A new single-family home in Lexington pays $8,113.00 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Parks & Recreation Impact Fee (Town of Lexington) ($1,349.00), Transportation Impact Fee (Town of Lexington) ($828.00) and Municipal Facilities & Equipment Impact Fee (Town of Lexington) ($371.00).
Water Meter Fee (Town of Lexington), Water Tap Fee (Town of Lexington) — same side of road, Sewer Capital Contribution Fee (Town of Lexington) — in-town, per ERU, Sewer Tap Fee (Town of Lexington) — gravity line up to 5 ft deep, and Water Capital Contribution Fee (Town of Lexington) — in-town, per ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lexington Impact Fee Schedule
- Water Capital Contribution Fee (Town of Lexington) — in-town, per ERU$1,250.00Requires confirmationTown of LexingtonThe Town of Lexington's posted water and sewer rate schedule (effective July 2026) lists monthly rates only; tap, meter and capital contribution charges for new connections are not published.
- Water Tap Fee (Town of Lexington) — same side of road$570.00Requires confirmationTap on same side of roadTown of LexingtonThe Town of Lexington's posted water and sewer rate schedule (effective July 2026) lists monthly rates only; tap, meter and capital contribution charges for new connections are not published.
- Water Meter Fee (Town of Lexington)$445.00Requires confirmation3/4" meterTown of LexingtonThe Town of Lexington's posted water and sewer rate schedule (effective July 2026) lists monthly rates only; meter charges for new connections are not published.
- Sewer Capital Contribution Fee (Town of Lexington) — in-town, per ERU$2,700.00Requires confirmationTown of LexingtonThe Town of Lexington's posted water and sewer rate schedule (effective July 2026) lists monthly rates only; tap, meter and capital contribution charges for new connections are not published.
- Sewer Tap Fee (Town of Lexington) — gravity line up to 5 ft deep$600.00Requires confirmationTown of LexingtonThe Town of Lexington's posted water and sewer rate schedule (effective July 2026) lists monthly rates only; tap, meter and capital contribution charges for new connections are not published.
- Parks & Recreation Impact Fee (Town of Lexington)$1,349.00Town of LexingtonTown of Lexington parks and recreation impact fee per single-family home under Ordinance 2025-03, adopted March 3, 2025. One of three town impact fees on a new home (parks, municipal facilities, transportation), all paid before the building permit is issued.
- Transportation Impact Fee (Town of Lexington)$828.00Town of LexingtonTown of Lexington transportation impact fee per single-family home under Ordinance 2025-03, adopted March 3, 2025; paid before the building permit is issued.
- Municipal Facilities & Equipment Impact Fee (Town of Lexington)$371.00Town of LexingtonTown of Lexington municipal facilities and equipment impact fee per single-family home under Ordinance 2025-03, adopted March 3, 2025. Covers police, fire and other town facilities and equipment; paid before the building permit is issued.
- County Development Impact Fee (Lexington County - none levied)$0.00Lexington CountyLexington County levies no development impact fee. Its fee schedules effective July 1, 2026 list only plan review, permit and inspection charges.
Where in Lexington County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lexington: Multifamily Impact Fees
A new multifamily unit in Lexington pays at least $1,556.00 per unit in impact fees (rates sourced November 13, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Parks & Recreation Impact Fee (Town of Lexington, MF) — Multifamily 3-10 Stories ($846.00), Transportation Impact Fee (Town of Lexington, MF) — Multifamily 3-10 Stories ($477.00) and Municipal Facilities & Equipment Impact Fee (Town of Lexington, MF) — Multifamily 3-10 Stories ($233.00).
Water Capital Contribution Fee (Town of Lexington, MF) and Sewer Capital Contribution Fee (Town of Lexington, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lexington Impact Fee Schedule
- Water Capital Contribution Fee (Town of Lexington, MF)Requires confirmationTown of LexingtonApartments in the Town of Lexington are served through a master meter, and the Town sets the number of equivalent residential units for each project from its projected flow, so no per-apartment capital contribution amount is published.
