Skip to content
IMPACTFEES.ORG

Cayce, South Carolina Impact Fees

Cayce applies its own fee schedule. Lexington County does not currently add county-level impact fees inside city limits. A new single-family home pays $4,220.00 per unit (rates sourced ). The full breakdown is below.

Cayce Impact Fees by Project Type

Cayce: Single-Family Impact Fees

A new single-family home in Cayce pays $4,220.00 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Capacity Fee (City of Cayce) - per REU ($2,500.00) and Water Capacity Fee (City of Cayce) - per REU ($1,720.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Cayce Impact Fee Schedule
Water$1,720.00
  • Water Capacity Fee (City of Cayce) - per REU
    City of Cayce
    City of Cayce water capacity fee per residential equivalent unit; a house is one unit. The same rate applies inside and outside the city. The water tap and meter are priced at market cost.
    $1,720.00
  • Water Tap Fee (City of Cayce)
    3/4" - schedule says 'Market Price'
    City of Cayce
    The City of Cayce does not set a fixed water tap fee. Its adopted master fee schedule (effective July 2026) prices water taps and meter installation at market price, meaning the charge is quoted individually for each job based on actual cost. Cayce's scheduled one-time water charge is the $1,720 per REU water capacity fee, which is listed as a separate record.
    $0.00
Sewer$2,500.00
  • Sewer Capacity Fee (City of Cayce) - per REU
    City of Cayce
    City of Cayce sewer capacity fee per residential equivalent unit; a house is one unit. The same rate applies inside and outside the city. Charged in addition to the sewer tap.
    $2,500.00
  • Sewer Tap Fee (City of Cayce)
    City of Cayce
    The City of Cayce does not set a fixed sewer tap fee. Its adopted master fee schedule (effective July 2026) prices sewer taps at market price, meaning the charge is quoted individually for each job based on actual cost. Cayce's scheduled one-time sewer charge is the $2,500 per REU sewer capacity fee, which is listed as a separate record.
    $0.00
City$0.00
County$0.00
Total (Cayce): $4,220.00
Sources last checked Official fee schedules:City of Cayce Lexington County

Cayce: Multifamily Impact Fees

A new multifamily unit in Cayce pays $3,165.00 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.

Sewer Capacity Fee (City of Cayce, MF) - 0.75 REU x $2,500/REU and Water Capacity Fee (City of Cayce, MF) - 0.75 REU x $1,720/REU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Cayce Impact Fee Schedule
Water$1,290.00
  • Water Capacity Fee (City of Cayce, MF) - 0.75 REU x $1,720/REU
    City of Cayce
    City of Cayce water capacity fee of $1,720 per residential equivalent unit (300 gallons per day), the same inside and outside the city, effective July 1, 2026. Cayce publishes no apartment loading; an apartment is shown here at 0.75 unit, the state design flow for a 2 bedroom unit.
    $1,290.00Requires confirmation
  • Water Tap Fee (City of Cayce, MF)
    City of Cayce
    The City of Cayce does not set a fixed water tap fee. Its adopted master fee schedule (effective July 2026) prices water taps and meter installation at market price, quoted for each job at actual cost. The scheduled one-time charge is the water capacity fee, listed separately.
    $0.00
Sewer$1,875.00
  • Sewer Capacity Fee (City of Cayce, MF) - 0.75 REU x $2,500/REU
    City of Cayce
    City of Cayce sewer capacity fee of $2,500 per residential equivalent unit (300 gallons per day), the same inside and outside the city, effective July 1, 2026. Cayce publishes no apartment loading; an apartment is shown here at 0.75 unit, the state design flow for a 2 bedroom unit.
    $1,875.00Requires confirmation
  • Sewer Tap Fee (City of Cayce, MF)
    City of Cayce
    The City of Cayce does not set a fixed sewer tap fee. Its adopted master fee schedule (effective July 2026) prices sewer taps at market price, quoted for each job at actual cost. The scheduled one-time charge is the sewer capacity fee, listed separately.
    $0.00
City$0.00
County$0.00
Total (Cayce): $3,165.00
Sources last checked Official fee schedules:City of Cayce Lexington County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Cayce: Commercial Impact Fees

Commercial development in Cayce pays no per-square-foot impact fees, but owes $4,220.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).

