Swansea does not levy its own municipal impact fees. New development in Swansea pays Lexington County impact fees, shown below: $8,687.00 per single-family unit (rates sourced ).

Swansea Impact Fees by Project Type

Swansea: Single-Family Impact Fees

A new single-family home in Swansea pays $8,687.00 per unit in impact fees (rates sourced November 18, 2026). All of it is levied by Lexington County.

The largest line items are Sewer Tap Fee (JMWSC) ($4,600.00), Water Tap Fee (JMWSC) - 3/4" service, incl. tap installation ($3,487.00) and Meter Installation Fee (JMWSC) — $350 meter installation + $250 backflow installation ($600.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Swansea Impact Fee Schedule
Water$4,087.00
  • Water Tap Fee (JMWSC) - 3/4" service, incl. tap installation
    3/4" service, tap installation included
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    Since February 1, 2026, the Joint Municipal Water and Sewer Commission provides water and sewer service in Swansea. Tap fee for a 3/4 inch residential service including tap installation; $3,100 where the tap is already made. A $350 meter installation fee is charged separately.
    $3,487.00
  • Meter Installation Fee (JMWSC) — $350 meter installation + $250 backflow installation
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    Joint Municipal Water and Sewer Commission charges a one-time $350 meter installation fee and a $250 backflow installation fee on every new meter set, in addition to the water tap fee.
    $600.00
Sewer$4,600.00
  • Sewer Tap Fee (JMWSC)
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    Since February 1, 2026, the Joint Municipal Water and Sewer Commission provides sewer service in Swansea. Residential sewer tap fee for a 3/4 inch service; the Commission states that a sewer surcharge may be added when tap fees are invoiced.
    $4,600.00
City$0.00
  • City Development Impact Fee (Town of Swansea - none levied)
    Town of Swansea
    The Town of Swansea's code contains no development impact fee. Since February 1, 2026, water and sewer connection fees in Swansea are charged by the Joint Municipal Water and Sewer Commission and are listed separately.
    $0.00
County$0.00
Total (Swansea): $8,687.00

Swansea: Multifamily Impact Fees

Swansea has no published impact fee amounts for a new multifamily unit (rates sourced November 18, 2026). The schedule below documents the status of each fee.

Sewer Tap Fee (JMWSC, MF) and Water Tap Fee (JMWSC, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Swansea Impact Fee Schedule
Water$0.00
  • Water Tap Fee (JMWSC, MF)
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    Since February 1, 2026, the Joint Municipal Water and Sewer Commission provides water service in Swansea. It publishes a residential tap fee for a single service only, so no per-apartment amount is shown. The Town's former tap fees no longer apply.
    Requires confirmation
Sewer$0.00
  • Sewer Tap Fee (JMWSC, MF)
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    Since February 1, 2026, the Joint Municipal Water and Sewer Commission provides sewer service in Swansea. It publishes a residential sewer tap fee for a single service only, so no per-apartment amount is shown. The Town's former tap fees no longer apply.
    Requires confirmation
City$0.00
County$0.00
Total (Swansea): $0.00
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Swansea: Commercial Impact Fees

Commercial development in Swansea pays no per-square-foot impact fees, but owes $8,687.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 50,000 sq ft building, that comes to about $8,687.00. The calculator below adjusts to your exact square footage.

The largest line items are Meter Installation Fee (JMWSC, Swansea) — $350 meter installation + $250 backflow installation ($600.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (JMWSC, Swansea) — 3/4" service and Water Tap Fee (JMWSC, Swansea) — 3/4" service, incl. tap installation are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Swansea Impact Fee Schedule
Water$4,087.00 one-time
  • Water Tap Fee (JMWSC, Swansea) — 3/4" service, incl. tap installation
    3/4" service, tap installation included
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    One-time JMWSC water tap fee for a 3/4" service including tap installation; a lower fee applies where the tap is already made. JMWSC publishes only the 3/4" price; larger commercial meters are priced by the utility, and its separate meter installation fee is added to commercial tap fees.
    $3,487.00 one-timeRequires confirmation
  • Meter Installation Fee (JMWSC, Swansea) — $350 meter installation + $250 backflow installation
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    Joint Municipal Water and Sewer Commission charges a one-time $350 meter installation fee and a $250 backflow installation fee on every new meter set, in addition to the water tap fee.
    $600.00 one-time
Sewer$4,600.00 one-time
  • Sewer Tap Fee (JMWSC, Swansea) — 3/4" service
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    JMWSC publishes a sewer tap fee of $4,600 (3/4" service). Larger commercial connections are sized and priced by JMWSC engineering. Rates reissued each July 1.
    $4,600.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Swansea): $8,687.00 one-time (≈ $8,687.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Lexington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Swansea: Industrial Impact Fees

