Irmo Impact Fees by Project Type
Irmo: Single-Family Impact Fees
A new single-family home in Irmo pays $6,452.00 per unit in impact fees (rates sourced October 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Capacity Fee — City of Columbia ($2,640.00), Water Meter Installation Fee (City of Columbia) — 3/4", City makes the tap ($2,512.00) and Sewer Tap Fee (City of Columbia) — City-installed tap ($1,300.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Irmo Impact Fee Schedule
- Water Meter Installation Fee (City of Columbia) — 3/4", City makes the tap$2,512.00City of Columbia (Columbia Water)City of Columbia water tap and meter fee for a 3/4 inch meter where the City makes a new tap. Columbia has no separate water capacity or impact fee.
- Sewer Capacity Fee — City of Columbia$2,640.00City of Columbia, per tap (400 GPD)City of Columbia (Columbia Water)City of Columbia sewer plant expansion fee, charged per sewer tap in addition to the tap fee. Part of Irmo in Richland County is served with sewer by Richland County Utilities instead, whose single sewer tap fee has no separate capacity charge (see the Richland County Utilities option).
- Sewer Tap Fee (City of Columbia) — City-installed tap$1,300.00City of Columbia (Columbia Water)City of Columbia sewer tap fee where the City makes the tap, charged with the separate sewer plant expansion fee. A developer-installed connection pays a lower tap fee.
- City Development Impact Fee (Town of Irmo - none levied)$0.00Town of IrmoThe Town of Irmo levies no development impact fee; its master fee schedule lists none.
- County Development Impact Fee (Lexington County - none levied)$0.00Lexington CountyLexington County levies no development impact fee. Its fee schedules effective July 1, 2026 list only plan review, permit and inspection charges.
Where in Lexington County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Irmo: Multifamily Impact Fees
A new multifamily unit in Irmo pays $5,297.00 per unit in impact fees (rates sourced October 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Meter Installation Fee (City of Columbia, MF) — 3/4", City makes the tap ($2,512.00), Sewer Capacity Fee (MF) — City of Columbia, 2BR = 225 gpd / 400 gpd per ERU × $2,640/ERU ($1,485.00) and Sewer Tap Fee (City of Columbia, MF) — City-installed tap ($1,300.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Irmo Impact Fee Schedule
- Water Meter Installation Fee (City of Columbia, MF) — 3/4", City makes the tap$2,512.00City of Columbia (Columbia Water)City of Columbia water tap and meter fee for a 3/4 inch meter where the City makes a new tap, shown for one unit on its own connection. A building served through one master meter pays once at that meter's size (1.5 inch $4,350, 2 inch $8,490). Where the developer installs the tap, only the meter fee applies (see the developer-installed option). Columbia has no water capacity or impact fee.
- Sewer Capacity Fee (MF) — City of Columbia, 2BR = 225 gpd / 400 gpd per ERU × $2,640/ERU$1,485.00City of Columbia, 2 bedroom (225 GPD)City of Columbia (Columbia Water)City of Columbia sewer capacity fee of $2,640 per tap, where one tap equals 400 gallons per day. Columbia's loading table puts a 2 bedroom apartment at 225 gallons per day, so each unit pays 0.5625 of the fee. Charged in addition to the sewer tap fee.
- Sewer Tap Fee (City of Columbia, MF) — City-installed tap$1,300.00City of Columbia, City-installed tapCity of Columbia (Columbia Water)City of Columbia sewer tap fee where the City makes a new tap, shown for one unit on its own connection and charged with the separate sewer plant expansion fee. A building on one sewer connection pays once. Where the developer installs the connection, a lower fee applies (see the developer-installed option).
- City Development Impact Fee (Town of Irmo - none levied) (MF)$0.00Town of IrmoThe Town of Irmo levies no development impact fee; its master fee schedule lists none.
- County Development Impact Fee (Lexington County - none levied) (MF)$0.00Lexington CountyLexington County levies no development impact fee. Its fee schedules effective July 1, 2026 list only plan review, permit and inspection charges.
Where in Lexington County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Irmo: Commercial Impact Fees
Commercial development in Irmo pays no per-square-foot impact fees, but owes $7,408.00 in one-time water and sewer connection fees (rates sourced October 18, 2026).
For a 50,000 sq ft building, that comes to about $7,408.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Installation Fee (City of Columbia) — 1" meter ($3,468.00 one-time), Sewer Capacity Fee (Irmo) — City of Columbia, per ERU (400 gpd) ($2,640.00 one-time) and Sewer Tap Fee (Irmo) — City of Columbia, City-installed tap ($1,300.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Irmo Impact Fee Schedule
- Water Meter Installation Fee (City of Columbia) — 1" meter$3,468.00 one-timeCity of ColumbiaOne-time water meter installation charge where Columbia Water makes the tap; 1" meter (default tier). No inside/outside-city differential on one-time charges. Columbia Water is the water provider in Irmo.
- Sewer Capacity Fee (Irmo) — City of Columbia, per ERU (400 gpd)$2,640.00 one-timeCity of ColumbiaOne-time sewer capacity fee, $2,640 per ERU (1 ERU = 400 gpd). Nonresidential ERU count is based on SCDHEC estimated flow, so the total scales with the building's flow; the figure shown is the one-ERU minimum. Projects at or above 300,000 gpd pay the computed amount plus $1.00 per gallon above 300,000 gpd. Charged in addition to the sewer tap fee.
