A new single-family home in unincorporated Bexar County pays $11,528.00 per unit in impact fees (rates sourced October 29, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (SAWS) — High Elevation ($5,987.00) and Wastewater Impact Fee (SAWS) — Upper Collection Zone ($5,541.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Bexar County Impact Fee Schedule
- Water Impact Fee (SAWS) — High Elevation$5,987.00San Antonio Water System (SAWS)SAWS water impact fee (highest of three elevation zones), effective July 1, 2024, per EDU. SAWS serves much of unincorporated Bexar; other parcels use MUDs, SUDs, WSCs, or private wells. Amount = flat water supply + delivery flow + system development by elevation zone; Low and Middle zones are lower.
- Wastewater Impact Fee (SAWS) — Upper Collection Zone$5,541.00San Antonio Water System (SAWS)SAWS wastewater impact fee (highest of the service-area combinations, Upper Collection), effective July 1, 2024, per EDU. Many rural unincorporated parcels use septic instead. Amount = treatment + collection charge by drainage service area; other areas are lower.
- City Impact Fees (Bexar County - Unincorporated)$0.00Bexar CountyNo municipal impact fees apply in unincorporated Bexar County.
- County Impact Fees (Bexar County)$0.00Bexar CountyTexas counties cannot charge impact fees on new development except a storm water and drainage fee in a county of 3.3 million or more people or one bordering such a county; Bexar County does not qualify and levies none.
Where in Bexar County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Bexar County: Multifamily Impact Fees
A new multifamily unit in unincorporated Bexar County pays $5,764.00 per unit in impact fees (rates sourced October 29, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (SAWS, MF) — High Elevation ($2,993.50) and Wastewater Impact Fee (SAWS, MF) — Upper Collection Zone ($2,770.50).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Bexar County Impact Fee Schedule
- Water Impact Fee (SAWS, MF) — High Elevation$2,993.50SAWS, High ElevationSan Antonio Water System (SAWS)SAWS water impact fee (highest of three elevation zones), effective July 1, 2024; a master-metered apartment unit is assessed 0.5 EDU (half the single-family fee), while individually metered apartments, condominiums and townhomes pay by meter size. Low and Middle zones are lower.
- Wastewater Impact Fee (SAWS, MF) — Upper Collection Zone$2,770.50SAWS, Upper Collection ZoneSan Antonio Water System (SAWS)SAWS wastewater impact fee (highest of the service-area combinations, Upper Collection), effective July 1, 2024; a master-metered apartment unit is assessed 0.5 EDU (half the single-family fee), while individually metered units pay by meter size. Other areas are lower.
- City Impact Fees (Bexar County - Unincorporated, MF)$0.00Bexar CountyNo municipal impact fees apply in unincorporated Bexar County.
- County Impact Fees (Bexar County, MF)$0.00Bexar CountyTexas counties cannot charge impact fees on new development except a storm water and drainage fee in a county of 3.3 million or more people or one bordering such a county; Bexar County does not qualify and levies none.
Where in Bexar County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Bexar County: Commercial Impact Fees
Commercial development in unincorporated Bexar County pays no per-square-foot impact fees, but owes $17,515.00 in one-time water and sewer connection fees (rates sourced October 29, 2026).
For a 50,000 sq ft building, that comes to about $17,515.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (SAWS) — High Elevation, 1" ($11,974.00 one-time) and Wastewater Impact Fee (SAWS) — Upper Collection Zone ($5,541.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Bexar County Impact Fee Schedule
- Water Impact Fee (SAWS) — High Elevation, 1"$11,974.00 one-timeSan Antonio Water System (SAWS)SAWS water impact fee for plats recorded on or after July 1, 2024, charged by meter size: a 1 inch meter counts as 2 equivalent dwelling units at $5,987 each (supply, flow and system development components). High Elevation is the highest of three elevation zones; Low and Middle zones pay less. Atascosa Rural WSC, Green Valley SUD and East Central SUD serve other parts of unincorporated Bexar County, and some parcels use private wells. Service line installation is billed separately at cost.
- Wastewater Impact Fee (SAWS) — Upper Collection Zone$5,541.00 one-timeSan Antonio Water System (SAWS)SAWS wastewater impact fee for plats recorded on or after July 1, 2024: $5,541 per equivalent dwelling unit (collection plus treatment) in the Upper Collection area, the highest of six service areas. Each connection pays at least 1 unit; SAWS sets the unit count for nonresidential projects from projected wastewater demand at 200 gallons per day per unit. Parcels on septic pay no SAWS wastewater fee.
- City Impact Fee (Bexar County - Unincorporated, Commercial)$0.00Bexar CountyThis is unincorporated county land with no municipal government, so no city impact fees apply.
