Schertz Impact Fees by Project Type
Schertz: Single-Family Impact Fees
A new single-family home in Schertz pays $21,957.24 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Schertz) — 5/8" meter ($8,814.00), Wastewater Impact Fee (City of Schertz) — 5/8" meter ($5,556.00) and Roadway Impact Fee (City of Schertz) ($3,370.00).
Wastewater Treatment Impact Fee (CCMA, Schertz) — North Basin and Water Supply Impact Fee (SSLGC, Schertz) — 5/8" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Schertz Impact Fee Schedule
- Water Impact Fee (City of Schertz) — 5/8" meter$8,814.00City of SchertzWater impact fee of $8,814 for a 5/8 inch meter (1.0 living unit equivalent), adopted April 1, 2025, for property platted on or after June 1, 2025. Larger meters pay more. The Schertz Seguin Local Government Corporation water supply fee is listed separately.
- Water Supply Impact Fee (SSLGC, Schertz) — 5/8" meter$587.24Requires confirmationSchertz Seguin Local Government Corporation (SSLGC)Schertz Seguin Local Government Corporation water supply impact fee of $587.24 for a 5/8 inch meter under the fee schedule effective October 1, 2026 ($1,607.24 the year before), collected with the city water impact fee. Larger meters pay more.
- Water Meter Installation Fee (City of Schertz) — 5/8" x 3/4" meter$330.00City of SchertzCity water meter installation fee inside the city: $330 for a 5/8 x 3/4 inch meter, $345 for 3/4 inch, $450 for 1 inch, $1,940 for 2 inch; larger meters at cost plus labor.
- Wastewater Impact Fee (City of Schertz) — 5/8" meter$5,556.00City of SchertzWastewater collection impact fee of $5,556 for a 5/8 inch meter, adopted April 1, 2025, for property platted on or after June 1, 2025. Larger meters pay more. The CCMA treatment impact fee is listed separately.
- Wastewater Treatment Impact Fee (CCMA, Schertz) — North Basin$2,300.00Requires confirmationCibolo Creek Municipal Authority (CCMA)CCMA wastewater treatment impact fee of $2,300 per living unit equivalent in the North Basin ($2,200 in the South Basin), collected with the city wastewater impact fee. Shown at the higher of the two basins.
- Roadway Impact Fee (City of Schertz)$3,370.00City of SchertzRoadway impact fee of $3,370 per residential home for property platted after March 26, 2022, the same in all four service areas. Earlier plats pay the rate in force when they were recorded ($2,696 or $3,033).
- Park Development Fee (City of Schertz)$650.00City of SchertzPark development fee of $650 per dwelling unit, charged with the $350 parkland fee-in-lieu.
- Parkland Dedication Fee-in-Lieu (City of Schertz)$350.00City of SchertzParkland fee-in-lieu of land dedication of $350 per dwelling unit (dedication standard: 1 acre per 100 units). A separate $650 per unit park development fee also applies.
- County Impact Fees (Bexar County)$0.00Bexar CountyTexas counties cannot charge impact fees on new development except a storm water and drainage fee in a county of 3.3 million or more people or one bordering such a county; Bexar County does not qualify and levies none.
Where in Bexar County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Schertz: Multifamily Impact Fees
A new multifamily unit in Schertz pays at least $18,587.24 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Park Development Fee (City of Schertz, MF) ($650.00), Parkland Dedication Fee-in-Lieu (City of Schertz, MF) ($350.00) and Water Meter Installation Fee (City of Schertz, MF) — 5/8" x 3/4" meter ($330.00).
Water Supply Impact Fee (SSLGC, Schertz, MF) — 5/8" meter, Wastewater Impact Fee (City of Schertz, MF) — 5/8" meter, Water Impact Fee (City of Schertz, MF) — 5/8" meter, and Wastewater Treatment Impact Fee (CCMA, Schertz, MF) — North Basin are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Roadway Impact Fee (City of Schertz, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Schertz Impact Fee Schedule
- Water Impact Fee (City of Schertz, MF) — 5/8" meter$8,814.00Requires confirmationCity of SchertzWater impact fee of $8,814 for a 5/8 inch meter, adopted April 1, 2025. Charged by meter size, so the smallest meter is shown; a master-metered building pays by its meter's unit count.
- Water Supply Impact Fee (SSLGC, Schertz, MF) — 5/8" meter$587.24Requires confirmationSchertz Seguin Local Government Corporation (SSLGC)Schertz Seguin Local Government Corporation water supply impact fee of $587.24 for a 5/8 inch meter under the schedule effective October 1, 2026, collected with the city water impact fee.
- Water Meter Installation Fee (City of Schertz, MF) — 5/8" x 3/4" meter$330.00City of SchertzCity water meter installation fee per connection: $330 for a 5/8 x 3/4 inch meter up to $1,940 for 2 inch; a building on one connection pays once at its meter size.
- Wastewater Impact Fee (City of Schertz, MF) — 5/8" meter$5,556.00Requires confirmationCity of SchertzWastewater collection impact fee of $5,556 for a 5/8 inch meter, adopted April 1, 2025. Charged by meter size, so the smallest meter is shown. The CCMA treatment impact fee is listed separately.
