Skip to content
IMPACTFEES.ORG

Olmos Park, Texas Impact Fees

Olmos Park applies its own fee schedule. Bexar County does not currently add county-level impact fees inside city limits. A new single-family home pays $13,028.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Olmos Park Impact Fees by Project Type

Olmos Park: Single-Family Impact Fees

A new single-family home in Olmos Park pays $13,028.00 per unit in impact fees (rates sourced November 3, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (SAWS) — High Elevation ($5,987.00).

Parkland Dedication Fee-in-Lieu (City of Olmos Park) and Wastewater Impact Fee (SAWS) — Upper Collection Zone are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Olmos Park Impact Fee Schedule
Water$5,987.00
  • Water Impact Fee (SAWS) — High Elevation
    San Antonio Water System (SAWS)
    SAWS water impact fee (highest of three elevation zones), effective July 1, 2024, per EDU. Amount = flat water supply + delivery flow + system development by elevation zone; Low and Middle zones are lower.
    $5,987.00
Sewer$5,541.00
  • Wastewater Impact Fee (SAWS) — Upper Collection Zone
    San Antonio Water System (SAWS)
    SAWS wastewater impact fee (highest of the service-area combinations, Upper Collection), effective July 1, 2024, per EDU. The city operates its own sewer collection lines with SAWS treatment. Amount = treatment + collection charge by drainage service area; other areas are lower.
    $5,541.00Requires confirmation
City$1,500.00
  • Parkland Dedication Fee-in-Lieu (City of Olmos Park)
    City of Olmos Park
    Parkland dedication fee-in-lieu of $1,500 per dwelling unit (flat, same for single-family and multifamily) where fewer than 15 units are platted; larger developments dedicate 0.25 acre per 15 units instead. Effective March 10, 1999.
    $1,500.00Requires confirmation
County$0.00
  • County Impact Fees (Bexar County)
    Bexar County
    Texas counties cannot charge impact fees on new development except a storm water and drainage fee in a county of 3.3 million or more people or one bordering such a county; Bexar County does not qualify and levies none.
    $0.00
Total (Olmos Park): $13,028.00
Sources last checked Official fee schedules:San Antonio Water System (SAWS) City of Olmos Park Bexar County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Olmos Park: Multifamily Impact Fees

A new multifamily unit in Olmos Park pays $7,264.00 per unit in impact fees (rates sourced November 3, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (SAWS, MF) — High Elevation ($2,993.50).

Parkland Dedication Fee-in-Lieu (City of Olmos Park, MF) and Wastewater Impact Fee (SAWS, MF) — Upper Collection Zone are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Olmos Park Impact Fee Schedule
Water$2,993.50
  • Water Impact Fee (SAWS, MF) — High Elevation
    San Antonio Water System (SAWS)
    SAWS water impact fee (highest of three elevation zones), effective July 1, 2024; a master-metered apartment unit is assessed 0.5 EDU (half the single-family fee), while individually metered apartments, condominiums and townhomes pay by meter size. Low and Middle zones are lower.
    $2,993.50
Sewer$2,770.50
  • Wastewater Impact Fee (SAWS, MF) — Upper Collection Zone
    San Antonio Water System (SAWS)
    SAWS wastewater impact fee (highest of the service-area combinations, Upper Collection), effective July 1, 2024; a master-metered apartment unit is assessed 0.5 EDU, while individually metered units pay by meter size. The city operates its own sewer collection lines with SAWS treatment. Other areas are lower.
    $2,770.50Requires confirmation
City$1,500.00
  • Parkland Dedication Fee-in-Lieu (City of Olmos Park, MF)
    City of Olmos Park
    Parkland dedication fee-in-lieu of $1,500 per dwelling unit (flat, same rate as single-family) where fewer than 15 units are platted; larger developments dedicate 0.25 acre per 15 units. Effective March 10, 1999.
    $1,500.00Requires confirmation
County$0.00
  • County Impact Fees (Bexar County, MF)
    Bexar County
    Texas counties cannot charge impact fees on new development except a storm water and drainage fee in a county of 3.3 million or more people or one bordering such a county; Bexar County does not qualify and levies none.
    $0.00
Total (Olmos Park): $7,264.00
Sources last checked Official fee schedules:San Antonio Water System (SAWS) City of Olmos Park Bexar County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Olmos Park: Commercial Impact Fees

Commercial development in Olmos Park pays no per-square-foot impact fees, but owes $17,515.00 in one-time water and sewer connection fees (rates sourced November 3, 2026).

