Batesburg-Leesville Impact Fees by Project Type
Batesburg-Leesville: Single-Family Impact Fees
A new single-family home in Batesburg-Leesville pays $3,718.00 per unit in impact fees (rates sourced August 15, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee (Town of Batesburg-Leesville) — 3/4", in town ($1,500.00), Sewer Tap Fee (Town of Batesburg-Leesville) — in town ($925.00) and Sewer Impact Fee (Town of Batesburg-Leesville) - Residential ($722.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Batesburg-Leesville Impact Fee Schedule
- Water Tap Fee (Town of Batesburg-Leesville) — 3/4", in town$1,500.00Town of Batesburg-Leesville (Utilities Dept.)Town water tap fee for a 3/4 inch meter inside town limits. A 1 inch tap is $1,700; larger meters are priced at cost plus a fixed charge. Charged in addition to the town's water impact fee.
- Water Impact Fee (Town of Batesburg-Leesville) - Residential$571.00Town of Batesburg-Leesville (Utilities Dept.)Town water system capacity charge for a residential connection, separate from and in addition to the water tap fee.
- Sewer Tap Fee (Town of Batesburg-Leesville) — in town$925.00Town of Batesburg-Leesville (Utilities Dept.)Town sewer tap fee inside town limits. The town runs its own sewer system and treatment plant. Charged in addition to the town's sewer impact fee.
- Sewer Impact Fee (Town of Batesburg-Leesville) - Residential$722.00Town of Batesburg-Leesville (Utilities Dept.)Town sewer system capacity charge for a residential connection, separate from and in addition to the sewer tap fee.
- City Development Impact Fee (Town of Batesburg-Leesville - none levied)$0.00Town of Batesburg-LeesvilleThe town levies no development impact fee for parks, police, fire or roads. In July 2026 it sought proposals for an impact fee study and capital improvements plan, so a fee may be adopted in the future.
- County Development Impact Fee (Lexington County - none levied)$0.00Lexington CountyLexington County levies no development impact fee. Its fee schedules effective July 1, 2026 list only plan review, permit and inspection charges.
Where in Lexington County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Batesburg-Leesville: Multifamily Impact Fees
A new multifamily unit in Batesburg-Leesville pays $3,718.00 per unit in impact fees (rates sourced August 15, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee (Town of Batesburg-Leesville, MF) - per unit, in town ($1,500.00), Sewer Tap Fee (Town of Batesburg-Leesville, MF) - per unit, in town ($925.00) and Sewer Impact Fee (Town of Batesburg-Leesville, MF) - Residential, per unit ($722.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Batesburg-Leesville Impact Fee Schedule
- Water Tap Fee (Town of Batesburg-Leesville, MF) - per unit, in town$1,500.003/4", in town, per dwelling unitTown of Batesburg-Leesville (Utilities Dept.)Town water tap fee for a 3/4 inch meter inside town limits, shown per dwelling unit on the basis that each unit has its own meter. Charged in addition to the town's water impact fee.
- Water Impact Fee (Town of Batesburg-Leesville, MF) - Residential, per unit$571.00Town of Batesburg-Leesville (Utilities Dept.)Town water system capacity charge, shown per dwelling unit. Separate from and in addition to the water tap fee.
- Sewer Tap Fee (Town of Batesburg-Leesville, MF) - per unit, in town$925.00In town, per dwelling unitTown of Batesburg-Leesville (Utilities Dept.)Town sewer tap fee inside town limits, shown per dwelling unit. The town runs its own sewer system and treatment plant. Charged in addition to the town's sewer impact fee.
- Sewer Impact Fee (Town of Batesburg-Leesville, MF) - Residential, per unit$722.00Town of Batesburg-Leesville (Utilities Dept.)Town sewer system capacity charge, shown per dwelling unit. Separate from and in addition to the sewer tap fee.
- City Development Impact Fee (Town of Batesburg-Leesville - none levied) (MF)$0.00Town of Batesburg-LeesvilleThe town levies no development impact fee for parks, police, fire or roads. In July 2026 it sought proposals for an impact fee study and capital improvements plan, so a fee may be adopted in the future.
- County Development Impact Fee (Lexington County - none levied) (MF)$0.00Lexington CountyLexington County levies no development impact fee. Its fee schedules effective July 1, 2026 list only plan review, permit and inspection charges.
Where in Lexington County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Batesburg-Leesville: Commercial Impact Fees
Commercial development in Batesburg-Leesville pays no per-square-foot impact fees, but owes $6,946.00 in one-time water and sewer connection fees (rates sourced August 15, 2026).
For a 50,000 sq ft building, that comes to about $6,946.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (Town of Batesburg-Leesville) — 1" meter ($2,412.00 one-time), Water Impact Fee (Town of Batesburg-Leesville) — 1" meter ($1,909.00 one-time) and Water Tap Fee (Town of Batesburg-Leesville) — 1" meter, in town ($1,700.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Batesburg-Leesville Impact Fee Schedule
- Water Impact Fee (Town of Batesburg-Leesville) — 1" meter$1,909.00 one-timeTown of Batesburg-LeesvilleWater impact (capacity) fee set by water meter size.
- Water Tap Fee (Town of Batesburg-Leesville) — 1" meter, in town$1,700.00 one-time1", in townTown of Batesburg-LeesvilleIn-town water tap fee by meter size. Meters 1.5" and larger are charged at actual cost plus a fixed add-on; out-of-town connections are higher.