For a 50,000 sq ft building, that comes to about $4,220.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of Cayce) — per REU ($2,500.00 one-time) and Water Capacity Fee (City of Cayce) — per REU ($1,720.00 one-time).

View the Full Cayce Impact Fee Schedule
Water$1,720.00 one-time
Sewer$2,500.00 one-time
  • Sewer Capacity Fee (City of Cayce) — per REU
    City of Cayce
    Sewer capacity fee is $2,500 per REU. A nonresidential project pays for multiple REUs based on SCDHEC unit-contributory-loading. Effective 7/1/2026; reissued each July.
    $2,500.00 one-time
  • Sewer Tap Fee (City of Cayce) — market price
    City of Cayce
    The City of Cayce does not set a fixed sewer tap fee. Its adopted master fee schedule (effective July 2026) prices sewer taps at market price, quoted individually for each job based on actual cost. Cayce's scheduled one-time sewer charge is the $2,500 per REU sewer capacity fee, listed separately.
    $0.00
City$0.00
County$0.00
Total (Cayce): $4,220.00 one-time (≈ $4,220.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Cayce Lexington County

Where in Lexington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cayce: Industrial Impact Fees

Industrial development in Cayce pays no per-square-foot impact fees, but owes $4,220.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).

For a 50,000 sq ft building, that comes to about $4,220.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of Cayce) — per REU ($2,500.00 one-time) and Water Capacity Fee (City of Cayce) — per REU ($1,720.00 one-time).

View the Full Cayce Impact Fee Schedule
Water$1,720.00 one-time
Sewer$2,500.00 one-time
  • Sewer Capacity Fee (City of Cayce) — per REU
    City of Cayce
    Sewer capacity fee is $2,500 per REU. A nonresidential project pays for multiple REUs based on SCDHEC unit-contributory-loading. Effective 7/1/2026; reissued each July.
    $2,500.00 one-time
  • Sewer Tap Fee (City of Cayce) — market price
    City of Cayce
    The City of Cayce does not set a fixed sewer tap fee. Its adopted master fee schedule (effective July 2026) prices sewer taps at market price, quoted individually for each job based on actual cost. Cayce's scheduled one-time sewer charge is the $2,500 per REU sewer capacity fee, listed separately.
    $0.00
City$0.00
County$0.00
Total (Cayce): $4,220.00 one-time (≈ $4,220.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Cayce Lexington County

Where in Lexington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cayce: Office Impact Fees

Office development in Cayce pays no per-square-foot impact fees, but owes $4,220.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).

For a 25,000 sq ft building, that comes to about $4,220.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (City of Cayce) — per REU ($2,500.00 one-time) and Water Capacity Fee (City of Cayce) — per REU ($1,720.00 one-time).

View the Full Cayce Impact Fee Schedule
Water$1,720.00 one-time
Sewer$2,500.00 one-time
  • Sewer Capacity Fee (City of Cayce) — per REU
    City of Cayce
    Sewer capacity fee is $2,500 per REU. A nonresidential project pays for multiple REUs based on SCDHEC unit-contributory-loading. Effective 7/1/2026; reissued each July.
    $2,500.00 one-time
  • Sewer Tap Fee (City of Cayce) — market price
    City of Cayce
    The City of Cayce does not set a fixed sewer tap fee. Its adopted master fee schedule (effective July 2026) prices sewer taps at market price, quoted individually for each job based on actual cost. Cayce's scheduled one-time sewer charge is the $2,500 per REU sewer capacity fee, listed separately.
    $0.00
City$0.00
County$0.00
Total (Cayce): $4,220.00 one-time (≈ $4,220.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Cayce Lexington County

Where in Lexington County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cayce Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Cayce Impact Fee FAQs

What are the total impact fees for a single-family home in Cayce, South Carolina?

A new single-family home in Cayce pays $4,220.00 per unit in combined impact fees (rates sourced November 13, 2026).

How much are commercial impact fees in Cayce?

Commercial development in Cayce pays no per-square-foot impact fees, but owes $4,220.00 in one-time water and sewer connection fees.

Does Cayce charge its own impact fees?

Yes. Cayce levies its own municipal impact or utility fees. Lexington County does not currently add county-level impact fees inside Cayce. The schedule on this page shows every fee that applies to development in Cayce.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Lexington County impact fees page.

Missing a jurisdiction? Get in touch.