- Sewer Capital Contribution Fee (Town of Lexington, MF)Requires confirmationTown of LexingtonApartments in the Town of Lexington are served through a master meter, and the Town sets the number of equivalent residential units for each project from its projected flow, so no per-apartment capital contribution amount is published.
- Parks & Recreation Impact Fee (Town of Lexington, MF) — Multifamily 3-10 Stories$846.00Multifamily Housing (3-10 Stories)Town of LexingtonTown of Lexington parks and recreation impact fee per apartment in a 3 to 10 story building (Ordinance 2025-03, adopted March 3, 2025); the same rate applies to 1 to 2 story buildings. Paid before the building permit is issued.
- Transportation Impact Fee (Town of Lexington, MF) — Multifamily 3-10 Stories$477.00Multifamily Housing (3-10 Stories)Town of LexingtonTown of Lexington transportation impact fee per apartment in a 3 to 10 story building (Ordinance 2025-03, adopted March 3, 2025); 1 to 2 story buildings pay a higher rate. Paid before the building permit is issued.
- Municipal Facilities & Equipment Impact Fee (Town of Lexington, MF) — Multifamily 3-10 Stories$233.00Multifamily Housing (3-10 Stories)Town of LexingtonTown of Lexington municipal facilities and equipment impact fee per apartment in a 3 to 10 story building (Ordinance 2025-03, adopted March 3, 2025); the same rate applies to 1 to 2 story buildings. Paid before the building permit is issued.
- County Development Impact Fee (Lexington County - none levied) (MF)$0.00Lexington CountyLexington County levies no development impact fee. Its fee schedules effective July 1, 2026 list only plan review, permit and inspection charges.
Where in Lexington County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lexington: Commercial Impact Fees
Commercial development in Lexington pays $3.47 per square foot in impact fees, plus $5,565.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 50,000 sq ft building, that comes to at least $179,265.00. The calculator below adjusts to your exact square footage.
The largest line items are Municipal Facilities & Equipment Impact Fee (Town of Lexington, Commercial) ($0.34/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Transportation Impact Fee (Town of Lexington, Commercial), Water Capital Contribution Fee (Town of Lexington) — in-town, per ERU, Sewer Tap Fee (Town of Lexington) — gravity line up to 5 ft, Sewer Capital Contribution Fee (Town of Lexington) — in-town, per ERU, and Water Tap Fee (Town of Lexington) — same side of road are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Meter Fee (Town of Lexington) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Lexington Impact Fee Schedule
- Water Capital Contribution Fee (Town of Lexington) — in-town, per ERU$1,250.00 one-timeRequires confirmationTown of LexingtonOne-time water capital contribution fee per ERU for properties inside town limits. Nonresidential ERU count is based on estimated flow, so the total scales with the building's demand. Properties outside town limits pay the out-of-town rate ($2,225 per ERU).
- Water Tap Fee (Town of Lexington) — same side of road$1,015.00 one-timeRequires confirmationTap on same side of roadTown of LexingtonOne-time water tap (connection) fee for a 3/4 inch tap on the same side of the road as the main; a tap on the opposite side is $1,630. Larger commercial meter sizes are priced by the utility.
- Water Meter Fee (Town of Lexington)Requires confirmationTown of LexingtonA one-time water meter charge applies; the amount varies by meter size and type and is quoted by the utility for commercial meters.
- Sewer Capital Contribution Fee (Town of Lexington) — in-town, per ERU$2,700.00 one-timeRequires confirmationTown of LexingtonOne-time sewer capital contribution fee per ERU for properties inside town limits. Nonresidential ERU count is based on estimated flow. Properties outside town limits pay the out-of-town rate ($5,265 per ERU).
- Sewer Tap Fee (Town of Lexington) — gravity line up to 5 ft$600.00 one-timeRequires confirmationTown of LexingtonOne-time sewer tap (connection) fee for a gravity line up to 5 ft deep; a deeper line is $1,085.
