Alamo Heights Impact Fees by Project Type
Alamo Heights: Single-Family Impact Fees
A new single-family home in Alamo Heights pays at least $1,500.00 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Service Installation Charge (City of Alamo Heights) — 5/8" meter ($1,000.00) and Water Impact Fee (City of Alamo Heights) ($500.00).
Sewer Impact Fee (City of Alamo Heights) is set by the utility and not published online. Stormwater Development Fee (City of Alamo Heights) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Alamo Heights Impact Fee Schedule
- Water Service Installation Charge (City of Alamo Heights) — 5/8" meter$1,000.00City of Alamo HeightsCity of Alamo Heights water service line installation charge for a new connection, set by meter size: $1,000 for a 5/8 in. meter up to $1,450 for a 2 in. meter. Meters 3 in. and larger, and any main extension, are billed at time and materials. Charged in addition to the $500 water impact fee.
- Water Impact Fee (City of Alamo Heights)$500.00City of Alamo HeightsCity water impact fee: $500 per additional effective water connection (Ord. 1812, effective Feb 23, 2009). The city runs its own water utility; separate water tap/service-line charges apply by meter size ($1,000 at 5/8" up to $1,450 at 2").
- Sewer Impact Fee (City of Alamo Heights)Requires confirmationCity of Alamo Heights (SAWS treatment)The city operates the sewer collection system; wastewater is treated by SAWS. No separate city sewer impact or tap fee is published.
- City Impact Fees (Alamo Heights)$0.00City of Alamo HeightsAlamo Heights charges no roadway impact fee and no parkland fee-in-lieu. Its water impact fee, water service installation charge and stormwater development fee are listed separately.
- Stormwater Development Fee (City of Alamo Heights)Requires confirmationCity of Alamo HeightsAlamo Heights charges a one-time stormwater development fee of $0.40 per square foot of added impervious cover (half that rate, $0.20, for a new home on a vacant residential lot). The amount depends on the site plan, so it is not included in the total.
- County Impact Fees (Bexar County)$0.00Bexar CountyTexas counties cannot charge impact fees on new development except a storm water and drainage fee in a county of 3.3 million or more people or one bordering such a county; Bexar County does not qualify and levies none.
Where in Bexar County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Alamo Heights: Multifamily Impact Fees
A new multifamily unit in Alamo Heights pays at least $1,500.00 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Service Installation Charge (City of Alamo Heights, MF) — 5/8" meter ($1,000.00) and Water Impact Fee (City of Alamo Heights, MF) ($500.00).
Sewer Impact Fee (City of Alamo Heights, MF) is set by the utility and not published online. Stormwater Development Fee (City of Alamo Heights, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Alamo Heights Impact Fee Schedule
- Water Service Installation Charge (City of Alamo Heights, MF) — 5/8" meter$1,000.00City of Alamo HeightsCity of Alamo Heights water service line installation charge, per connection by meter size: $1,000 for a 5/8 in. meter up to $1,450 for a 2 in. meter. A building on one connection pays once at its meter size; 3 in. and larger is time and materials.
- Water Impact Fee (City of Alamo Heights, MF)$500.00City of Alamo HeightsCity water impact fee $500 per additional effective water connection (Ord. 1812, eff 2/23/2009), same as single-family. Master-metered MF pays per connection; tap fees by meter size apply.
- Sewer Impact Fee (City of Alamo Heights, MF)Requires confirmationCity of Alamo Heights (SAWS treatment)The city operates the sewer collection system and SAWS treats the wastewater. The city publishes no sewer impact or tap fee.
- City Impact Fees (Alamo Heights, MF)$0.00City of Alamo HeightsAlamo Heights charges no roadway impact fee and no parkland fee-in-lieu. Its water impact fee, water service installation charge and stormwater development fee are listed separately.
- Stormwater Development Fee (City of Alamo Heights, MF)Requires confirmationCity of Alamo HeightsAlamo Heights charges a one-time stormwater development fee of $0.40 per square foot of added impervious cover (half that rate on new residential construction on a vacant lot). The amount depends on the site plan, so it is not included in the total.
- County Impact Fees (Bexar County, MF)$0.00Bexar CountyTexas counties cannot charge impact fees on new development except a storm water and drainage fee in a county of 3.3 million or more people or one bordering such a county; Bexar County does not qualify and levies none.
Where in Bexar County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Alamo Heights: Commercial Impact Fees
Commercial development in Alamo Heights pays no per-square-foot impact fees, but owes $1,750.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 50,000 sq ft building, that comes to at least $1,750.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Service Installation Charge (City of Alamo Heights) — 1" ($1,250.00 one-time) and Water Impact Fee (City of Alamo Heights) ($500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (City of Alamo Heights) is set by the utility and not published online. Stormwater Development Fee (City of Alamo Heights, Commercial) — per sq ft impervious cover is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Alamo Heights Impact Fee Schedule
- Water Service Installation Charge (City of Alamo Heights) — 1"$1,250.00 one-timeCity of Alamo HeightsAlamo Heights water service line installation charge by meter size, paid in advance of installation; 3 inch and larger services are billed at time and materials. Extending a main to the property costs extra.
- Water Impact Fee (City of Alamo Heights)$500.00 one-timeCity of Alamo HeightsAlamo Heights water impact fee: $500 per new water connection, funding elevated water storage, adopted February 23, 2009. The city runs its own water utility; a service line installation charge by meter size is also due.
- Sewer Impact Fee (City of Alamo Heights)Requires confirmationCity of Alamo HeightsAlamo Heights owns the local sewer collection system and San Antonio Water System treats the wastewater. The city publishes no sewer impact or tap fee; lateral installation is at the owner's cost.
