Balcones Heights, Texas Impact Fees

Balcones Heights applies its own fee schedule. Bexar County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $6,855.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Balcones Heights Impact Fees by Project Type

Balcones Heights: Single-Family Impact Fees

A new single-family home in Balcones Heights pays at least $6,855.00 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.

Wastewater Impact Fee — City of Balcones Heights and Water Impact Fee — City of Balcones Heights are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Stormwater Development Fee (City of Balcones Heights) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Balcones Heights Impact Fee Schedule
Water$4,597.00
  • Water Impact Fee — City of Balcones Heights
    City of Balcones Heights
    Balcones Heights levies its own water impact fee of $4,597 per equivalent dwelling unit (supply $2,796, delivery flow $1,182, system development $619), collected at application for city utility service or building permit. The fee schedule also allows the current SAWS outside-city rate for the zone plus a 5% administrative fee.
    $4,597.00Requires confirmation
Sewer$2,258.00
  • Wastewater Impact Fee — City of Balcones Heights
    City of Balcones Heights
    Balcones Heights runs its own sewer collection and levies a wastewater impact fee of $2,258 per equivalent dwelling unit (treatment $789, collection $1,469), collected at application for city utility service or building permit. The fee schedule also allows the current SAWS outside-city rate for the zone plus a 5% administrative fee.
    $2,258.00Requires confirmation
City$0.00
  • City Impact Fees (Balcones Heights)
    City of Balcones Heights
    No city roadway or park impact fee. The city's water and wastewater impact fees and its stormwater development fee are listed separately.
    $0.00
  • Stormwater Development Fee (City of Balcones Heights)
    City of Balcones Heights
    Balcones Heights charges a stormwater development fee of $0.40 per square foot of added impervious cover on construction that increases impervious area. Not included in the total because it depends on site design.
    Requires confirmation
County$0.00
  • County Impact Fees (Bexar County)
    Bexar County
    Texas counties cannot charge impact fees on new development except a storm water and drainage fee in a county of 3.3 million or more people or one bordering such a county; Bexar County does not qualify and levies none.
    $0.00
Total (Balcones Heights): $6,855.00
Sources last checked Official fee schedules:City of Balcones Heights Bexar County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Balcones Heights: Multifamily Impact Fees

A new multifamily unit in Balcones Heights pays at least $6,855.00 per unit in impact fees (rates sourced November 16, 2026). Every line item is levied at the municipal or utility level.

Wastewater Impact Fee (MF) — City of Balcones Heights and Water Impact Fee (MF) — City of Balcones Heights are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Stormwater Development Fee (City of Balcones Heights, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Balcones Heights Impact Fee Schedule
Water$4,597.00
  • Water Impact Fee (MF) — City of Balcones Heights
    City of Balcones Heights
    Balcones Heights levies its own water impact fee of $4,597 per equivalent dwelling unit. Units are set by meter size relative to a 5/8 inch meter, so the smallest meter is shown; a master-metered building pays by its meter's unit count. The fee schedule also allows the current SAWS outside-city rate for the zone plus a 5% administrative fee.
    $4,597.00Requires confirmation
Sewer$2,258.00
  • Wastewater Impact Fee (MF) — City of Balcones Heights
    City of Balcones Heights
    Balcones Heights runs its own sewer collection and levies a wastewater impact fee of $2,258 per equivalent dwelling unit. Units are set by meter size, so the smallest meter is shown; a master-metered building pays by its meter's unit count. The fee schedule also allows the current SAWS outside-city rate plus a 5% administrative fee.
    $2,258.00Requires confirmation
City$0.00
  • City Impact Fees (Balcones Heights, MF)
    City of Balcones Heights
    No city roadway or park impact fee. The city's water and wastewater impact fees and its stormwater development fee are listed separately.
    $0.00
  • Stormwater Development Fee (City of Balcones Heights, MF)
    City of Balcones Heights
    Balcones Heights charges a stormwater development fee of $0.40 per square foot of added impervious cover on construction that increases impervious area. Not included in the total because it depends on site design.
    Requires confirmation
County$0.00
  • County Impact Fees (Bexar County, MF)
    Bexar County
    Texas counties cannot charge impact fees on new development except a storm water and drainage fee in a county of 3.3 million or more people or one bordering such a county; Bexar County does not qualify and levies none.
    $0.00
Total (Balcones Heights): $6,855.00
Sources last checked Official fee schedules:City of Balcones Heights Bexar County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Balcones Heights: Commercial Impact Fees

Commercial development in Balcones Heights pays no per-square-foot impact fees, but owes $6,855.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 50,000 sq ft building, that comes to at least $6,855.00. The calculator below adjusts to your exact square footage.

