South Daytona impact fees by project type
South Daytona: Single-Family Impact Fees
A new single-family home in South Daytona pays $17,914.27 per unit in impact fees (rates sourced August 12, 2026). Of that, Volusia County-levied fees account for $13,200.67 and municipal or utility fees for $4,713.60.
The largest line items are County School Impact Fee (Volusia County) ($7,022.70), County Thoroughfare Road Impact Fee (Volusia County) ($5,464.00) and Water Connection Fee (South Daytona) ($2,266.06).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full South Daytona impact fee schedule
- Water Connection Fee (South Daytona)$2,266.06City of South DaytonaSouth Daytona Code ch. 21 (Consolidated Fee Schedule), Sec. 21-21 Water connection fees, as amended in its entirety by Ord. No. 2025-15, Sec. 2(Att. A), adopted 9-23-25, effective 10/1/2025. 5/8-inch x 3/4-inch meter connection fee = $2,266.06 (1-inch $2,871.96, 1.5-inch $5,168.32, 2-inch $5,222.86). Connection charges increase annually by the BLS water/sewer/trash CPI for the 12 months ending June 30. Note a separate water impact fee also exists under Sec. 21-14 at $793.72 per single-family dwelling unit. 8/5/2026.
- Sewer Connection Fee (South Daytona)$545.31City of South DaytonaSouth Daytona Code ch. 21, Sec. 21-25 Sanitary sewer connection charges (Ord. No. 2025-15, Sec. 2(Att. A), 9-23-25, effective 10/1/2025): Single Family Dwelling Units $545.31; Multifamily Units $545.31; developer subdivision sewer tap $428.79; half the charge where a private disposal system was previously in use. CPI-indexed annually. Separate sewer impact fee under Sec. 21-14 is $793.72 per dwelling unit. 8/5/2026.
- Transportation Impact Fee$838.00City of South DaytonaCh. 21 Consolidated Fee Schedule; CPI-adjusted annually Oct 1 per Sec. 18-6 et seq.
- Police Impact Fee$685.78City of South DaytonaCh. 21 Consolidated Fee Schedule; CPI-adjusted annually Oct 1 per Sec. 8.5-71(f). Spot-check found city fees missed by Volusia County FAQ.
- Fire Impact Fee$378.45City of South DaytonaCh. 21 Consolidated Fee Schedule; CPI-adjusted annually Oct 1 per Sec. 8.5-62(f)
- County School Impact Fee (Volusia County)$7,022.70Volusia County2026 Residential schedule, eff. 6/3/2026. $7,022.70 flat per SFD unit, all sizes. Countywide.
- County Thoroughfare Road Impact Fee (Volusia County)$5,464.00SF Detached, 1,701-2,200 sq ftVolusia County2026 Volusia Residential Impact Fee Schedule, eff. 6/3/2026. County Thoroughfare Road Impact Fee (Volusia County) tiered by SFD heated floor area; this record = SF Detached, 1,701-2,200 sq ft. Applies countywide (unincorporated + every city). Source: volusia.org 2026-Residential schedule.
- County Cultural/Rec District Park Impact Fee (Volusia County)$644.00SF Detached, 1,701-2,200 sq ftVolusia County2026 Volusia Residential Impact Fee Schedule, eff. 6/3/2026. County Cultural/Rec District Park Impact Fee (Volusia County) tiered by SFD heated floor area; this record = SF Detached, 1,701-2,200 sq ft. Applies countywide (unincorporated + every city). Source: volusia.org 2026-Residential schedule.
- County EMS Impact Fee (Volusia County)$69.97SF Detached, 1,701-2,200 sq ftVolusia County2026 Volusia Residential Impact Fee Schedule, eff. 6/3/2026. County EMS Impact Fee (Volusia County) tiered by SFD heated floor area; this record = SF Detached, 1,701-2,200 sq ft. Applies countywide (unincorporated + every city). Source: volusia.org 2026-Residential schedule.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
South Daytona: Multifamily Impact Fees
A new multifamily unit in South Daytona pays $11,201.38 per unit in impact fees (rates sourced August 12, 2026). Of that, Volusia County-levied fees account for $6,802.36 and municipal or utility fees for $4,399.02.
The largest line items are County School Impact Fee (Volusia County) ($3,728.95), County Thoroughfare Road Impact Fee (Volusia County) ($2,489.00) and Water Connection Fee (South Daytona) ($2,266.06).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full South Daytona impact fee schedule
- Water Connection Fee (South Daytona)$2,266.06City of South DaytonaSouth Daytona water capacity/impact fee per City Code §21-43 (equivalent-residential-unit basis; a pass-through of the City of Daytona Beach wholesale water capacity charge). Each dwelling unit = 1 ERU = $2,266.06 (matches SFR). Individually-metered units each pay per ERU; a master-metered building is sized by meter/ERU count.
