.01 per square foot in impact fees, plus $2,871.96 in one-time water and sewer connection fees (rates sourced August 12, 2026).

For a 50,000 sq ft building, that comes to at least $453,371.96. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (City of South Daytona) — 1" meter ($2,871.96 one-time), County Thoroughfare Road Impact Fee (South Daytona, Commercial) ($6.32/sq ft) and City Transportation Impact Fee (South Daytona, Commercial) ($1.31/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Impact Fee (City of South Daytona) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full South Daytona impact fee schedule
Water$2,871.96 one-time
Sewer$0.00
  • Sewer Impact Fee (City of South Daytona) — per fixture unit
    City of South Daytona
    Own utility. Sewer Impact Fee $82.55/fixture unit for all nonres (Sec. 21-14, Ord. 2025-15). PLUS a separate Sanitary Sewer Connection Charge $41.95/fixture (Sec. 21-25). Same fixture-unit basis as water impact fee.
    Contact jurisdiction/utility to verify
City$2.57/sq ft
County$6.44/sq ft
Total (South Daytona): $9.01/sq ft + $2,871.96 one-time (≈ $453,371.96 at 50,000 sq ft)
Sources last checked Official fee schedules:City of South Daytona Volusia County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Volusia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

South Daytona: Industrial Impact Fees

Industrial development in South Daytona pays $3.55 per square foot in impact fees, plus $2,871.96 in one-time water and sewer connection fees (rates sourced August 12, 2026).

For a 50,000 sq ft building, that comes to at least $180,371.96. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (City of South Daytona) — 1" meter ($2,871.96 one-time), County Thoroughfare Road Impact Fee (South Daytona, Industrial) ($2.42/sq ft) and City Transportation Impact Fee (South Daytona, Industrial) ($0.45/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Impact Fee (City of South Daytona) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full South Daytona impact fee schedule
Water$2,871.96 one-time
Sewer$0.00
  • Sewer Impact Fee (City of South Daytona) — per fixture unit
    City of South Daytona
    Own utility. Sewer Impact Fee $82.55/fixture unit for all nonres (Sec. 21-14, Ord. 2025-15). PLUS a separate Sanitary Sewer Connection Charge $41.95/fixture (Sec. 21-25). Same fixture-unit basis as water impact fee.
    Contact jurisdiction/utility to verify
City$1.11/sq ft
County$2.44/sq ft
Total (South Daytona): $3.55/sq ft + $2,871.96 one-time (≈ $180,371.96 at 50,000 sq ft)
Sources last checked Official fee schedules:City of South Daytona Volusia County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Volusia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

South Daytona: Office Impact Fees

Office development in South Daytona pays $7.59 per square foot in impact fees, plus $2,871.96 in one-time water and sewer connection fees (rates sourced August 12, 2026).

For a 25,000 sq ft building, that comes to at least $192,621.96. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (City of South Daytona) — 1" meter ($2,871.96 one-time), County Thoroughfare Road Impact Fee (South Daytona, Office) ($5.40/sq ft) and City Transportation Impact Fee (South Daytona, Office) ($0.89/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Impact Fee (City of South Daytona) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full South Daytona impact fee schedule
Water$2,871.96 one-time
Sewer$0.00
  • Sewer Impact Fee (City of South Daytona) — per fixture unit
    City of South Daytona
    Own utility. Sewer Impact Fee $82.55/fixture unit for all nonres (Sec. 21-14, Ord. 2025-15). PLUS a separate Sanitary Sewer Connection Charge $41.95/fixture (Sec. 21-25). Same fixture-unit basis as water impact fee.
    Contact jurisdiction/utility to verify
City$2.15/sq ft
County$5.44/sq ft
Total (South Daytona): $7.59/sq ft + $2,871.96 one-time (≈ $192,621.96 at 25,000 sq ft)
Sources last checked Official fee schedules:City of South Daytona Volusia County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Volusia County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

South Daytona impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

South Daytona impact fee FAQs

What are the total impact fees for a single-family home in South Daytona, Florida?

A new single-family home in South Daytona pays $17,914.27 per unit in combined impact fees (rates sourced August 12, 2026).

How much are commercial impact fees in South Daytona?

Commercial development in South Daytona pays $9.01 per square foot in impact fees, plus $2,871.96 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $453,371.96 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does South Daytona charge its own impact fees?

Yes. South Daytona levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in South Daytona, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Volusia County impact fees page.

Missing a jurisdiction? Get in touch.