Universal City, Texas Impact Fees

Universal City applies its own fee schedule. Bexar County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $10,536.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Universal City Impact Fees by Project Type

Universal City: Single-Family Impact Fees

A new single-family home in Universal City pays at least $10,536.00 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Treatment Impact Fee — SARA Salitrillo (Universal City) ($6,000.00).

Wastewater Impact Fee (City of Universal City) — 3/4" meter and Water Impact Fee (City of Universal City) — 3/4" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fees (Universal City) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Universal City Impact Fee Schedule
Water$3,881.00
  • Water Impact Fee (City of Universal City) — 3/4" meter
    City of Universal City
    Chapter 395 water impact fee of $3,881 per service unit, effective December 19, 2019 (Ord. 593-C-2019); a 3/4-inch meter is 1.0 service unit and larger meters pay more service units. A 2026 update has been proposed but not adopted.
    $3,881.00Requires confirmation
Sewer$6,655.00
  • Wastewater Treatment Impact Fee — SARA Salitrillo (Universal City)
    San Antonio River Authority (SARA)
    One-time sewer impact fee of the San Antonio River Authority (SARA), collected by Universal City on each new residential connection that drains to SARA's Salitrillo system, effective December 4, 2024. Parts of the city drain instead to the Cibolo Creek Municipal Authority (CCMA), whose fee is $2,200. Paid in addition to the city's own wastewater impact fee.
    $6,000.00
  • Wastewater Impact Fee (City of Universal City) — 3/4" meter
    City of Universal City
    Chapter 395 wastewater impact fee of $655 per service unit, effective December 19, 2019 (Ord. 593-C-2019); a 3/4-inch meter is 1.0 service unit and larger meters pay more service units. The city also collects a separate treatment impact fee for SARA or CCMA, depending on where the property drains.
    $655.00Requires confirmation
City$0.00
  • City Impact Fees (Universal City)
    City of Universal City
    No city roadway impact fee. The city collects a parkland fee-in-lieu on new residential development; the amount is set in the city code and is not shown here.
    Requires confirmation
County$0.00
  • County Impact Fees (Bexar County)
    Bexar County
    Texas counties cannot charge impact fees on new development except a storm water and drainage fee in a county of 3.3 million or more people or one bordering such a county; Bexar County does not qualify and levies none.
    $0.00
Total (Universal City): $10,536.00
Sources last checked Official fee schedules:City of Universal City San Antonio River Authority (SARA) Bexar County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Universal City: Multifamily Impact Fees

A new multifamily unit in Universal City pays at least $10,536.00 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.

Water Impact Fee (City of Universal City, MF) — 3/4" meter, Wastewater Treatment Impact Fee (MF) — SARA Salitrillo (Universal City), and Wastewater Impact Fee (City of Universal City, MF) — 3/4" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fees (Universal City, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Universal City Impact Fee Schedule
Water$3,881.00
  • Water Impact Fee (City of Universal City, MF) — 3/4" meter
    City of Universal City
    Chapter 395 water impact fee of $3,881 per service unit, effective December 19, 2019 (Ord. 593-C-2019). Fees are by meter size: a master-metered building pays by its meter's service units, shown here at the 3/4-inch, 1.0 service unit floor. A 2026 update has been proposed but not adopted.
    $3,881.00Requires confirmation
Sewer$6,655.00
  • Wastewater Treatment Impact Fee (MF) — SARA Salitrillo (Universal City)
    San Antonio River Authority (SARA)
    One-time sewer impact fee of the San Antonio River Authority (SARA), collected by Universal City per residential connection draining to SARA's Salitrillo system, effective December 4, 2024. The ordinance prints no multifamily rate, so the full per-connection fee is shown; a building on one connection pays it once. Parts of the city drain instead to CCMA ($2,200).
    $6,000.00Requires confirmation
  • Wastewater Impact Fee (City of Universal City, MF) — 3/4" meter
    City of Universal City
    Chapter 395 wastewater impact fee of $655 per service unit, effective December 19, 2019 (Ord. 593-C-2019). Fees are by meter size: a master-metered building pays by its meter's service units, shown here at the 3/4-inch, 1.0 service unit floor. The city also collects a SARA or CCMA treatment impact fee.
    $655.00Requires confirmation
City$0.00
  • City Impact Fees (Universal City, MF)
    City of Universal City
    No city roadway impact fee. The city collects a parkland fee-in-lieu on new residential development; the amount is set in the city code and is not shown here.
    Requires confirmation
County$0.00
  • County Impact Fees (Bexar County, MF)
    Bexar County
    Texas counties cannot charge impact fees on new development except a storm water and drainage fee in a county of 3.3 million or more people or one bordering such a county; Bexar County does not qualify and levies none.
    $0.00
Total (Universal City): $10,536.00
Sources last checked Official fee schedules:City of Universal City San Antonio River Authority (SARA) Bexar County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Universal City: Commercial Impact Fees