- Wastewater Treatment Impact Fee (CCMA, Schertz, MF) — North Basin$2,300.00Requires confirmationCibolo Creek Municipal Authority (CCMA)CCMA wastewater treatment impact fee of $2,300 per living unit equivalent in the North Basin ($2,200 South Basin), collected with the city fee; shown at one unit.
- Park Development Fee (City of Schertz, MF)$650.00City of SchertzPark development fee of $650 per dwelling unit, charged with the $350 parkland fee-in-lieu.
- Parkland Dedication Fee-in-Lieu (City of Schertz, MF)$350.00City of SchertzParkland fee-in-lieu of land dedication of $350 per dwelling unit for multifamily (1 acre per 100 units). A separate $650 per unit park development fee also applies.
- Roadway Impact Fee (City of Schertz, MF)Requires confirmationCity of SchertzSchertz charges a roadway impact fee; the schedule prints a single-family rate ($3,370 per home) and a per-service-unit rate for other uses, with no published multifamily figure.
- County Impact Fees (Bexar County, MF)$0.00Bexar CountyTexas counties cannot charge impact fees on new development except a storm water and drainage fee in a county of 3.3 million or more people or one bordering such a county; Bexar County does not qualify and levies none.
Where in Bexar County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Schertz: Commercial Impact Fees
Commercial development in Schertz pays no per-square-foot impact fees, but owes $32,664.48 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 50,000 sq ft building, that comes to at least $32,664.48. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Schertz) — 1" meter ($17,628.00 one-time), Wastewater Impact Fee (City of Schertz) — 1" meter ($11,112.00 one-time) and Water Supply Impact Fee (SSLGC) — 1" meter ($1,174.48 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Treatment Impact Fee (CCMA) — South Zone is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Roadway Impact Fee (City of Schertz, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Schertz Impact Fee Schedule
- Water Impact Fee (City of Schertz) — 1" meter$17,628.00 one-timeCity of SchertzSchertz water impact fee, $8,814 per living unit equivalent; a 1 inch meter counts as 2.0 units. Applies to property platted on or after June 1, 2025; earlier plats pay the schedule in effect when platted. The Schertz Seguin Local Government Corporation water supply fee and a meter installation fee are charged in addition.
- Water Supply Impact Fee (SSLGC) — 1" meter$1,174.48 one-timeSchertz Seguin Local Government Corporation (SSLGC)Water supply impact fee of the Schertz Seguin Local Government Corporation, collected by Schertz in addition to the city water impact fee, priced by meter size (1 inch meter shown) from October 1, 2026.
- Water Meter Installation Fee (City of Schertz) — 1" x 1"$450.00 one-timeCity of SchertzSchertz meter installation fee inside the city. A 2 inch turbine meter or a meter 3 inches or larger is installed at cost plus labor.
- Wastewater Impact Fee (City of Schertz) — 1" meter$11,112.00 one-timeCity of SchertzSchertz wastewater collection impact fee, $5,556 per living unit equivalent; a 1 inch meter counts as 2.0 units. Applies to property platted on or after June 1, 2025. The Cibolo Creek Municipal Authority treatment impact fee is charged in addition.
- Wastewater Treatment Impact Fee (CCMA) — South Zone$2,300.00 one-timeRequires confirmationCibolo Creek Municipal Authority (CCMA)Cibolo Creek Municipal Authority wastewater treatment impact fee, $2,300 per living unit equivalent in the South Zone (the higher of two zones; North Zone $2,200), collected with the Schertz fees. One unit equals 155 gallons per day of wastewater flow.
- Roadway Impact Fee (City of Schertz, Commercial)Requires confirmationCity of SchertzSchertz charges a roadway impact fee on nonresidential development of $175 per service unit (vehicle miles of afternoon peak-hour travel), with the number of service units set by land use and building size, collected at building permit. A roadway fee update was under review in 2026.
- County Impact Fee (Bexar County, Commercial)$0.00Bexar CountyBexar County does not charge impact fees on nonresidential development.
Where in Bexar County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Schertz: Industrial Impact Fees
Industrial development in Schertz pays no per-square-foot impact fees, but owes $32,664.48 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 50,000 sq ft building, that comes to at least $32,664.48. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Schertz) — 1" meter ($17,628.00 one-time), Wastewater Impact Fee (City of Schertz) — 1" meter ($11,112.00 one-time) and Water Supply Impact Fee (SSLGC) — 1" meter ($1,174.48 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Treatment Impact Fee (CCMA) — South Zone is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Roadway Impact Fee (City of Schertz, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Schertz Impact Fee Schedule
- Water Impact Fee (City of Schertz) — 1" meter$17,628.00 one-timeCity of SchertzSchertz water impact fee, $8,814 per living unit equivalent; a 1 inch meter counts as 2.0 units. Applies to property platted on or after June 1, 2025; earlier plats pay the schedule in effect when platted. The Schertz Seguin Local Government Corporation water supply fee and a meter installation fee are charged in addition.
