South Daytona Impact Fees by Project Type
South Daytona: Single-Family Impact Fees
A new single-family home in South Daytona pays $17,914.27 per unit in impact fees (rates sourced August 21, 2026). Of that, Volusia County-levied fees account for $13,200.67 and municipal or utility fees for $4,713.60.
The largest line items are County School Impact Fee (Volusia County) ($7,022.70), County Thoroughfare Road Impact Fee (Volusia County) ($5,464.00) and Water Connection Fee (South Daytona) ($2,266.06).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full South Daytona Impact Fee Schedule
- Water Connection Fee (South Daytona)$2,266.06City of South DaytonaThe City of South Daytona charges a water connection fee based on meter size; the smallest residential service, a 5/8-inch by 3/4-inch meter, is $2,266.06. The schedule took effect October 1, 2025 and connection charges rise each year with the federal consumer price index for water, sewer and trash services. A separate water impact fee of $793.72 per dwelling unit is also charged.
- Sewer Connection Fee (South Daytona)$545.31City of South DaytonaThe City of South Daytona charges a sanitary sewer connection charge of $545.31 for a single-family dwelling unit, effective October 1, 2025 and indexed each year to the federal consumer price index for water, sewer and trash services. A separate sewer impact fee of $793.72 per dwelling unit is also charged.
- Transportation Impact Fee$838.00City of South DaytonaCity of South Daytona Transportation Impact Fee — $838 per single-family home.
- Police Impact Fee$685.78City of South DaytonaCity of South Daytona Police Impact Fee — $685.78 per single-family home.
- Fire Impact Fee$378.45City of South DaytonaCity of South Daytona Fire Impact Fee — $378.45 per single-family home.
- County School Impact Fee (Volusia County)$7,022.70Volusia CountyVolusia County School impact fee — 2026 Residential schedule, effective June 3, 2026. $7,022.70 per single-family unit, flat across all home sizes. Applies countywide.
- County Thoroughfare Road Impact Fee (Volusia County)$5,464.00SF Detached, 1,701-2,200 sq ftVolusia CountyVolusia County Thoroughfare (Transportation) Road impact fee — 2026 Residential schedule, effective June 3, 2026. Detached single-family, tiered by heated floor area: ≤1,200 sq ft $4,864; 1,201–1,700 $5,097; 1,701–2,200 $5,464; 2,201–3,000 $5,835; over 3,000 $6,215. Amount shown is the 1,701–2,200 sq ft tier. Applies countywide (unincorporated + every city).
- County Cultural/Rec District Park Impact Fee (Volusia County)$644.00SF Detached, 1,701-2,200 sq ftVolusia CountyVolusia County Cultural/Recreational District/Coastal Park impact fee — 2026 Residential schedule, effective June 3, 2026. Detached single-family, tiered by heated floor area: ≤1,200 sq ft $527; 1,201–1,700 $606; 1,701–2,200 $644; 2,201–3,000 $675; over 3,000 $742. Amount shown is the 1,701–2,200 sq ft tier. Applies countywide (unincorporated + every city).
- County EMS Impact Fee (Volusia County)$69.97SF Detached, 1,701-2,200 sq ftVolusia CountyVolusia County EMS impact fee — 2026 Residential schedule, effective June 3, 2026. Detached single-family, tiered by heated floor area: ≤1,200 sq ft $57.41; 1,201–1,700 $65.93; 1,701–2,200 $69.97; 2,201–3,000 $73.55; over 3,000 $80.73. Amount shown is the 1,701–2,200 sq ft tier. Applies countywide (unincorporated + every city).
Where in Volusia County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours.
South Daytona: Multifamily Impact Fees
A new multifamily unit in South Daytona pays $11,201.38 per unit in impact fees (rates sourced August 21, 2026). Of that, Volusia County-levied fees account for $6,802.36 and municipal or utility fees for $4,399.02.
The largest line items are County School Impact Fee (Volusia County) ($3,728.95), County Thoroughfare Road Impact Fee (Volusia County) ($2,489.00) and Water Connection Fee (South Daytona) ($2,266.06).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full South Daytona Impact Fee Schedule
- Water Connection Fee (South Daytona)$2,266.06City of South DaytonaCity of South Daytona water capacity (impact) fee — $2,266.06 per equivalent residential unit (each dwelling unit = 1 ERU) under City Code §21-43; reflects the City of Daytona Beach wholesale water capacity charge passed through to new connections.
