South Congaree, South Carolina Impact Fees

South Congaree applies its own fee schedule: municipal fees plus the Lexington County-levied fees that apply inside city limits. Combined, a new single-family home pays $6,587.00 per unit (rates sourced ). The full breakdown is below.

South Congaree Impact Fees by Project Type

South Congaree: Single-Family Impact Fees

A new single-family home in South Congaree pays $6,587.00 per unit in impact fees (rates sourced November 18, 2026). Of that, Lexington County-levied fees account for $4,087.00 and municipal or utility fees for $2,500.00.

The largest line items are Water Connection Fee — JMWSC, 3/4" tap incl. installation, $3,487 tap + $350 meter installation + $250 backflow ($4,087.00) and Sewer Capacity Fee (City of Cayce) - per REU ($2,500.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full South Congaree Impact Fee Schedule
Water$4,087.00
  • Water Connection Fee — JMWSC, 3/4" tap incl. installation, $3,487 tap + $350 meter installation + $250 backflow
    JMWSC - western portion of town (default provider)
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    Joint Municipal Water and Sewer Commission tap fee for a 3/4 inch residential service including tap installation ($3,100 where the tap is already made). Part of the town is served by the City of Cayce instead (see the alternate option). JMWSC also charges a $350 meter installation fee and a $250 backflow installation fee on every new meter set, included in the amount shown.
    $4,087.00
Sewer$2,500.00
  • Sewer Capacity Fee (City of Cayce) - per REU
    City of Cayce
    City of Cayce sewer capacity fee per residential equivalent unit; a house is one unit. Charged in addition to the sewer tap.
    $2,500.00
  • Sewer Tap Fee (City of Cayce)
    City of Cayce
    The City of Cayce does not set a fixed sewer tap fee. Its adopted master fee schedule (effective July 2026) prices sewer taps at market price, quoted individually for each job based on actual cost, the same inside and outside the city. Cayce's scheduled one-time sewer charge is the $2,500 per REU sewer capacity fee, which is listed as a separate record.
    $0.00
City$0.00
County$0.00
Total (South Congaree): $6,587.00

South Congaree: Multifamily Impact Fees

A new multifamily unit in South Congaree pays at least $1,875.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.

Sewer Capacity Fee (City of Cayce, MF) - 0.75 REU x $2,500/REU is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Connection Fee (MF) — JMWSC is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full South Congaree Impact Fee Schedule
Water$0.00
  • Water Connection Fee (MF) — JMWSC
    JMWSC - western portion of town (default provider)
    Lexington County Joint Municipal Water & Sewer Commission (JMWSC)
    The western part of South Congaree is served with water by the Joint Municipal Water and Sewer Commission, which publishes a residential tap fee for a single service only; no per-apartment amount is shown.
    Requires confirmation
Sewer$1,875.00
  • Sewer Capacity Fee (City of Cayce, MF) - 0.75 REU x $2,500/REU
    City of Cayce
    Sewer capacity in South Congaree is provided by the City of Cayce: $2,500 per residential equivalent unit (300 gallons per day), effective July 1, 2026. Cayce publishes no apartment loading; an apartment is shown here at 0.75 unit, the state design flow for a 2 bedroom unit.
    $1,875.00Requires confirmation
City$0.00
County$0.00
Total (South Congaree): $1,875.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

South Congaree: Commercial Impact Fees

Commercial development in South Congaree pays no per-square-foot impact fees, but owes $6,587.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 50,000 sq ft building, that comes to about $6,587.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of Cayce) — per REU ($2,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Connection Fee — JMWSC, 3/4" tap incl. installation, $3,487 tap + $350 meter installation + $250 backflow is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full South Congaree Impact Fee Schedule
Water$4,087.00 one-time
  • Water Connection Fee — JMWSC, 3/4" tap incl. installation, $3,487 tap + $350 meter installation + $250 backflow
    JMWSC, western portion, 3/4" tap incl. installation
    Joint Municipal Water and Sewer Commission
    Water service in South Congaree is split by area: JMWSC serves the western portion and the City of Cayce the eastern portion. JMWSC's one-time water tap is $3,487 for a 3/4" service including installation, plus a separate meter installation fee on commercial taps; larger commercial meters are priced by the utility. JMWSC also charges a $350 meter installation fee and a $250 backflow installation fee on every new meter set, included in the amount shown.
    $4,087.00 one-timeRequires confirmation
Sewer$2,500.00 one-time
  • Sewer Capacity Fee (City of Cayce) — per REU
    City of Cayce
    Where the City of Cayce provides sewer service: one-time sewer capacity fee, $2,500 per REU (same inside and outside the city). Nonresidential REU count is derived from estimated flow; the figure shown is the one-REU minimum. Effective 7/1/2026.
    $2,500.00 one-time
  • Sewer Tap Fee (City of Cayce) — market price
    City of Cayce
    The City of Cayce, which sewers parts of South Congaree, does not set a fixed sewer tap fee. Its adopted master fee schedule (effective July 2026) prices sewer taps at market price, quoted per job at actual cost, the same inside and outside the city. The scheduled one-time sewer charge is the $2,500 per REU capacity fee, listed separately.
    $0.00
City$0.00
County$0.00
Total (South Congaree): $6,587.00 one-time (≈ $6,587.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Joint Municipal Water and Sewer Commission City of Cayce Town of South Congaree Lexington County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Lexington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

