Cameron County Impact Fees by Project Type
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Cameron County: Single-Family Impact Fees
A new single-family home in unincorporated Cameron County pays $3,250.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact and Installation Fee — East Rio Hondo WSC, new tap ($2,000 impact + $1,250 installation) ($3,250.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Cameron County Impact Fee Schedule
- Water Impact and Installation Fee — East Rio Hondo WSC, new tap ($2,000 impact + $1,250 installation)$3,250.00East Rio Hondo Water Supply CorporationEast Rio Hondo Water Supply Corporation serves most of unincorporated northern and eastern Cameron County and is the default here. A new single-family service pays a one-time impact fee of $2,000 per service unit plus a $1,250 standard installation fee where no tap exists. A refundable $315 membership fee and a water-rights charge set at market price (0.625 acre-feet per service unit) also apply.
- Sewer Connection Fee — On-site septic (no public sewer)$0.00Cameron CountyMost homes in unincorporated Cameron County use on-site septic systems, which carry no sewer connection fee. Where a water supply corporation provides sewer (East Rio Hondo WSC in Lozano and its Southside system, Military Highway WSC in its colonia systems), its connection fees apply instead.
- City/Municipal Fees (Cameron County - Unincorporated)$0.00Cameron County (unincorporated)Unincorporated areas have no municipal (city) impact or parkland fees.
- County Impact Fees (Cameron County)$0.00Cameron CountyTexas counties cannot impose Chapter 395 impact fees; Cameron County levies none.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Cameron County: Multifamily Impact Fees
A new multifamily unit in unincorporated Cameron County pays $3,250.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact and Installation Fee (MF) — East Rio Hondo WSC, new tap ($2,000 impact + $1,250 installation) ($3,250.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Cameron County Impact Fee Schedule
- Water Impact and Installation Fee (MF) — East Rio Hondo WSC, new tap ($2,000 impact + $1,250 installation)$3,250.00East Rio Hondo Water Supply CorporationEast Rio Hondo Water Supply Corporation serves most of unincorporated northern and eastern Cameron County. Each individually metered unit pays a one-time impact fee of $2,000 per service unit plus a $1,250 standard installation fee where no tap exists. A refundable $315 membership fee and a market-priced water-rights charge also apply.
- Sewer Connection Fee (MF) — On-site septic (no public sewer)$0.00Cameron CountyMost homes in unincorporated Cameron County use on-site septic systems, which carry no sewer connection fee. Where a water supply corporation provides sewer, its connection fees apply instead, per unit.
- City/Municipal Fees (Cameron County - Unincorporated) (MF)$0.00Cameron County (unincorporated)Unincorporated areas have no municipal (city) impact or parkland fees.
- County Impact Fees (Cameron County, MF)$0.00Cameron CountyTexas counties cannot impose Chapter 395 impact fees; Cameron County levies none.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Cameron County: Commercial Impact Fees
Commercial development in unincorporated Cameron County pays no per-square-foot impact fees, but owes $8,125.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 50,000 sq ft building, that comes to about $8,125.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee — East Rio Hondo WSC, 1" (2.5 SU × ($2,000 + $1,250)) ($8,125.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Cameron County Impact Fee Schedule
- Water Connection Fee — East Rio Hondo WSC, 1" (2.5 SU × ($2,000 + $1,250))$8,125.00 one-timeEast Rio Hondo Water Supply CorporationEast Rio Hondo WSC, the largest water provider in unincorporated Cameron County, charges a water impact fee of $2,000 and a new-tap installation fee of $1,250 per service unit; a 1" meter is 2.5 service units. A refundable membership fee and a water rights charge at market price (0.625 acre-feet per service unit) are also due; line extensions are priced at cost. Other water supply corporations serve parts of the county.
- Sewer Connection Fee — On-site septic (no public sewer)$0.00Cameron CountyMost of unincorporated Cameron County has no public sewer; development uses on-site septic systems permitted by the county. Where a water supply corporation provides sewer, its connection charges apply instead.
- City Impact Fee (Cameron County - Unincorporated, Commercial)$0.00Cameron CountyThis is unincorporated county land with no municipal government, so no city impact fees apply.
- County Impact Fee (Cameron County, Commercial)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Cameron County: Industrial Impact Fees
Industrial development in unincorporated Cameron County pays no per-square-foot impact fees, but owes $8,125.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 50,000 sq ft building, that comes to about $8,125.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee — East Rio Hondo WSC, 1" (2.5 SU × ($2,000 + $1,250)) ($8,125.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Cameron County Impact Fee Schedule
- Water Connection Fee — East Rio Hondo WSC, 1" (2.5 SU × ($2,000 + $1,250))$8,125.00 one-timeEast Rio Hondo Water Supply CorporationEast Rio Hondo WSC, the largest water provider in unincorporated Cameron County, charges a water impact fee of $2,000 and a new-tap installation fee of $1,250 per service unit; a 1" meter is 2.5 service units. A refundable membership fee and a water rights charge at market price (0.625 acre-feet per service unit) are also due; line extensions are priced at cost. Other water supply corporations serve parts of the county.
- Sewer Connection Fee — On-site septic (no public sewer)$0.00Cameron CountyMost of unincorporated Cameron County has no public sewer; development uses on-site septic systems permitted by the county. Where a water supply corporation provides sewer, its connection charges apply instead.
- City Impact Fee (Cameron County - Unincorporated, Industrial)$0.00Cameron CountyThis is unincorporated county land with no municipal government, so no city impact fees apply.
- County Impact Fee (Cameron County, Industrial)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Cameron County: Office Impact Fees
Office development in unincorporated Cameron County pays no per-square-foot impact fees, but owes $8,125.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 25,000 sq ft building, that comes to about $8,125.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee — East Rio Hondo WSC, 1" (2.5 SU × ($2,000 + $1,250)) ($8,125.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Cameron County Impact Fee Schedule
- Water Connection Fee — East Rio Hondo WSC, 1" (2.5 SU × ($2,000 + $1,250))$8,125.00 one-timeEast Rio Hondo Water Supply CorporationEast Rio Hondo WSC, the largest water provider in unincorporated Cameron County, charges a water impact fee of $2,000 and a new-tap installation fee of $1,250 per service unit; a 1" meter is 2.5 service units. A refundable membership fee and a water rights charge at market price (0.625 acre-feet per service unit) are also due; line extensions are priced at cost. Other water supply corporations serve parts of the county.
- Sewer Connection Fee — On-site septic (no public sewer)$0.00Cameron CountyMost of unincorporated Cameron County has no public sewer; development uses on-site septic systems permitted by the county. Where a water supply corporation provides sewer, its connection charges apply instead.
- City Impact Fee (Cameron County - Unincorporated, Office)$0.00Cameron CountyThis is unincorporated county land with no municipal government, so no city impact fees apply.
- County Impact Fee (Cameron County, Office)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Cameron County Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Cameron County Impact Fee FAQs
What are single-family impact fees in Cameron County, Texas?
A new single-family home in unincorporated Cameron County pays $3,250.00 per unit in impact fees (rates sourced November 18, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.
How much are multifamily impact fees in Cameron County?
Multifamily development in unincorporated Cameron County pays $3,250.00 per unit in impact fees (rates sourced November 18, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.
How much are commercial impact fees in Cameron County?
Commercial development in unincorporated Cameron County pays no per-square-foot impact fees, but owes $8,125.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Do cities in Cameron County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 15 of 17 cities in Cameron County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.