Live Oak, Texas Impact Fees

Live Oak applies its own fee schedule. Bexar County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $1,000.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Live Oak Impact Fees by Project Type

Live Oak: Single-Family Impact Fees

A new single-family home in Live Oak pays at least $1,000.00 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.

Park Improvement Fee-in-Lieu (City of Live Oak) and Parkland Dedication Fee-in-Lieu (City of Live Oak) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Wastewater Impact Fee (City of Live Oak) and Water Impact Fee — City of Live Oak are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Live Oak Impact Fee Schedule
Water$0.00
  • Water Impact Fee — City of Live Oak
    City of Live Oak
    The city water utility serves about two-thirds of Live Oak and charges connection fees on new service; the amount is not published here. About one-third of the city is served by SAWS, whose impact fee is shown as an option.
    Requires confirmation
Sewer$0.00
  • Wastewater Impact Fee (City of Live Oak)
    City of Live Oak (CCMA treatment)
    Sewer collection is billed by the city; treatment is provided regionally by CCMA. The city charges sewer connection fees on new service; the amount is not published here.
    Requires confirmation
City$1,000.00
  • Park Improvement Fee-in-Lieu (City of Live Oak)
    City of Live Oak
    Park improvement fee-in-lieu of $650 per dwelling unit, charged with the $350 parkland dedication fee-in-lieu (2022 fee schedule).
    $650.00Requires confirmation
  • Parkland Dedication Fee-in-Lieu (City of Live Oak)
    City of Live Oak
    Parkland dedication fee-in-lieu of $350 per dwelling unit (dedication standard: 1 acre per 100 units), adopted in the city's 2022 fee schedule. A separate $650 per unit park improvement fee-in-lieu also applies. No city roadway impact fee.
    $350.00Requires confirmation
County$0.00
  • County Impact Fees (Bexar County)
    Bexar County
    Texas counties cannot charge impact fees on new development except a storm water and drainage fee in a county of 3.3 million or more people or one bordering such a county; Bexar County does not qualify and levies none.
    $0.00
Total (Live Oak): $1,000.00
Sources last checked Official fee schedules:City of Live Oak City of Live Oak (CCMA treatment) Bexar County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Live Oak: Multifamily Impact Fees

A new multifamily unit in Live Oak pays at least $1,000.00 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.

Parkland Dedication Fee-in-Lieu (City of Live Oak, MF) and Park Improvement Fee-in-Lieu (City of Live Oak, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Wastewater Impact Fee (City of Live Oak, MF) and Water Impact Fee (MF) — City of Live Oak are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Live Oak Impact Fee Schedule
Water$0.00
  • Water Impact Fee (MF) — City of Live Oak
    City of Live Oak
    The city water utility serves about two-thirds of Live Oak and charges connection fees on new service; the amount is not published here. About one-third of the city is served by SAWS, whose impact fee is shown as an option.
    Requires confirmation
Sewer$0.00
  • Wastewater Impact Fee (City of Live Oak, MF)
    City of Live Oak (CCMA treatment)
    Sewer collection is billed by the city; treatment is provided regionally by CCMA. The city charges sewer connection fees on new service; the amount is not published here.
    Requires confirmation
City$1,000.00
County$0.00
  • County Impact Fees (Bexar County, MF)
    Bexar County
    Texas counties cannot charge impact fees on new development except a storm water and drainage fee in a county of 3.3 million or more people or one bordering such a county; Bexar County does not qualify and levies none.
    $0.00
Total (Live Oak): $1,000.00
Sources last checked Official fee schedules:City of Live Oak City of Live Oak (CCMA treatment) Bexar County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Live Oak: Commercial Impact Fees

Commercial development in Live Oak pays no per-square-foot impact fees (rates sourced November 16, 2026).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (City of Live Oak) and Water Connection Fee — City of Live Oak are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Live Oak Impact Fee Schedule
Water$0.00
  • Water Connection Fee — City of Live Oak
    City of Live Oak
    The City of Live Oak water system serves about two thirds of the city; it does not publish a water connection or tap charge online. Areas served by SAWS pay the SAWS water impact fee instead (other options in this list).
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (City of Live Oak)
    City of Live Oak
    Live Oak provides sewer service throughout the city, with treatment by the Cibolo Creek Municipal Authority and the San Antonio River Authority. The city does not publish a sewer connection or capacity charge online.
    Requires confirmation
City$0.00
County$0.00
Total (Live Oak): $0.00
Sources last checked Official fee schedules:City of Live Oak Bexar County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Live Oak: Industrial Impact Fees

Industrial development in Live Oak pays no per-square-foot impact fees (rates sourced November 16, 2026).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (City of Live Oak) and Water Connection Fee — City of Live Oak are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Live Oak Impact Fee Schedule
Water$0.00
  • Water Connection Fee — City of Live Oak
    City of Live Oak
    The City of Live Oak water system serves about two thirds of the city; it does not publish a water connection or tap charge online. Areas served by SAWS pay the SAWS water impact fee instead (other options in this list).
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (City of Live Oak)
    City of Live Oak
    Live Oak provides sewer service throughout the city, with treatment by the Cibolo Creek Municipal Authority and the San Antonio River Authority. The city does not publish a sewer connection or capacity charge online.
    Requires confirmation
City$0.00
County$0.00
Total (Live Oak): $0.00
Sources last checked Official fee schedules:City of Live Oak Bexar County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Live Oak: Office Impact Fees

Office development in Live Oak pays no per-square-foot impact fees (rates sourced November 16, 2026).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (City of Live Oak) and Water Connection Fee — City of Live Oak are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Live Oak Impact Fee Schedule
Water$0.00
  • Water Connection Fee — City of Live Oak
    City of Live Oak
    The City of Live Oak water system serves about two thirds of the city; it does not publish a water connection or tap charge online. Areas served by SAWS pay the SAWS water impact fee instead (other options in this list).
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (City of Live Oak)
    City of Live Oak
    Live Oak provides sewer service throughout the city, with treatment by the Cibolo Creek Municipal Authority and the San Antonio River Authority. The city does not publish a sewer connection or capacity charge online.
    Requires confirmation
City$0.00
County$0.00
Total (Live Oak): $0.00
Sources last checked Official fee schedules:City of Live Oak Bexar County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Live Oak Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Live Oak Impact Fee FAQs

What are the total impact fees for a single-family home in Live Oak, Texas?

A new single-family home in Live Oak pays at least $1,000.00 per unit in combined impact fees (rates sourced November 16, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Live Oak?

Live Oak does not currently levy impact fees on commercial development.

Does Live Oak charge its own impact fees?

Yes. Live Oak levies its own municipal impact or utility fees. Bexar County does not currently add county-level impact fees inside Live Oak. The schedule on this page shows every fee that applies to development in Live Oak.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Bexar County impact fees page.