Commercial development in Universal City pays no per-square-foot impact fees, but owes $4,536.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 50,000 sq ft building, that comes to at least $4,536.00. The calculator below adjusts to your exact square footage.

Water Impact Fee (City of Universal City) — per service unit and Wastewater Impact Fee (City of Universal City) — per service unit are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Sewer Treatment Impact Fee — SARA (Universal City pass-through) and Sewer Treatment Impact Fee — CCMA (Universal City pass-through) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Universal City Impact Fee Schedule
Water$3,881.00 one-time
  • Water Impact Fee (City of Universal City) — per service unit
    City of Universal City
    Universal City water impact fee of $3,881 per service unit under Ord. 593-C-2019 (effective December 19, 2019); larger meters count as more service units. An impact fee update is in progress in 2026 and has not been adopted.
    $3,881.00 one-timeRequires confirmation
Sewer$655.00 one-time
  • Wastewater Impact Fee (City of Universal City) — per service unit
    City of Universal City
    Universal City wastewater impact fee of $655 per service unit under Ord. 593-C-2019 (effective December 19, 2019); larger meters count as more service units. SARA or CCMA treatment impact fees are collected in addition. An impact fee update is in progress in 2026 and has not been adopted.
    $655.00 one-timeRequires confirmation
  • Sewer Treatment Impact Fee — SARA (Universal City pass-through)
    San Antonio River Authority
    Universal City collects a one-time San Antonio River Authority sewer impact fee where the site drains to SARA's system. For commercial construction SARA sets the amount individually per project (residential is a flat $6,000 per connection).
    Requires confirmation
  • Sewer Treatment Impact Fee — CCMA (Universal City pass-through)
    Cibolo Creek Municipal Authority
    Universal City collects a one-time Cibolo Creek Municipal Authority sewer impact fee where the site drains to CCMA. For commercial construction CCMA sets the amount individually per project, at $2,200 per living unit equivalent in its North service area (residential is a flat $2,200 per connection).
    Requires confirmation
City$0.00
County$0.00
Total (Universal City): $4,536.00 one-time (≈ $4,536.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Universal City San Antonio River Authority Cibolo Creek Municipal Authority Bexar County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Universal City: Industrial Impact Fees

Industrial development in Universal City pays no per-square-foot impact fees, but owes $4,536.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 50,000 sq ft building, that comes to at least $4,536.00. The calculator below adjusts to your exact square footage.