- Transportation Impact Fee (Town of Lexington, Commercial)$3.13/sq ftRequires confirmationTown of LexingtonEffective June 1, 2026 (Phase 2 impact fee update, adopted at 100% of the maximum supportable amount). Charged per 1,000 sq ft of floor area by land-use category; rate shown is for Shopping Center (general retail). Permits under the 2025 schedule paid $2,185 per 1,000 sq ft. The transportation component is eligible for case-specific developer credits.
- Municipal Facilities & Equipment Impact Fee (Town of Lexington, Commercial)$0.34/sq ftTown of LexingtonCharged per 1,000 sq ft of floor area by land-use category; rate shown is for Shopping Center (general retail), unchanged by the June 1, 2026 Phase 2 update. The Town's Parks & Recreation impact-fee component applies to residential development only.
- County Development Impact Fee (Lexington County, Commercial)$0.00Lexington CountyLexington County does not levy a development impact fee.
Where in Lexington County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lexington: Industrial Impact Fees
Industrial development in Lexington pays $0.80 per square foot in impact fees, plus $5,565.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 50,000 sq ft building, that comes to at least $45,465.00. The calculator below adjusts to your exact square footage.
The largest line items are Municipal Facilities & Equipment Impact Fee (Town of Lexington, Industrial) ($0.24/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Transportation Impact Fee (Town of Lexington, Industrial), Water Capital Contribution Fee (Town of Lexington) — in-town, per ERU, Sewer Tap Fee (Town of Lexington) — gravity line up to 5 ft, Sewer Capital Contribution Fee (Town of Lexington) — in-town, per ERU, and Water Tap Fee (Town of Lexington) — same side of road are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Meter Fee (Town of Lexington) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Lexington Impact Fee Schedule
- Water Capital Contribution Fee (Town of Lexington) — in-town, per ERU$1,250.00 one-timeRequires confirmationTown of LexingtonOne-time water capital contribution fee per ERU for properties inside town limits. Nonresidential ERU count is based on estimated flow, so the total scales with the building's demand. Properties outside town limits pay the out-of-town rate ($2,225 per ERU).
- Water Tap Fee (Town of Lexington) — same side of road$1,015.00 one-timeRequires confirmationTap on same side of roadTown of LexingtonOne-time water tap (connection) fee for a 3/4 inch tap on the same side of the road as the main; a tap on the opposite side is $1,630. Larger commercial meter sizes are priced by the utility.
- Water Meter Fee (Town of Lexington)Requires confirmationTown of LexingtonA one-time water meter charge applies; the amount varies by meter size and type and is quoted by the utility for commercial meters.
- Sewer Capital Contribution Fee (Town of Lexington) — in-town, per ERU$2,700.00 one-timeRequires confirmationTown of LexingtonOne-time sewer capital contribution fee per ERU for properties inside town limits. Nonresidential ERU count is based on estimated flow. Properties outside town limits pay the out-of-town rate ($5,265 per ERU).
- Sewer Tap Fee (Town of Lexington) — gravity line up to 5 ft$600.00 one-timeRequires confirmationTown of LexingtonOne-time sewer tap (connection) fee for a gravity line up to 5 ft deep; a deeper line is $1,085.
- Transportation Impact Fee (Town of Lexington, Industrial)$0.56/sq ftRequires confirmationTown of LexingtonEffective June 1, 2026 (Phase 2 impact fee update, adopted at 100% of the maximum supportable amount). Charged per 1,000 sq ft of floor area; rate shown is for General Light Industrial. Permits under the 2025 schedule paid $391 per 1,000 sq ft. Transportation component eligible for case-specific developer credits.
- Municipal Facilities & Equipment Impact Fee (Town of Lexington, Industrial)$0.24/sq ftTown of LexingtonCharged per 1,000 sq ft of floor area; rate shown is for General Light Industrial, unchanged by the June 1, 2026 Phase 2 update. The Town's Parks & Recreation impact-fee component applies to residential development only.