Industrial development in Swansea pays no per-square-foot impact fees, but owes $8,687.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 50,000 sq ft building, that comes to about $8,687.00. The calculator below adjusts to your exact square footage.

The largest line items are Meter Installation Fee (JMWSC, Swansea) — $350 meter installation + $250 backflow installation ($600.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (JMWSC, Swansea) — 3/4" service and Water Tap Fee (JMWSC, Swansea) — 3/4" service, incl. tap installation are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Swansea Impact Fee Schedule
Water$4,087.00 one-time
  • Water Tap Fee (JMWSC, Swansea) — 3/4" service, incl. tap installation
    3/4" service, tap installation included
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    One-time JMWSC water tap fee for a 3/4" service including tap installation; a lower fee applies where the tap is already made. JMWSC publishes only the 3/4" price; larger commercial meters are priced by the utility, and its separate meter installation fee is added to commercial tap fees.
    $3,487.00 one-timeRequires confirmation
  • Meter Installation Fee (JMWSC, Swansea) — $350 meter installation + $250 backflow installation
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    Joint Municipal Water and Sewer Commission charges a one-time $350 meter installation fee and a $250 backflow installation fee on every new meter set, in addition to the water tap fee.
    $600.00 one-time
Sewer$4,600.00 one-time
  • Sewer Tap Fee (JMWSC, Swansea) — 3/4" service
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    JMWSC publishes a sewer tap fee of $4,600 (3/4" service). Larger commercial connections are sized and priced by JMWSC engineering. Rates reissued each July 1.
    $4,600.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Swansea): $8,687.00 one-time (≈ $8,687.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Lexington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Swansea: Office Impact Fees

Office development in Swansea pays no per-square-foot impact fees, but owes $8,687.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 25,000 sq ft building, that comes to about $8,687.00. The calculator below adjusts to your exact square footage.

The largest line items are Meter Installation Fee (JMWSC, Swansea) — $350 meter installation + $250 backflow installation ($600.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (JMWSC, Swansea) — 3/4" service and Water Tap Fee (JMWSC, Swansea) — 3/4" service, incl. tap installation are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Swansea Impact Fee Schedule
Water$4,087.00 one-time
  • Water Tap Fee (JMWSC, Swansea) — 3/4" service, incl. tap installation
    3/4" service, tap installation included
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    One-time JMWSC water tap fee for a 3/4" service including tap installation; a lower fee applies where the tap is already made. JMWSC publishes only the 3/4" price; larger commercial meters are priced by the utility, and its separate meter installation fee is added to commercial tap fees.
    $3,487.00 one-timeRequires confirmation
  • Meter Installation Fee (JMWSC, Swansea) — $350 meter installation + $250 backflow installation
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    Joint Municipal Water and Sewer Commission charges a one-time $350 meter installation fee and a $250 backflow installation fee on every new meter set, in addition to the water tap fee.
    $600.00 one-time
Sewer$4,600.00 one-time
  • Sewer Tap Fee (JMWSC, Swansea) — 3/4" service
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    JMWSC publishes a sewer tap fee of $4,600 (3/4" service). Larger commercial connections are sized and priced by JMWSC engineering. Rates reissued each July 1.
    $4,600.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Swansea): $8,687.00 one-time (≈ $8,687.00 at 25,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Lexington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Swansea Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Swansea Impact Fee FAQs

What are the total impact fees for a single-family home in Swansea, South Carolina?

A new single-family home in Swansea pays $8,687.00 per unit in combined impact fees (rates sourced November 18, 2026).

How much are commercial impact fees in Swansea?

Commercial development in Swansea pays no per-square-foot impact fees, but owes $8,687.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Swansea charge its own impact fees?

No. Swansea does not levy its own municipal impact fees. New development in Swansea pays Lexington County impact fees, shown on this page.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Lexington County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000