Water Impact Fee (City of Universal City) — per service unit and Wastewater Impact Fee (City of Universal City) — per service unit are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Sewer Treatment Impact Fee — SARA (Universal City pass-through) and Sewer Treatment Impact Fee — CCMA (Universal City pass-through) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Universal City Impact Fee Schedule
Water$3,881.00 one-time
  • Water Impact Fee (City of Universal City) — per service unit
    City of Universal City
    Universal City water impact fee of $3,881 per service unit under Ord. 593-C-2019 (effective December 19, 2019); larger meters count as more service units. An impact fee update is in progress in 2026 and has not been adopted.
    $3,881.00 one-timeRequires confirmation
Sewer$655.00 one-time
  • Wastewater Impact Fee (City of Universal City) — per service unit
    City of Universal City
    Universal City wastewater impact fee of $655 per service unit under Ord. 593-C-2019 (effective December 19, 2019); larger meters count as more service units. SARA or CCMA treatment impact fees are collected in addition. An impact fee update is in progress in 2026 and has not been adopted.
    $655.00 one-timeRequires confirmation
  • Sewer Treatment Impact Fee — SARA (Universal City pass-through)
    San Antonio River Authority
    Universal City collects a one-time San Antonio River Authority sewer impact fee where the site drains to SARA's system. For commercial construction SARA sets the amount individually per project (residential is a flat $6,000 per connection).
    Requires confirmation
  • Sewer Treatment Impact Fee — CCMA (Universal City pass-through)
    Cibolo Creek Municipal Authority
    Universal City collects a one-time Cibolo Creek Municipal Authority sewer impact fee where the site drains to CCMA. For commercial construction CCMA sets the amount individually per project, at $2,200 per living unit equivalent in its North service area (residential is a flat $2,200 per connection).
    Requires confirmation
City$0.00
County$0.00
Total (Universal City): $4,536.00 one-time (≈ $4,536.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Universal City San Antonio River Authority Cibolo Creek Municipal Authority Bexar County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Universal City: Office Impact Fees

Office development in Universal City pays no per-square-foot impact fees, but owes $4,536.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 25,000 sq ft building, that comes to at least $4,536.00. The calculator below adjusts to your exact square footage.

Water Impact Fee (City of Universal City) — per service unit and Wastewater Impact Fee (City of Universal City) — per service unit are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Sewer Treatment Impact Fee — SARA (Universal City pass-through) and Sewer Treatment Impact Fee — CCMA (Universal City pass-through) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Universal City Impact Fee Schedule
Water$3,881.00 one-time
  • Water Impact Fee (City of Universal City) — per service unit
    City of Universal City
    Universal City water impact fee of $3,881 per service unit under Ord. 593-C-2019 (effective December 19, 2019); larger meters count as more service units. An impact fee update is in progress in 2026 and has not been adopted.
    $3,881.00 one-timeRequires confirmation
Sewer$655.00 one-time
  • Wastewater Impact Fee (City of Universal City) — per service unit
    City of Universal City
    Universal City wastewater impact fee of $655 per service unit under Ord. 593-C-2019 (effective December 19, 2019); larger meters count as more service units. SARA or CCMA treatment impact fees are collected in addition. An impact fee update is in progress in 2026 and has not been adopted.
    $655.00 one-timeRequires confirmation
  • Sewer Treatment Impact Fee — SARA (Universal City pass-through)
    San Antonio River Authority
    Universal City collects a one-time San Antonio River Authority sewer impact fee where the site drains to SARA's system. For commercial construction SARA sets the amount individually per project (residential is a flat $6,000 per connection).
    Requires confirmation
  • Sewer Treatment Impact Fee — CCMA (Universal City pass-through)
    Cibolo Creek Municipal Authority
    Universal City collects a one-time Cibolo Creek Municipal Authority sewer impact fee where the site drains to CCMA. For commercial construction CCMA sets the amount individually per project, at $2,200 per living unit equivalent in its North service area (residential is a flat $2,200 per connection).
    Requires confirmation
City$0.00
County$0.00
Total (Universal City): $4,536.00 one-time (≈ $4,536.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Universal City San Antonio River Authority Cibolo Creek Municipal Authority Bexar County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Universal City Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Universal City Impact Fee FAQs

What are the total impact fees for a single-family home in Universal City, Texas?

A new single-family home in Universal City pays at least $10,536.00 per unit in combined impact fees (rates sourced November 16, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Universal City?

Commercial development in Universal City pays no per-square-foot impact fees, but owes $4,536.00 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Universal City charge its own impact fees?

Yes. Universal City levies its own municipal impact or utility fees. Bexar County does not currently add county-level impact fees inside Universal City. The schedule on this page shows every fee that applies to development in Universal City.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Bexar County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.