- Sewer Tap Fee (Irmo) — City of Columbia, City-installed tap$1,300.00 one-timeCity of ColumbiaOne-time sewer tap fee, $1,300 per tap where Columbia Water installs the tap (default). A reduced $300 rate applies where the developer/owner installs the tap. Separate from and in addition to the sewer capacity fee.
- City Development Impact Fee (Town of Irmo, Commercial)$0.00Town of IrmoThe Town of Irmo does not levy a development or impact fee.
- County Development Impact Fee (Lexington County, Commercial)$0.00Lexington CountyLexington County does not levy a development impact fee.
Where in Lexington County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Irmo: Industrial Impact Fees
Industrial development in Irmo pays no per-square-foot impact fees, but owes $7,408.00 in one-time water and sewer connection fees (rates sourced October 18, 2026).
For a 50,000 sq ft building, that comes to about $7,408.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Installation Fee (City of Columbia) — 1" meter ($3,468.00 one-time), Sewer Capacity Fee (Irmo) — City of Columbia, per ERU (400 gpd) ($2,640.00 one-time) and Sewer Tap Fee (Irmo) — City of Columbia, City-installed tap ($1,300.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Irmo Impact Fee Schedule
- Water Meter Installation Fee (City of Columbia) — 1" meter$3,468.00 one-timeCity of ColumbiaOne-time water meter installation charge where Columbia Water makes the tap; 1" meter (default tier). No inside/outside-city differential on one-time charges. Columbia Water is the water provider in Irmo.
- Sewer Capacity Fee (Irmo) — City of Columbia, per ERU (400 gpd)$2,640.00 one-timeCity of ColumbiaOne-time sewer capacity fee, $2,640 per ERU (1 ERU = 400 gpd). Nonresidential ERU count is based on SCDHEC estimated flow, so the total scales with the building's flow; the figure shown is the one-ERU minimum. Projects at or above 300,000 gpd pay the computed amount plus $1.00 per gallon above 300,000 gpd. Charged in addition to the sewer tap fee.
- Sewer Tap Fee (Irmo) — City of Columbia, City-installed tap$1,300.00 one-timeCity of ColumbiaOne-time sewer tap fee, $1,300 per tap where Columbia Water installs the tap (default). A reduced $300 rate applies where the developer/owner installs the tap. Separate from and in addition to the sewer capacity fee.
- City Development Impact Fee (Town of Irmo, Industrial)$0.00Town of IrmoThe Town of Irmo does not levy a development or impact fee.
- County Development Impact Fee (Lexington County, Industrial)$0.00Lexington CountyLexington County does not levy a development impact fee.
Where in Lexington County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Irmo: Office Impact Fees
Office development in Irmo pays no per-square-foot impact fees, but owes $7,408.00 in one-time water and sewer connection fees (rates sourced October 18, 2026).
For a 25,000 sq ft building, that comes to about $7,408.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Installation Fee (City of Columbia) — 1" meter ($3,468.00 one-time), Sewer Capacity Fee (Irmo) — City of Columbia, per ERU (400 gpd) ($2,640.00 one-time) and Sewer Tap Fee (Irmo) — City of Columbia, City-installed tap ($1,300.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Irmo Impact Fee Schedule
- Water Meter Installation Fee (City of Columbia) — 1" meter$3,468.00 one-timeCity of ColumbiaOne-time water meter installation charge where Columbia Water makes the tap; 1" meter (default tier). No inside/outside-city differential on one-time charges. Columbia Water is the water provider in Irmo.
- Sewer Capacity Fee (Irmo) — City of Columbia, per ERU (400 gpd)$2,640.00 one-timeCity of ColumbiaOne-time sewer capacity fee, $2,640 per ERU (1 ERU = 400 gpd). Nonresidential ERU count is based on SCDHEC estimated flow, so the total scales with the building's flow; the figure shown is the one-ERU minimum. Projects at or above 300,000 gpd pay the computed amount plus $1.00 per gallon above 300,000 gpd. Charged in addition to the sewer tap fee.
- Sewer Tap Fee (Irmo) — City of Columbia, City-installed tap$1,300.00 one-timeCity of ColumbiaOne-time sewer tap fee, $1,300 per tap where Columbia Water installs the tap (default). A reduced $300 rate applies where the developer/owner installs the tap. Separate from and in addition to the sewer capacity fee.
- City Development Impact Fee (Town of Irmo, Office)$0.00Town of IrmoThe Town of Irmo does not levy a development or impact fee.
- County Development Impact Fee (Lexington County, Office)$0.00Lexington CountyLexington County does not levy a development impact fee.
Where in Lexington County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Irmo Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Irmo Impact Fee FAQs
What are the total impact fees for a single-family home in Irmo, South Carolina?
A new single-family home in Irmo pays $6,452.00 per unit in combined impact fees (rates sourced October 18, 2026).
How much are commercial impact fees in Irmo?
Commercial development in Irmo pays no per-square-foot impact fees, but owes $7,408.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Irmo charge its own impact fees?
Yes. Irmo levies its own municipal impact or utility fees. Lexington County does not currently add county-level impact fees inside Irmo. The schedule on this page shows every fee that applies to development in Irmo.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Lexington County impact fees page.