- Sewer Connection Fee (South Daytona)$545.31City of South DaytonaThe City of South Daytona charges a sanitary sewer connection charge of $545.31 per multifamily unit, effective October 1, 2025 and indexed each year to the federal consumer price index for water, sewer and trash services. A separate sewer impact fee of $793.72 per dwelling unit is also charged.
- Police Impact Fee$685.78City of South DaytonaCity of South Daytona Police Impact Fee — $685.78 per dwelling unit.
- Transportation Impact Fee$580.54City of South DaytonaCity of South Daytona Transportation Impact Fee — $580.54 per dwelling unit.
- Fire Impact Fee$321.33City of South DaytonaCity of South Daytona Fire Impact Fee — $321.33 per dwelling unit.
- County School Impact Fee (Volusia County)$3,728.95High-RiseVolusia CountyVolusia County School impact fee, multifamily — 2026 Residential schedule, effective June 3, 2026. $3,728.95 per unit, flat across duplex, low-rise and high-rise. Applies countywide.
- County Thoroughfare Road Impact Fee (Volusia County)$2,489.00High-RiseVolusia CountyVolusia County Thoroughfare (Transportation) Road impact fee, multifamily — 2026 Residential schedule, effective June 3, 2026. Per unit by building type: duplex $4,733; low-rise (3 stories or less) $3,700; high-rise (4+ stories) $2,489. Amount shown is high-rise (the canonical 4-story unit). Mobile home/RV park $1,903 not modeled. Applies countywide.
- County District/Coastal Park Impact Fee$527.001,200 sq ft or lessVolusia CountyVolusia County Cultural/Recreational District/Coastal Park impact fee, multifamily — 2026 Residential schedule, effective June 3, 2026. Charged per unit by heated floor area using the residential tier table; amount shown is the ≤1,200 sq ft tier (canonical ~1,000 sq ft unit), rising with unit size. Applies countywide (unincorporated + every city).
- County EMS Impact Fee$57.411,200 sq ft or lessVolusia CountyVolusia County EMS impact fee, multifamily — 2026 Residential schedule, effective June 3, 2026. Charged per unit by heated floor area using the residential tier table; amount shown is the ≤1,200 sq ft tier (canonical ~1,000 sq ft unit), rising with unit size. Applies countywide (unincorporated + every city).
Where in Volusia County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours.
South Daytona: Commercial Impact Fees
Commercial development in South Daytona pays $9.01 per square foot in impact fees, plus $2,871.96 in one-time water and sewer connection fees (rates sourced August 21, 2026).
For a 50,000 sq ft building, that comes to at least $453,371.96. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of South Daytona) — 1" meter ($2,871.96 one-time), County Thoroughfare Road Impact Fee (South Daytona, Commercial) ($6.32/sq ft) and City Transportation Impact Fee (South Daytona, Commercial) ($1.31/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (City of South Daytona) — per fixture unit and Sewer Impact Fee (City of South Daytona) — per fixture unit are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full South Daytona Impact Fee Schedule
- Water Connection Fee (City of South Daytona) — 1" meter$2,871.96 one-timeCity of South DaytonaMeter-based connection fee; the 1-inch rate is shown as representative. A separate per-fixture-unit water impact fee also applies. CPI-indexed each October 1.
- Water Impact Fee (City of South Daytona) — per fixture unitContact jurisdiction/utility to verifyCharged per fixture unit; a separate meter-size water connection fee also applies. Same fixture-unit basis as the sewer impact fee. CPI-indexed each October 1.
- Sewer Impact Fee (City of South Daytona) — per fixture unitContact jurisdiction/utility to verifyCity of South DaytonaCharged per fixture unit; a separate per-fixture sanitary sewer connection charge also applies. Same fixture-unit basis as the water impact fee. CPI-indexed each October 1.
- City Transportation Impact Fee (South Daytona, Commercial)$1.31/sq ftRetail 10,000–99,999 SFCity of South DaytonaRate applies to retail 10,000–99,999 sf (contains the 50,000 sf reference size). Other retail sizes pay different rates. Per sq ft of gross floor area. CPI-indexed each October 1.
- City Fire Impact Fee (South Daytona, Commercial)$0.82/sq ftCity of South Daytona
- City Police Impact Fee (South Daytona, Commercial)$0.44/sq ftCity of South Daytona
- $6.32/sq ft
- County EMS Impact Fee (South Daytona, Commercial)$0.12/sq ftVolusia County
Where in Volusia County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
South Daytona: Industrial Impact Fees
Industrial development in South Daytona pays $3.55 per square foot in impact fees, plus $2,871.96 in one-time water and sewer connection fees (rates sourced August 21, 2026).