- Sewer Connection Fee (South Daytona)$545.31City of South DaytonaSouth Daytona Code ch. 21, Sec. 21-25 (Ord. No. 2025-15, effective 10/1/2025) lists 'Multifamily Units $545.31' as a per-unit sanitary sewer connection charge. Separate sewer impact fee of $793.72 per multifamily dwelling unit applies under Sec. 21-14. 8/5/2026.
- Police Impact Fee$685.78City of South DaytonaCh. 21 Consolidated Fee Schedule; CPI-adjusted annually Oct 1 per Sec. 8.5-71(f). Spot-check found city fees missed by Volusia County FAQ.
- Transportation Impact Fee$580.54City of South DaytonaCh. 21 Consolidated Fee Schedule; CPI-adjusted annually Oct 1 per Sec. 18-6 et seq. MF rate = Apartment per dwelling unit.
- Fire Impact Fee$321.33City of South DaytonaCh. 21 Consolidated Fee Schedule; CPI-adjusted annually Oct 1 per Sec. 8.5-62(f)
- County School Impact Fee (Volusia County)$3,728.95High-RiseVolusia County2026 Residential schedule, eff. 6/3/2026. School $3,728.95/unit flat across Duplex/Low-Rise/High-Rise (Mobile Home/RV Park $1,415.25 not modeled). Building-type tiers kept parallel to Road per schedule columns. Countywide.
- County Thoroughfare Road Impact Fee (Volusia County)$2,489.00High-RiseVolusia County2026 Residential schedule, eff. 6/3/2026. MF Road by building type: Duplex $4,733; Low-Rise (≤3 stories) $3,700; High-Rise (4+ stories) $2,489. This = High-Rise. Mobile Home/RV Park $1,903 not modeled. Countywide.
- County District/Coastal Park Impact Fee$527.001,200 sq ft or lessVolusia County2026 Residential schedule, eff. 6/3/2026. County District/Coastal Park Impact Fee: MF charged per unit using the SFD heated-area tier table; this record = 1,200 sq ft or less. Applies countywide (unincorporated + every city).
- County EMS Impact Fee$57.411,200 sq ft or lessVolusia County2026 Residential schedule, eff. 6/3/2026. County EMS Impact Fee: MF charged per unit using the SFD heated-area tier table; this record = 1,200 sq ft or less. Applies countywide (unincorporated + every city).
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
South Daytona: Commercial Impact Fees
Commercial development in South Daytona pays $9.01 per square foot in impact fees, plus $2,871.96 in one-time water and sewer connection fees (rates sourced August 12, 2026).
For a 50,000 sq ft building, that comes to at least $453,371.96. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of South Daytona) — 1" meter ($2,871.96 one-time), County Thoroughfare Road Impact Fee (South Daytona, Commercial) ($6.32/sq ft) and City Transportation Impact Fee (South Daytona, Commercial) ($1.31/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (City of South Daytona) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full South Daytona impact fee schedule
- Water Connection Fee (City of South Daytona) — 1" meter$2,871.96 one-timeCity of South DaytonaOwn utility. Sec. 21-21, Ord. 2025-15 eff. 10/1/2025. Canonical 1" meter default. Separate $82.55/FU water impact fee (Sec. 21-14) + $41.95/FU surcharge also apply.
- Sewer Impact Fee (City of South Daytona) — per fixture unitContact jurisdiction/utility to verifyCity of South DaytonaOwn utility. Sewer Impact Fee $82.55/fixture unit for all nonres (Sec. 21-14, Ord. 2025-15). PLUS a separate Sanitary Sewer Connection Charge $41.95/fixture (Sec. 21-25). Same fixture-unit basis as water impact fee.
- City Transportation Impact Fee (South Daytona, Commercial)$1.31/sq ftCity of South DaytonaConsolidated Fee Schedule Ch. 21, Ord. 2025-15, eff. 10/1/2025 (CPI-indexed each Oct 1). Sec. 21-13. Per gross sf. Row: Retail 10,000-99,999 sf. Parks residential-only.
- City Fire Impact Fee (South Daytona, Commercial)$0.82/sq ftCity of South DaytonaFire impact fee, Sec. 21-16, Ord. 2025-15. PSF. Commercial rate (also applies to office; Institutional $0.50).
- City Police Impact Fee (South Daytona, Commercial)$0.44/sq ftCity of South DaytonaPolice impact fee, Sec. 21-17, Ord. 2025-15. Single flat PSF rate for all nonres.
- County Thoroughfare Road Impact Fee (South Daytona, Commercial)$6.32/sq ftVolusia CountyVolusia County overlay; Road + EMS countywide.