- Sewer Impact Fee (Town of Batesburg-Leesville) — 1" meter$2,412.00 one-timeTown of Batesburg-LeesvilleSewer impact (capacity) fee set by water meter size.
- Sewer Tap Fee (Town of Batesburg-Leesville) — in town$925.00 one-timeTown of Batesburg-LeesvilleSewer tap fee for connections inside the town; out-of-town connections are higher.
- City Development Impact Fee (Town of Batesburg-Leesville, Commercial)$0.00Town of Batesburg-LeesvilleThe Town of Batesburg-Leesville does not currently levy a development impact fee (a study to establish one was under procurement in 2026).
- County Development Impact Fee (Lexington County, Commercial)$0.00Lexington CountyLexington County does not levy a development impact fee.
Where in Lexington County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Batesburg-Leesville: Industrial Impact Fees
Industrial development in Batesburg-Leesville pays no per-square-foot impact fees, but owes $6,946.00 in one-time water and sewer connection fees (rates sourced August 15, 2026).
For a 50,000 sq ft building, that comes to about $6,946.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (Town of Batesburg-Leesville) — 1" meter ($2,412.00 one-time), Water Impact Fee (Town of Batesburg-Leesville) — 1" meter ($1,909.00 one-time) and Water Tap Fee (Town of Batesburg-Leesville) — 1" meter, in town ($1,700.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Batesburg-Leesville Impact Fee Schedule
- Water Impact Fee (Town of Batesburg-Leesville) — 1" meter$1,909.00 one-timeTown of Batesburg-LeesvilleWater impact (capacity) fee set by water meter size.
- Water Tap Fee (Town of Batesburg-Leesville) — 1" meter, in town$1,700.00 one-time1", in townTown of Batesburg-LeesvilleIn-town water tap fee by meter size. Meters 1.5" and larger are charged at actual cost plus a fixed add-on; out-of-town connections are higher.
- Sewer Impact Fee (Town of Batesburg-Leesville) — 1" meter$2,412.00 one-timeTown of Batesburg-LeesvilleSewer impact (capacity) fee set by water meter size.
- Sewer Tap Fee (Town of Batesburg-Leesville) — in town$925.00 one-timeTown of Batesburg-LeesvilleSewer tap fee for connections inside the town; out-of-town connections are higher.
- City Development Impact Fee (Town of Batesburg-Leesville, Industrial)$0.00Town of Batesburg-LeesvilleThe Town of Batesburg-Leesville does not currently levy a development impact fee (a study to establish one was under procurement in 2026).
- County Development Impact Fee (Lexington County, Industrial)$0.00Lexington CountyLexington County does not levy a development impact fee.
Where in Lexington County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Batesburg-Leesville: Office Impact Fees
Office development in Batesburg-Leesville pays no per-square-foot impact fees, but owes $6,946.00 in one-time water and sewer connection fees (rates sourced August 15, 2026).
For a 25,000 sq ft building, that comes to about $6,946.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (Town of Batesburg-Leesville) — 1" meter ($2,412.00 one-time), Water Impact Fee (Town of Batesburg-Leesville) — 1" meter ($1,909.00 one-time) and Water Tap Fee (Town of Batesburg-Leesville) — 1" meter, in town ($1,700.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Batesburg-Leesville Impact Fee Schedule
- Water Impact Fee (Town of Batesburg-Leesville) — 1" meter$1,909.00 one-timeTown of Batesburg-LeesvilleWater impact (capacity) fee set by water meter size.
- Water Tap Fee (Town of Batesburg-Leesville) — 1" meter, in town$1,700.00 one-time1", in townTown of Batesburg-LeesvilleIn-town water tap fee by meter size. Meters 1.5" and larger are charged at actual cost plus a fixed add-on; out-of-town connections are higher.
- Sewer Impact Fee (Town of Batesburg-Leesville) — 1" meter$2,412.00 one-timeTown of Batesburg-LeesvilleSewer impact (capacity) fee set by water meter size.
- Sewer Tap Fee (Town of Batesburg-Leesville) — in town$925.00 one-timeTown of Batesburg-LeesvilleSewer tap fee for connections inside the town; out-of-town connections are higher.
- City Development Impact Fee (Town of Batesburg-Leesville, Office)$0.00Town of Batesburg-LeesvilleThe Town of Batesburg-Leesville does not currently levy a development impact fee (a study to establish one was under procurement in 2026).
- County Development Impact Fee (Lexington County, Office)$0.00Lexington CountyLexington County does not levy a development impact fee.
Where in Lexington County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Batesburg-Leesville Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Batesburg-Leesville Impact Fee FAQs
What are the total impact fees for a single-family home in Batesburg-Leesville, South Carolina?
A new single-family home in Batesburg-Leesville pays $3,718.00 per unit in combined impact fees (rates sourced August 15, 2026).
How much are commercial impact fees in Batesburg-Leesville?
Commercial development in Batesburg-Leesville pays no per-square-foot impact fees, but owes $6,946.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Batesburg-Leesville charge its own impact fees?
Yes. Batesburg-Leesville levies its own municipal impact or utility fees. Lexington County does not currently add county-level impact fees inside Batesburg-Leesville. The schedule on this page shows every fee that applies to development in Batesburg-Leesville.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Lexington County impact fees page.