Lexington County, South Carolina Impact Fees

Impact fees in Lexington County depend on where you build. This page details the rates for unincorporated Lexington County: $8,687.00 per single-family unit as of . Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Lexington County Impact Fees by Project Type

Where in Lexington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Lexington County: Single-Family Impact Fees

A new single-family home in unincorporated Lexington County pays $8,687.00 per unit in impact fees (rates sourced November 18, 2026). All of it is levied by Lexington County.

The largest line items are Sewer Tap Fee — JMWSC ($4,600.00) and Water Tap Fee — JMWSC, 3/4" service incl. tap installation, $3,487 tap + $350 meter installation + $250 backflow ($4,087.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Lexington County Impact Fee Schedule
Water$4,087.00
  • Water Tap Fee — JMWSC, 3/4" service incl. tap installation, $3,487 tap + $350 meter installation + $250 backflow
    JMWSC, 3/4" service, tap installation included
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    Joint Municipal Water and Sewer Commission water tap fee for a 3/4 inch residential service, including installation of the tap. Where the tap is already made the fee is $3,100. A $350 meter installation fee is charged separately. JMWSC also charges a $350 meter installation fee and a $250 backflow installation fee on every new meter set, included in the amount shown.
    $4,087.00
Sewer$4,600.00
  • Sewer Tap Fee — JMWSC
    JMWSC, 3/4" service
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    Joint Municipal Water and Sewer Commission residential sewer tap fee for a 3/4 inch service. The Commission states that a sewer surcharge may be added when tap fees are invoiced.
    $4,600.00
City$0.00
County$0.00
Total (unincorporated Lexington County): $8,687.00

Unincorporated Lexington County: Multifamily Impact Fees

Unincorporated Lexington County has no published impact fee amounts for a new multifamily unit (rates sourced November 18, 2026). The schedule below documents the status of each fee.

Water Tap Fee (MF) — JMWSC and Sewer Tap Fee (MF) — JMWSC are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Lexington County Impact Fee Schedule
Water$0.00
  • Water Tap Fee (MF) — JMWSC
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    The Joint Municipal Water and Sewer Commission publishes a residential tap fee for a single 3/4 inch service only; it sets apartment tap charges under a tap fee policy that is not public, so no per-apartment amount is shown.
    Requires confirmation
Sewer$0.00
  • Sewer Tap Fee (MF) — JMWSC
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    The Joint Municipal Water and Sewer Commission publishes a residential sewer tap fee for a single service only; it sets apartment tap charges under a tap fee policy that is not public, so no per-apartment amount is shown.
    Requires confirmation
City$0.00
County$0.00
Total (unincorporated Lexington County): $0.00
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Lexington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Lexington County: Commercial Impact Fees

Commercial development in unincorporated Lexington County pays no per-square-foot impact fees, but owes $8,687.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 50,000 sq ft building, that comes to about $8,687.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (Lexington unincorp) — JMWSC, 3/4" service and Water Tap Fee (Lexington unincorp) — JMWSC, 3/4" service, tap installation included, $3,487 tap + $350 meter installation + $250 backflow are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Lexington County Impact Fee Schedule
Water$4,087.00 one-time
Sewer$4,600.00 one-time
City$0.00
County$0.00
Total (unincorporated Lexington County): $8,687.00 one-time (≈ $8,687.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Lexington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Lexington County: Industrial Impact Fees

Industrial development in unincorporated Lexington County pays no per-square-foot impact fees, but owes $8,687.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 50,000 sq ft building, that comes to about $8,687.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (Lexington unincorp) — JMWSC, 3/4" service and Water Tap Fee (Lexington unincorp) — JMWSC, 3/4" service, tap installation included, $3,487 tap + $350 meter installation + $250 backflow are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Lexington County Impact Fee Schedule
Water$4,087.00 one-time
Sewer$4,600.00 one-time
City$0.00
County$0.00
Total (unincorporated Lexington County): $8,687.00 one-time (≈ $8,687.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Lexington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Lexington County: Office Impact Fees

Office development in unincorporated Lexington County pays no per-square-foot impact fees, but owes $8,687.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 25,000 sq ft building, that comes to about $8,687.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (Lexington unincorp) — JMWSC, 3/4" service and Water Tap Fee (Lexington unincorp) — JMWSC, 3/4" service, tap installation included, $3,487 tap + $350 meter installation + $250 backflow are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Lexington County Impact Fee Schedule
Water$4,087.00 one-time
Sewer$4,600.00 one-time
City$0.00
County$0.00
Total (unincorporated Lexington County): $8,687.00 one-time (≈ $8,687.00 at 25,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Lexington County Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Lexington County Impact Fee FAQs

What are single-family impact fees in Lexington County, South Carolina?

A new single-family home in unincorporated Lexington County pays $8,687.00 per unit in impact fees (rates sourced November 18, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are commercial impact fees in Lexington County?

Commercial development in unincorporated Lexington County pays no per-square-foot impact fees, but owes $8,687.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Do cities in Lexington County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 10 of 14 cities in Lexington County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.