Wastewater Impact Fee (City of Balcones Heights) — per EDU and Water Impact Fee (City of Balcones Heights) — per EDU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Stormwater Development Fee (City of Balcones Heights, Commercial) — per sq ft impervious cover is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Balcones Heights Impact Fee Schedule
Water$4,597.00 one-time
  • Water Impact Fee (City of Balcones Heights) — per EDU
    City of Balcones Heights
    Balcones Heights levies its own water impact fee of $4,597 per equivalent dwelling unit (supply $2,796, delivery flow $1,182, system development $619), collected at application for city utility service or building permit. Units are set by meter size relative to a 5/8 inch meter (1 unit), so larger meters pay a multiple. The fee schedule also allows the current SAWS outside-city rate for the zone plus a 5% administrative fee.
    $4,597.00 one-timeRequires confirmation
Sewer$2,258.00 one-time
  • Wastewater Impact Fee (City of Balcones Heights) — per EDU
    City of Balcones Heights
    Balcones Heights levies its own wastewater impact fee of $2,258 per equivalent dwelling unit (treatment $789, collection $1,469), collected at application for city utility service or building permit. Units are set by meter size relative to a 5/8 inch meter (1 unit), so larger meters pay a multiple. The fee schedule also allows the current SAWS outside-city rate for the zone plus a 5% administrative fee.
    $2,258.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Balcones Heights): $6,855.00 one-time (≈ $6,855.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Balcones Heights Bexar County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Balcones Heights: Industrial Impact Fees

Industrial development in Balcones Heights pays no per-square-foot impact fees, but owes $6,855.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 50,000 sq ft building, that comes to at least $6,855.00. The calculator below adjusts to your exact square footage.

Wastewater Impact Fee (City of Balcones Heights) — per EDU and Water Impact Fee (City of Balcones Heights) — per EDU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Stormwater Development Fee (City of Balcones Heights, Industrial) — per sq ft impervious cover is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Balcones Heights Impact Fee Schedule
Water$4,597.00 one-time
  • Water Impact Fee (City of Balcones Heights) — per EDU
    City of Balcones Heights
    Balcones Heights levies its own water impact fee of $4,597 per equivalent dwelling unit (supply $2,796, delivery flow $1,182, system development $619), collected at application for city utility service or building permit. Units are set by meter size relative to a 5/8 inch meter (1 unit), so larger meters pay a multiple. The fee schedule also allows the current SAWS outside-city rate for the zone plus a 5% administrative fee.
    $4,597.00 one-timeRequires confirmation
Sewer$2,258.00 one-time
  • Wastewater Impact Fee (City of Balcones Heights) — per EDU
    City of Balcones Heights
    Balcones Heights levies its own wastewater impact fee of $2,258 per equivalent dwelling unit (treatment $789, collection $1,469), collected at application for city utility service or building permit. Units are set by meter size relative to a 5/8 inch meter (1 unit), so larger meters pay a multiple. The fee schedule also allows the current SAWS outside-city rate for the zone plus a 5% administrative fee.
    $2,258.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Balcones Heights): $6,855.00 one-time (≈ $6,855.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Balcones Heights Bexar County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Balcones Heights: Office Impact Fees

Office development in Balcones Heights pays no per-square-foot impact fees, but owes $6,855.00 in one-time water and sewer connection fees (rates sourced November 16, 2026).

For a 25,000 sq ft building, that comes to at least $6,855.00. The calculator below adjusts to your exact square footage.

Wastewater Impact Fee (City of Balcones Heights) — per EDU and Water Impact Fee (City of Balcones Heights) — per EDU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Stormwater Development Fee (City of Balcones Heights, Office) — per sq ft impervious cover is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Balcones Heights Impact Fee Schedule
Water$4,597.00 one-time
  • Water Impact Fee (City of Balcones Heights) — per EDU
    City of Balcones Heights
    Balcones Heights levies its own water impact fee of $4,597 per equivalent dwelling unit (supply $2,796, delivery flow $1,182, system development $619), collected at application for city utility service or building permit. Units are set by meter size relative to a 5/8 inch meter (1 unit), so larger meters pay a multiple. The fee schedule also allows the current SAWS outside-city rate for the zone plus a 5% administrative fee.
    $4,597.00 one-timeRequires confirmation
Sewer$2,258.00 one-time
  • Wastewater Impact Fee (City of Balcones Heights) — per EDU
    City of Balcones Heights
    Balcones Heights levies its own wastewater impact fee of $2,258 per equivalent dwelling unit (treatment $789, collection $1,469), collected at application for city utility service or building permit. Units are set by meter size relative to a 5/8 inch meter (1 unit), so larger meters pay a multiple. The fee schedule also allows the current SAWS outside-city rate for the zone plus a 5% administrative fee.
    $2,258.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Balcones Heights): $6,855.00 one-time (≈ $6,855.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Balcones Heights Bexar County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Balcones Heights Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Balcones Heights Impact Fee FAQs

What are the total impact fees for a single-family home in Balcones Heights, Texas?

A new single-family home in Balcones Heights pays at least $6,855.00 per unit in combined impact fees (rates sourced November 16, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Balcones Heights?

Commercial development in Balcones Heights pays no per-square-foot impact fees, but owes $6,855.00 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Balcones Heights charge its own impact fees?

Yes. Balcones Heights levies its own municipal impact or utility fees. Bexar County does not currently add county-level impact fees inside Balcones Heights. The schedule on this page shows every fee that applies to development in Balcones Heights.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Bexar County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.