- City Impact Fee (City of Alamo Heights, Commercial)$0.00City of Alamo HeightsAlamo Heights charges no roadway or other city impact fee on nonresidential development. A separate stormwater development fee applies to added impervious cover.
- Stormwater Development Fee (City of Alamo Heights, Commercial) — per sq ft impervious coverRequires confirmationCity of Alamo HeightsAlamo Heights charges a one-time stormwater development fee of $0.40 per square foot of added impervious cover (roofs, paving and other hard surfaces) on any construction that increases impervious area. A site with a privately owned drainage system wholly sufficient for the property is exempt. Not included in the total because it depends on site design.
- County Impact Fee (Bexar County, Commercial)$0.00Bexar CountyBexar County does not charge impact fees on nonresidential development.
Where in Bexar County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Alamo Heights: Industrial Impact Fees
Industrial development in Alamo Heights pays no per-square-foot impact fees, but owes $1,750.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 50,000 sq ft building, that comes to at least $1,750.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Service Installation Charge (City of Alamo Heights) — 1" ($1,250.00 one-time) and Water Impact Fee (City of Alamo Heights) ($500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (City of Alamo Heights) is set by the utility and not published online. Stormwater Development Fee (City of Alamo Heights, Industrial) — per sq ft impervious cover is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Alamo Heights Impact Fee Schedule
- Water Service Installation Charge (City of Alamo Heights) — 1"$1,250.00 one-timeCity of Alamo HeightsAlamo Heights water service line installation charge by meter size, paid in advance of installation; 3 inch and larger services are billed at time and materials. Extending a main to the property costs extra.
- Water Impact Fee (City of Alamo Heights)$500.00 one-timeCity of Alamo HeightsAlamo Heights water impact fee: $500 per new water connection, funding elevated water storage, adopted February 23, 2009. The city runs its own water utility; a service line installation charge by meter size is also due.
- Sewer Impact Fee (City of Alamo Heights)Requires confirmationCity of Alamo HeightsAlamo Heights owns the local sewer collection system and San Antonio Water System treats the wastewater. The city publishes no sewer impact or tap fee; lateral installation is at the owner's cost.
- City Impact Fee (City of Alamo Heights, Industrial)$0.00City of Alamo HeightsAlamo Heights charges no roadway or other city impact fee on nonresidential development. A separate stormwater development fee applies to added impervious cover.
- Stormwater Development Fee (City of Alamo Heights, Industrial) — per sq ft impervious coverRequires confirmationCity of Alamo HeightsAlamo Heights charges a one-time stormwater development fee of $0.40 per square foot of added impervious cover (roofs, paving and other hard surfaces) on any construction that increases impervious area. A site with a privately owned drainage system wholly sufficient for the property is exempt. Not included in the total because it depends on site design.
- County Impact Fee (Bexar County, Industrial)$0.00Bexar CountyBexar County does not charge impact fees on nonresidential development.
Where in Bexar County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Alamo Heights: Office Impact Fees
Office development in Alamo Heights pays no per-square-foot impact fees, but owes $1,750.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 25,000 sq ft building, that comes to at least $1,750.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Service Installation Charge (City of Alamo Heights) — 1" ($1,250.00 one-time) and Water Impact Fee (City of Alamo Heights) ($500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (City of Alamo Heights) is set by the utility and not published online. Stormwater Development Fee (City of Alamo Heights, Office) — per sq ft impervious cover is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Alamo Heights Impact Fee Schedule
- Water Service Installation Charge (City of Alamo Heights) — 1"$1,250.00 one-timeCity of Alamo HeightsAlamo Heights water service line installation charge by meter size, paid in advance of installation; 3 inch and larger services are billed at time and materials. Extending a main to the property costs extra.
- Water Impact Fee (City of Alamo Heights)$500.00 one-timeCity of Alamo HeightsAlamo Heights water impact fee: $500 per new water connection, funding elevated water storage, adopted February 23, 2009. The city runs its own water utility; a service line installation charge by meter size is also due.
- Sewer Impact Fee (City of Alamo Heights)Requires confirmationCity of Alamo HeightsAlamo Heights owns the local sewer collection system and San Antonio Water System treats the wastewater. The city publishes no sewer impact or tap fee; lateral installation is at the owner's cost.
- City Impact Fee (City of Alamo Heights, Office)$0.00City of Alamo HeightsAlamo Heights charges no roadway or other city impact fee on nonresidential development. A separate stormwater development fee applies to added impervious cover.
- Stormwater Development Fee (City of Alamo Heights, Office) — per sq ft impervious coverRequires confirmationCity of Alamo HeightsAlamo Heights charges a one-time stormwater development fee of $0.40 per square foot of added impervious cover (roofs, paving and other hard surfaces) on any construction that increases impervious area. A site with a privately owned drainage system wholly sufficient for the property is exempt. Not included in the total because it depends on site design.
- County Impact Fee (Bexar County, Office)$0.00Bexar CountyBexar County does not charge impact fees on nonresidential development.
Where in Bexar County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Alamo Heights Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Alamo Heights Impact Fee FAQs
What are the total impact fees for a single-family home in Alamo Heights, Texas?
A new single-family home in Alamo Heights pays at least $1,500.00 per unit in combined impact fees (rates sourced November 16, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Alamo Heights?
Commercial development in Alamo Heights pays no per-square-foot impact fees, but owes $1,750.00 in one-time water and sewer connection fees (assuming a 1-inch meter). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Alamo Heights charge its own impact fees?
Yes. Alamo Heights levies its own municipal impact or utility fees. Bexar County does not currently add county-level impact fees inside Alamo Heights. The schedule on this page shows every fee that applies to development in Alamo Heights.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Bexar County impact fees page.