- County Development Impact Fee (Lexington County, Industrial)$0.00Lexington CountyLexington County does not levy a development impact fee.
Where in Lexington County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lexington: Office Impact Fees
Office development in Lexington pays $1.53 per square foot in impact fees, plus $5,565.00 in one-time water and sewer connection fees (rates sourced November 13, 2026).
For a 25,000 sq ft building, that comes to at least $43,915.00. The calculator below adjusts to your exact square footage.
The largest line items are Municipal Facilities & Equipment Impact Fee (Town of Lexington, Office) ($0.43/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Transportation Impact Fee (Town of Lexington, Office), Water Capital Contribution Fee (Town of Lexington) — in-town, per ERU, Sewer Tap Fee (Town of Lexington) — gravity line up to 5 ft, Sewer Capital Contribution Fee (Town of Lexington) — in-town, per ERU, and Water Tap Fee (Town of Lexington) — same side of road are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Meter Fee (Town of Lexington) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Lexington Impact Fee Schedule
- Water Capital Contribution Fee (Town of Lexington) — in-town, per ERU$1,250.00 one-timeRequires confirmationTown of LexingtonOne-time water capital contribution fee per ERU for properties inside town limits. Nonresidential ERU count is based on estimated flow, so the total scales with the building's demand. Properties outside town limits pay the out-of-town rate ($2,225 per ERU).
- Water Tap Fee (Town of Lexington) — same side of road$1,015.00 one-timeRequires confirmationTap on same side of roadTown of LexingtonOne-time water tap (connection) fee for a 3/4 inch tap on the same side of the road as the main; a tap on the opposite side is $1,630. Larger commercial meter sizes are priced by the utility.
- Water Meter Fee (Town of Lexington)Requires confirmationTown of LexingtonA one-time water meter charge applies; the amount varies by meter size and type and is quoted by the utility for commercial meters.
- Sewer Capital Contribution Fee (Town of Lexington) — in-town, per ERU$2,700.00 one-timeRequires confirmationTown of LexingtonOne-time sewer capital contribution fee per ERU for properties inside town limits. Nonresidential ERU count is based on estimated flow. Properties outside town limits pay the out-of-town rate ($5,265 per ERU).
- Sewer Tap Fee (Town of Lexington) — gravity line up to 5 ft$600.00 one-timeRequires confirmationTown of LexingtonOne-time sewer tap (connection) fee for a gravity line up to 5 ft deep; a deeper line is $1,085.
- Transportation Impact Fee (Town of Lexington, Office)$1.10/sq ftRequires confirmationTown of LexingtonEffective June 1, 2026 (Phase 2 impact fee update, adopted at 100% of the maximum supportable amount). Charged per 1,000 sq ft of floor area; rate shown is for General Office Building. Permits under the 2025 schedule paid $769 per 1,000 sq ft. Transportation component eligible for case-specific developer credits.
- Municipal Facilities & Equipment Impact Fee (Town of Lexington, Office)$0.43/sq ftTown of LexingtonCharged per 1,000 sq ft of floor area; rate shown is for General Office Building, unchanged by the June 1, 2026 Phase 2 update. The Town's Parks & Recreation impact-fee component applies to residential development only.
- County Development Impact Fee (Lexington County, Office)$0.00Lexington CountyLexington County does not levy a development impact fee.
Where in Lexington County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lexington Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Lexington Impact Fee FAQs
What are the total impact fees for a single-family home in Lexington, South Carolina?
A new single-family home in Lexington pays $8,113.00 per unit in combined impact fees (rates sourced November 13, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Lexington?
Commercial development in Lexington pays $3.47 per square foot in impact fees, plus $5,565.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $179,265.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Lexington charge its own impact fees?
Yes. Lexington levies its own municipal impact or utility fees. Lexington County does not currently add county-level impact fees inside Lexington. The schedule on this page shows every fee that applies to development in Lexington.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.