For a 50,000 sq ft building, that comes to about $17,515.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (SAWS) — High Elevation, 1" ($11,974.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Impact Fee (SAWS) — Upper Collection Zone is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Olmos Park Impact Fee Schedule
Water$11,974.00 one-time
  • Water Impact Fee (SAWS) — High Elevation, 1"
    San Antonio Water System (SAWS)
    SAWS water impact fee for plats recorded on or after July 1, 2024, charged by meter size: a 1 inch meter counts as 2 equivalent dwelling units at $5,987 each (supply, flow and system development components). High Elevation is the highest of three elevation zones; Low and Middle zones pay less. Service line installation is billed separately at cost.
    $11,974.00 one-time
Sewer$5,541.00 one-time
  • Wastewater Impact Fee (SAWS) — Upper Collection Zone
    San Antonio Water System (SAWS)
    SAWS wastewater impact fee for plats recorded on or after July 1, 2024: $5,541 per equivalent dwelling unit (collection plus treatment) in the Upper Collection area, the highest of six service areas. Each connection pays at least 1 unit; SAWS sets the unit count for nonresidential projects from projected wastewater demand at 200 gallons per day per unit.
    $5,541.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Olmos Park): $17,515.00 one-time (≈ $17,515.00 at 50,000 sq ft)
Sources last checked Official fee schedules:San Antonio Water System (SAWS) City of Olmos Park Bexar County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Olmos Park: Industrial Impact Fees

Industrial development in Olmos Park pays no per-square-foot impact fees, but owes $17,515.00 in one-time water and sewer connection fees (rates sourced November 3, 2026).

For a 50,000 sq ft building, that comes to about $17,515.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (SAWS) — High Elevation, 1" ($11,974.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Impact Fee (SAWS) — Upper Collection Zone is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Olmos Park Impact Fee Schedule
Water$11,974.00 one-time
  • Water Impact Fee (SAWS) — High Elevation, 1"
    San Antonio Water System (SAWS)
    SAWS water impact fee for plats recorded on or after July 1, 2024, charged by meter size: a 1 inch meter counts as 2 equivalent dwelling units at $5,987 each (supply, flow and system development components). High Elevation is the highest of three elevation zones; Low and Middle zones pay less. Service line installation is billed separately at cost.
    $11,974.00 one-time
Sewer$5,541.00 one-time
  • Wastewater Impact Fee (SAWS) — Upper Collection Zone
    San Antonio Water System (SAWS)
    SAWS wastewater impact fee for plats recorded on or after July 1, 2024: $5,541 per equivalent dwelling unit (collection plus treatment) in the Upper Collection area, the highest of six service areas. Each connection pays at least 1 unit; SAWS sets the unit count for nonresidential projects from projected wastewater demand at 200 gallons per day per unit.
    $5,541.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Olmos Park): $17,515.00 one-time (≈ $17,515.00 at 50,000 sq ft)
Sources last checked Official fee schedules:San Antonio Water System (SAWS) City of Olmos Park Bexar County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Olmos Park: Office Impact Fees

Office development in Olmos Park pays no per-square-foot impact fees, but owes $17,515.00 in one-time water and sewer connection fees (rates sourced November 3, 2026).

For a 25,000 sq ft building, that comes to about $17,515.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (SAWS) — High Elevation, 1" ($11,974.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Impact Fee (SAWS) — Upper Collection Zone is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Olmos Park Impact Fee Schedule
Water$11,974.00 one-time
  • Water Impact Fee (SAWS) — High Elevation, 1"
    San Antonio Water System (SAWS)
    SAWS water impact fee for plats recorded on or after July 1, 2024, charged by meter size: a 1 inch meter counts as 2 equivalent dwelling units at $5,987 each (supply, flow and system development components). High Elevation is the highest of three elevation zones; Low and Middle zones pay less. Service line installation is billed separately at cost.
    $11,974.00 one-time
Sewer$5,541.00 one-time
  • Wastewater Impact Fee (SAWS) — Upper Collection Zone
    San Antonio Water System (SAWS)
    SAWS wastewater impact fee for plats recorded on or after July 1, 2024: $5,541 per equivalent dwelling unit (collection plus treatment) in the Upper Collection area, the highest of six service areas. Each connection pays at least 1 unit; SAWS sets the unit count for nonresidential projects from projected wastewater demand at 200 gallons per day per unit.
    $5,541.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Olmos Park): $17,515.00 one-time (≈ $17,515.00 at 25,000 sq ft)
Sources last checked Official fee schedules:San Antonio Water System (SAWS) City of Olmos Park Bexar County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Bexar County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Olmos Park Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Olmos Park Impact Fee FAQs

What are the total impact fees for a single-family home in Olmos Park, Texas?

A new single-family home in Olmos Park pays $13,028.00 per unit in combined impact fees (rates sourced November 3, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Olmos Park?

Commercial development in Olmos Park pays no per-square-foot impact fees, but owes $17,515.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Olmos Park charge its own impact fees?

Yes. Olmos Park levies its own municipal impact or utility fees. Bexar County does not currently add county-level impact fees inside Olmos Park. The schedule on this page shows every fee that applies to development in Olmos Park.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Bexar County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.