West Columbia, South Carolina Impact Fees

West Columbia applies its own fee schedule. Lexington County does not currently add county-level impact fees inside city limits. A new single-family home pays $2,600.00 per unit (rates sourced ). The full breakdown is below.

West Columbia Impact Fees by Project Type

West Columbia: Single-Family Impact Fees

A new single-family home in West Columbia pays $2,600.00 per unit in impact fees (rates sourced August 15, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Capacity Fee (City of West Columbia) — residential, inside city ($1,250.00), Water Capacity Fee (City of West Columbia) — 3/4", inside city ($600.00) and Water Tap Fee (City of West Columbia) — 3/4", inside city ($450.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full West Columbia Impact Fee Schedule
Water$1,050.00
Sewer$1,550.00
City$0.00
County$0.00
Total (West Columbia): $2,600.00
Sources last checked Official fee schedules:City of West Columbia Lexington County

West Columbia: Multifamily Impact Fees

A new multifamily unit in West Columbia pays at least $937.50 per unit in impact fees (rates sourced August 15, 2026). Every line item is levied at the municipal or utility level.

Sewer Capacity Fee (City of West Columbia, MF) - 0.75 REU x $1,250/REU, inside city is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Capacity Fee (City of West Columbia, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full West Columbia Impact Fee Schedule
Water$0.00
  • Water Capacity Fee (City of West Columbia, MF)
    City of West Columbia
    The City of West Columbia prices its water capacity fee by meter size only, so an apartment building pays once for its master meter and no per-apartment amount is published. The sewer capacity fee is charged per unit and is listed separately.
    Requires confirmation
Sewer$937.50
  • Sewer Capacity Fee (City of West Columbia, MF) - 0.75 REU x $1,250/REU, inside city
    Residential, inside city, per REU (300 GPD)
    City of West Columbia
    City of West Columbia sewer capacity fee inside city limits: $1,250 per residential equivalency unit of 300 gallons per day at the residential rate ($1,500 at the commercial rate; outside the city the fee doubles). An apartment is shown here at 0.75 unit, the state design flow for a 2 bedroom unit.
    $937.50Requires confirmation
City$0.00
County$0.00
Total (West Columbia): $937.50
Sources last checked Official fee schedules:City of West Columbia Lexington County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

West Columbia: Commercial Impact Fees

Commercial development in West Columbia pays no per-square-foot impact fees, but owes $3,000.00 in one-time water and sewer connection fees (rates sourced August 15, 2026).

For a 50,000 sq ft building, that comes to about $3,000.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of West Columbia) — Commercial, per REU ($1,500.00 one-time) and Water Capacity Fee (City of West Columbia) — 1" meter ($1,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full West Columbia Impact Fee Schedule
Water$1,500.00 one-time
Sewer$1,500.00 one-time
City$0.00
County$0.00
Total (West Columbia): $3,000.00 one-time (≈ $3,000.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of West Columbia Lexington County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Lexington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

West Columbia: Industrial Impact Fees

Industrial development in West Columbia pays no per-square-foot impact fees, but owes $3,000.00 in one-time water and sewer connection fees (rates sourced August 15, 2026).

For a 50,000 sq ft building, that comes to about $3,000.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of West Columbia) — Commercial, per REU ($1,500.00 one-time) and Water Capacity Fee (City of West Columbia) — 1" meter ($1,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full West Columbia Impact Fee Schedule
Water$1,500.00 one-time
Sewer$1,500.00 one-time
City$0.00
County$0.00
Total (West Columbia): $3,000.00 one-time (≈ $3,000.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of West Columbia Lexington County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Lexington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

West Columbia: Office Impact Fees

Office development in West Columbia pays no per-square-foot impact fees, but owes $3,000.00 in one-time water and sewer connection fees (rates sourced August 15, 2026).

For a 25,000 sq ft building, that comes to about $3,000.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of West Columbia) — Commercial, per REU ($1,500.00 one-time) and Water Capacity Fee (City of West Columbia) — 1" meter ($1,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full West Columbia Impact Fee Schedule
Water$1,500.00 one-time
Sewer$1,500.00 one-time
City$0.00
County$0.00
Total (West Columbia): $3,000.00 one-time (≈ $3,000.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of West Columbia Lexington County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Lexington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

West Columbia Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

West Columbia Impact Fee FAQs

What are the total impact fees for a single-family home in West Columbia, South Carolina?

A new single-family home in West Columbia pays $2,600.00 per unit in combined impact fees (rates sourced August 15, 2026).

How much are commercial impact fees in West Columbia?

Commercial development in West Columbia pays no per-square-foot impact fees, but owes $3,000.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does West Columbia charge its own impact fees?

Yes. West Columbia levies its own municipal impact or utility fees. Lexington County does not currently add county-level impact fees inside West Columbia. The schedule on this page shows every fee that applies to development in West Columbia.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Lexington County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000