- County EMS Impact Fee (South Daytona, Commercial)$0.12/sq ftVolusia CountyVolusia County EMS overlay; countywide.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
South Daytona: Industrial Impact Fees
Industrial development in South Daytona pays $3.55 per square foot in impact fees, plus $2,871.96 in one-time water and sewer connection fees (rates sourced August 12, 2026).
For a 50,000 sq ft building, that comes to at least $180,371.96. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of South Daytona) — 1" meter ($2,871.96 one-time), County Thoroughfare Road Impact Fee (South Daytona, Industrial) ($2.42/sq ft) and City Transportation Impact Fee (South Daytona, Industrial) ($0.45/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (City of South Daytona) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full South Daytona impact fee schedule
- Water Connection Fee (City of South Daytona) — 1" meter$2,871.96 one-timeCity of South DaytonaOwn utility. Sec. 21-21, Ord. 2025-15 eff. 10/1/2025. Canonical 1" meter default. Separate $82.55/FU water impact fee (Sec. 21-14) + $41.95/FU surcharge also apply.
- Sewer Impact Fee (City of South Daytona) — per fixture unitContact jurisdiction/utility to verifyCity of South DaytonaOwn utility. Sewer Impact Fee $82.55/fixture unit for all nonres (Sec. 21-14, Ord. 2025-15). PLUS a separate Sanitary Sewer Connection Charge $41.95/fixture (Sec. 21-25). Same fixture-unit basis as water impact fee.
- City Transportation Impact Fee (South Daytona, Industrial)$0.45/sq ftCity of South DaytonaOrd. 2025-15, Sec. 21-13. Row: Light industry (Manufacturing $0.26, Warehouse $0.32).
- City Police Impact Fee (South Daytona, Industrial)$0.44/sq ftCity of South DaytonaSec. 21-17. Single flat nonres rate (commercial/light industrial).
- City Fire Impact Fee (South Daytona, Industrial)$0.22/sq ftCity of South DaytonaSec. 21-16. Industrial/warehouse row.
- County Thoroughfare Road Impact Fee (South Daytona, Industrial)$2.42/sq ftVolusia CountyVolusia County overlay; countywide.
- County EMS Impact Fee (South Daytona, Industrial)$0.02/sq ftVolusia CountyVolusia County EMS overlay; countywide.
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
South Daytona: Office Impact Fees
Office development in South Daytona pays $7.59 per square foot in impact fees, plus $2,871.96 in one-time water and sewer connection fees (rates sourced August 12, 2026).
For a 25,000 sq ft building, that comes to at least $192,621.96. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of South Daytona) — 1" meter ($2,871.96 one-time), County Thoroughfare Road Impact Fee (South Daytona, Office) ($5.40/sq ft) and City Transportation Impact Fee (South Daytona, Office) ($0.89/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (City of South Daytona) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full South Daytona impact fee schedule
- Water Connection Fee (City of South Daytona) — 1" meter$2,871.96 one-timeCity of South DaytonaOwn utility. Sec. 21-21, Ord. 2025-15 eff. 10/1/2025. Canonical 1" meter default. Separate $82.55/FU water impact fee (Sec. 21-14) + $41.95/FU surcharge also apply.
- Sewer Impact Fee (City of South Daytona) — per fixture unitContact jurisdiction/utility to verifyCity of South DaytonaOwn utility. Sewer Impact Fee $82.55/fixture unit for all nonres (Sec. 21-14, Ord. 2025-15). PLUS a separate Sanitary Sewer Connection Charge $41.95/fixture (Sec. 21-25). Same fixture-unit basis as water impact fee.
- City Transportation Impact Fee (South Daytona, Office)$0.89/sq ftOver 10,000 SFCity of South DaytonaOrd. 2025-15, Sec. 21-13. Row: Office over 10,000 GSF (under 10k=$1.63).
- City Fire Impact Fee (South Daytona, Office)$0.82/sq ftCity of South DaytonaSec. 21-16. Office falls under Commercial rate.
- City Police Impact Fee (South Daytona, Office)$0.44/sq ftCity of South DaytonaSec. 21-17. Single flat nonres rate.
- County Thoroughfare Road Impact Fee (South Daytona, Office)$5.40/sq ftVolusia CountyVolusia County overlay; countywide.
- $0.04/sq ft
Where in Volusia County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
South Daytona impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
South Daytona impact fee FAQs
What are the total impact fees for a single-family home in South Daytona, Florida?
A new single-family home in South Daytona pays $17,914.27 per unit in combined impact fees (rates sourced August 12, 2026).
How much are commercial impact fees in South Daytona?
Commercial development in South Daytona pays $9.01 per square foot in impact fees, plus $2,871.96 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $453,371.96 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does South Daytona charge its own impact fees?
Yes. South Daytona levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in South Daytona, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Volusia County impact fees page.