South Congaree: Industrial Impact Fees

Industrial development in South Congaree pays no per-square-foot impact fees, but owes $6,587.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 50,000 sq ft building, that comes to about $6,587.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of Cayce) — per REU ($2,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Connection Fee — JMWSC, 3/4" tap incl. installation, $3,487 tap + $350 meter installation + $250 backflow is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full South Congaree Impact Fee Schedule
Water$4,087.00 one-time
  • Water Connection Fee — JMWSC, 3/4" tap incl. installation, $3,487 tap + $350 meter installation + $250 backflow
    JMWSC, western portion, 3/4" tap incl. installation
    Joint Municipal Water and Sewer Commission
    Water service in South Congaree is split by area: JMWSC serves the western portion and the City of Cayce the eastern portion. JMWSC's one-time water tap is $3,487 for a 3/4" service including installation, plus a separate meter installation fee on commercial taps; larger commercial meters are priced by the utility. JMWSC also charges a $350 meter installation fee and a $250 backflow installation fee on every new meter set, included in the amount shown.
    $4,087.00 one-timeRequires confirmation
Sewer$2,500.00 one-time
  • Sewer Capacity Fee (City of Cayce) — per REU
    City of Cayce
    Where the City of Cayce provides sewer service: one-time sewer capacity fee, $2,500 per REU (same inside and outside the city). Nonresidential REU count is derived from estimated flow; the figure shown is the one-REU minimum. Effective 7/1/2026.
    $2,500.00 one-time
  • Sewer Tap Fee (City of Cayce) — market price
    City of Cayce
    The City of Cayce, which sewers parts of South Congaree, does not set a fixed sewer tap fee. Its adopted master fee schedule (effective July 2026) prices sewer taps at market price, quoted per job at actual cost, the same inside and outside the city. The scheduled one-time sewer charge is the $2,500 per REU capacity fee, listed separately.
    $0.00
City$0.00
County$0.00
Total (South Congaree): $6,587.00 one-time (≈ $6,587.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Joint Municipal Water and Sewer Commission City of Cayce Town of South Congaree Lexington County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Lexington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

South Congaree: Office Impact Fees

Office development in South Congaree pays no per-square-foot impact fees, but owes $6,587.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 25,000 sq ft building, that comes to about $6,587.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of Cayce) — per REU ($2,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Connection Fee — JMWSC, 3/4" tap incl. installation, $3,487 tap + $350 meter installation + $250 backflow is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full South Congaree Impact Fee Schedule
Water$4,087.00 one-time
  • Water Connection Fee — JMWSC, 3/4" tap incl. installation, $3,487 tap + $350 meter installation + $250 backflow
    JMWSC, western portion, 3/4" tap incl. installation
    Joint Municipal Water and Sewer Commission
    Water service in South Congaree is split by area: JMWSC serves the western portion and the City of Cayce the eastern portion. JMWSC's one-time water tap is $3,487 for a 3/4" service including installation, plus a separate meter installation fee on commercial taps; larger commercial meters are priced by the utility. JMWSC also charges a $350 meter installation fee and a $250 backflow installation fee on every new meter set, included in the amount shown.
    $4,087.00 one-timeRequires confirmation
Sewer$2,500.00 one-time
  • Sewer Capacity Fee (City of Cayce) — per REU
    City of Cayce
    Where the City of Cayce provides sewer service: one-time sewer capacity fee, $2,500 per REU (same inside and outside the city). Nonresidential REU count is derived from estimated flow; the figure shown is the one-REU minimum. Effective 7/1/2026.
    $2,500.00 one-time
  • Sewer Tap Fee (City of Cayce) — market price
    City of Cayce
    The City of Cayce, which sewers parts of South Congaree, does not set a fixed sewer tap fee. Its adopted master fee schedule (effective July 2026) prices sewer taps at market price, quoted per job at actual cost, the same inside and outside the city. The scheduled one-time sewer charge is the $2,500 per REU capacity fee, listed separately.
    $0.00
City$0.00
County$0.00
Total (South Congaree): $6,587.00 one-time (≈ $6,587.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Joint Municipal Water and Sewer Commission City of Cayce Town of South Congaree Lexington County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Lexington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

South Congaree Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

South Congaree Impact Fee FAQs

What are the total impact fees for a single-family home in South Congaree, South Carolina?

A new single-family home in South Congaree pays $6,587.00 per unit in combined impact fees (rates sourced November 18, 2026).

How much are commercial impact fees in South Congaree?

Commercial development in South Congaree pays no per-square-foot impact fees, but owes $6,587.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does South Congaree charge its own impact fees?

Yes. South Congaree levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in South Congaree, with the combined total.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Lexington County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.