- County Impact Fee (Bexar County, Commercial)$0.00Bexar CountyBexar County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Bexar County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Bexar County: Industrial Impact Fees
Industrial development in unincorporated Bexar County pays no per-square-foot impact fees, but owes $17,515.00 in one-time water and sewer connection fees (rates sourced October 29, 2026).
For a 50,000 sq ft building, that comes to about $17,515.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (SAWS) — High Elevation, 1" ($11,974.00 one-time) and Wastewater Impact Fee (SAWS) — Upper Collection Zone ($5,541.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Bexar County Impact Fee Schedule
- Water Impact Fee (SAWS) — High Elevation, 1"$11,974.00 one-timeSan Antonio Water System (SAWS)SAWS water impact fee for plats recorded on or after July 1, 2024, charged by meter size: a 1 inch meter counts as 2 equivalent dwelling units at $5,987 each (supply, flow and system development components). High Elevation is the highest of three elevation zones; Low and Middle zones pay less. Atascosa Rural WSC, Green Valley SUD and East Central SUD serve other parts of unincorporated Bexar County, and some parcels use private wells. Service line installation is billed separately at cost.
- Wastewater Impact Fee (SAWS) — Upper Collection Zone$5,541.00 one-timeSan Antonio Water System (SAWS)SAWS wastewater impact fee for plats recorded on or after July 1, 2024: $5,541 per equivalent dwelling unit (collection plus treatment) in the Upper Collection area, the highest of six service areas. Each connection pays at least 1 unit; SAWS sets the unit count for nonresidential projects from projected wastewater demand at 200 gallons per day per unit. Parcels on septic pay no SAWS wastewater fee.
- City Impact Fee (Bexar County - Unincorporated, Industrial)$0.00Bexar CountyThis is unincorporated county land with no municipal government, so no city impact fees apply.
- County Impact Fee (Bexar County, Industrial)$0.00Bexar CountyBexar County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Bexar County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Bexar County: Office Impact Fees
Office development in unincorporated Bexar County pays no per-square-foot impact fees, but owes $17,515.00 in one-time water and sewer connection fees (rates sourced October 29, 2026).
For a 25,000 sq ft building, that comes to about $17,515.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (SAWS) — High Elevation, 1" ($11,974.00 one-time) and Wastewater Impact Fee (SAWS) — Upper Collection Zone ($5,541.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Bexar County Impact Fee Schedule
- Water Impact Fee (SAWS) — High Elevation, 1"$11,974.00 one-timeSan Antonio Water System (SAWS)SAWS water impact fee for plats recorded on or after July 1, 2024, charged by meter size: a 1 inch meter counts as 2 equivalent dwelling units at $5,987 each (supply, flow and system development components). High Elevation is the highest of three elevation zones; Low and Middle zones pay less. Atascosa Rural WSC, Green Valley SUD and East Central SUD serve other parts of unincorporated Bexar County, and some parcels use private wells. Service line installation is billed separately at cost.
- Wastewater Impact Fee (SAWS) — Upper Collection Zone$5,541.00 one-timeSan Antonio Water System (SAWS)SAWS wastewater impact fee for plats recorded on or after July 1, 2024: $5,541 per equivalent dwelling unit (collection plus treatment) in the Upper Collection area, the highest of six service areas. Each connection pays at least 1 unit; SAWS sets the unit count for nonresidential projects from projected wastewater demand at 200 gallons per day per unit. Parcels on septic pay no SAWS wastewater fee.
- City Impact Fee (Bexar County - Unincorporated, Office)$0.00Bexar CountyThis is unincorporated county land with no municipal government, so no city impact fees apply.
- County Impact Fee (Bexar County, Office)$0.00Bexar CountyBexar County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Bexar County Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Bexar County Impact Fee FAQs
What are single-family impact fees in Bexar County, Texas?
A new single-family home in unincorporated Bexar County pays $11,528.00 per unit in impact fees (rates sourced October 29, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.
How much are multifamily impact fees in Bexar County?
Multifamily development in unincorporated Bexar County pays $5,764.00 per unit in impact fees (rates sourced October 29, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.
How much are commercial impact fees in Bexar County?
Commercial development in unincorporated Bexar County pays no per-square-foot impact fees, but owes $17,515.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Timberwood Park pay Bexar County impact fees?
Timberwood Park is unincorporated, so the Bexar County charges on this page apply there. In Texas the city whose extraterritorial jurisdiction covers a site can charge water, wastewater and drainage impact fees there, and a utility district can charge its own fees, so new construction outside city limits may still owe them. Search a specific address in the calculator below to confirm it sits outside every city limit.
Do cities in Bexar County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 24 of 26 cities in Bexar County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.