For a 50,000 sq ft building, that comes to at least $180,371.96. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of South Daytona) — 1" meter ($2,871.96 one-time), County Thoroughfare Road Impact Fee (South Daytona, Industrial) ($2.42/sq ft) and City Transportation Impact Fee (South Daytona, Industrial) ($0.45/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (City of South Daytona) — per fixture unit and Sewer Impact Fee (City of South Daytona) — per fixture unit are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full South Daytona Impact Fee Schedule
- Water Connection Fee (City of South Daytona) — 1" meter$2,871.96 one-timeCity of South DaytonaMeter-based connection fee; the 1-inch rate is shown as representative. A separate per-fixture-unit water impact fee also applies. CPI-indexed each October 1.
- Water Impact Fee (City of South Daytona) — per fixture unitContact jurisdiction/utility to verifyCharged per fixture unit; a separate meter-size water connection fee also applies. Same fixture-unit basis as the sewer impact fee. CPI-indexed each October 1.
- Sewer Impact Fee (City of South Daytona) — per fixture unitContact jurisdiction/utility to verifyCity of South DaytonaCharged per fixture unit; a separate per-fixture sanitary sewer connection charge also applies. Same fixture-unit basis as the water impact fee. CPI-indexed each October 1.
- City Transportation Impact Fee (South Daytona, Industrial)$0.45/sq ftCity of South DaytonaRate applies to general light industry; manufacturing and warehouse uses are assessed at different rates. CPI-indexed each October 1.
- City Police Impact Fee (South Daytona, Industrial)$0.44/sq ftCity of South Daytona
- City Fire Impact Fee (South Daytona, Industrial)$0.22/sq ftCity of South Daytona
- $2.42/sq ft
- County EMS Impact Fee (South Daytona, Industrial)$0.02/sq ftVolusia County
Where in Volusia County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
South Daytona: Office Impact Fees
Office development in South Daytona pays $7.59 per square foot in impact fees, plus $2,871.96 in one-time water and sewer connection fees (rates sourced August 21, 2026).
For a 25,000 sq ft building, that comes to at least $192,621.96. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of South Daytona) — 1" meter ($2,871.96 one-time), County Thoroughfare Road Impact Fee (South Daytona, Office) ($5.40/sq ft) and City Transportation Impact Fee (South Daytona, Office) ($0.89/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (City of South Daytona) — per fixture unit and Sewer Impact Fee (City of South Daytona) — per fixture unit are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full South Daytona Impact Fee Schedule
- Water Connection Fee (City of South Daytona) — 1" meter$2,871.96 one-timeCity of South DaytonaMeter-based connection fee; the 1-inch rate is shown as representative. A separate per-fixture-unit water impact fee also applies. CPI-indexed each October 1.
- Water Impact Fee (City of South Daytona) — per fixture unitContact jurisdiction/utility to verifyCharged per fixture unit; a separate meter-size water connection fee also applies. Same fixture-unit basis as the sewer impact fee. CPI-indexed each October 1.
- Sewer Impact Fee (City of South Daytona) — per fixture unitContact jurisdiction/utility to verifyCity of South DaytonaCharged per fixture unit; a separate per-fixture sanitary sewer connection charge also applies. Same fixture-unit basis as the water impact fee. CPI-indexed each October 1.
- City Transportation Impact Fee (South Daytona, Office)$0.89/sq ftOver 10,000 SFCity of South DaytonaRate applies to office over 10,000 sf. Offices 10,000 sf or under pay a higher per-sq-ft rate. CPI-indexed each October 1.
- City Fire Impact Fee (South Daytona, Office)$0.82/sq ftCity of South Daytona
- City Police Impact Fee (South Daytona, Office)$0.44/sq ftCity of South Daytona
- $5.40/sq ft
- County EMS Impact Fee (South Daytona, Office)$0.04/sq ftVolusia County
Where in Volusia County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
South Daytona Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
South Daytona Impact Fee FAQs
What are the total impact fees for a single-family home in South Daytona, Florida?
A new single-family home in South Daytona pays $17,914.27 per unit in combined impact fees (rates sourced August 21, 2026).
How much are commercial impact fees in South Daytona?
Commercial development in South Daytona pays $9.01 per square foot in impact fees, plus $2,871.96 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $453,371.96 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does South Daytona charge its own impact fees?
Yes. South Daytona levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in South Daytona, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Volusia County impact fees page.