- Water Supply Impact Fee (SSLGC) — 1" meter$1,174.48 one-timeSchertz Seguin Local Government Corporation (SSLGC)Water supply impact fee of the Schertz Seguin Local Government Corporation, collected by Schertz in addition to the city water impact fee, priced by meter size (1 inch meter shown) from October 1, 2026.
- Water Meter Installation Fee (City of Schertz) — 1" x 1"$450.00 one-timeCity of SchertzSchertz meter installation fee inside the city. A 2 inch turbine meter or a meter 3 inches or larger is installed at cost plus labor.
- Wastewater Impact Fee (City of Schertz) — 1" meter$11,112.00 one-timeCity of SchertzSchertz wastewater collection impact fee, $5,556 per living unit equivalent; a 1 inch meter counts as 2.0 units. Applies to property platted on or after June 1, 2025. The Cibolo Creek Municipal Authority treatment impact fee is charged in addition.
- Wastewater Treatment Impact Fee (CCMA) — South Zone$2,300.00 one-timeRequires confirmationCibolo Creek Municipal Authority (CCMA)Cibolo Creek Municipal Authority wastewater treatment impact fee, $2,300 per living unit equivalent in the South Zone (the higher of two zones; North Zone $2,200), collected with the Schertz fees. One unit equals 155 gallons per day of wastewater flow.
- Roadway Impact Fee (City of Schertz, Industrial)Requires confirmationCity of SchertzSchertz charges a roadway impact fee on nonresidential development of $175 per service unit (vehicle miles of afternoon peak-hour travel), with the number of service units set by land use and building size, collected at building permit. A roadway fee update was under review in 2026.
- County Impact Fee (Bexar County, Industrial)$0.00Bexar CountyBexar County does not charge impact fees on nonresidential development.
Where in Bexar County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Schertz: Office Impact Fees
Office development in Schertz pays no per-square-foot impact fees, but owes $32,664.48 in one-time water and sewer connection fees (rates sourced November 16, 2026).
For a 25,000 sq ft building, that comes to at least $32,664.48. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Schertz) — 1" meter ($17,628.00 one-time), Wastewater Impact Fee (City of Schertz) — 1" meter ($11,112.00 one-time) and Water Supply Impact Fee (SSLGC) — 1" meter ($1,174.48 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Wastewater Treatment Impact Fee (CCMA) — South Zone is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Roadway Impact Fee (City of Schertz, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Schertz Impact Fee Schedule
- Water Impact Fee (City of Schertz) — 1" meter$17,628.00 one-timeCity of SchertzSchertz water impact fee, $8,814 per living unit equivalent; a 1 inch meter counts as 2.0 units. Applies to property platted on or after June 1, 2025; earlier plats pay the schedule in effect when platted. The Schertz Seguin Local Government Corporation water supply fee and a meter installation fee are charged in addition.
- Water Supply Impact Fee (SSLGC) — 1" meter$1,174.48 one-timeSchertz Seguin Local Government Corporation (SSLGC)Water supply impact fee of the Schertz Seguin Local Government Corporation, collected by Schertz in addition to the city water impact fee, priced by meter size (1 inch meter shown) from October 1, 2026.
- Water Meter Installation Fee (City of Schertz) — 1" x 1"$450.00 one-timeCity of SchertzSchertz meter installation fee inside the city. A 2 inch turbine meter or a meter 3 inches or larger is installed at cost plus labor.
- Wastewater Impact Fee (City of Schertz) — 1" meter$11,112.00 one-timeCity of SchertzSchertz wastewater collection impact fee, $5,556 per living unit equivalent; a 1 inch meter counts as 2.0 units. Applies to property platted on or after June 1, 2025. The Cibolo Creek Municipal Authority treatment impact fee is charged in addition.
- Wastewater Treatment Impact Fee (CCMA) — South Zone$2,300.00 one-timeRequires confirmationCibolo Creek Municipal Authority (CCMA)Cibolo Creek Municipal Authority wastewater treatment impact fee, $2,300 per living unit equivalent in the South Zone (the higher of two zones; North Zone $2,200), collected with the Schertz fees. One unit equals 155 gallons per day of wastewater flow.
- Roadway Impact Fee (City of Schertz, Office)Requires confirmationCity of SchertzSchertz charges a roadway impact fee on nonresidential development of $175 per service unit (vehicle miles of afternoon peak-hour travel), with the number of service units set by land use and building size, collected at building permit. A roadway fee update was under review in 2026.
- County Impact Fee (Bexar County, Office)$0.00Bexar CountyBexar County does not charge impact fees on nonresidential development.
Where in Bexar County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Schertz Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Schertz Impact Fee FAQs
What are the total impact fees for a single-family home in Schertz, Texas?
A new single-family home in Schertz pays $21,957.24 per unit in combined impact fees (rates sourced November 16, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Schertz?
Commercial development in Schertz pays no per-square-foot impact fees, but owes $32,664.48 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Schertz charge its own impact fees?
Yes. Schertz levies its own municipal impact or utility fees. Bexar County does not currently add county-level impact fees inside Schertz. The schedule on this page shows every fee that applies to development in Schertz.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Bexar County impact fees page.