Indian Lake Impact Fees by Project Type
Indian Lake: Single-Family Impact Fees
A new single-family home in Indian Lake pays $3,350.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee (Town of Indian Lake) ($2,650.00), Sewer Connection Fee (Town of Indian Lake) ($350.00) and Water Utility Expansion Fee (Town of Indian Lake) ($350.00).
View the Full Indian Lake Impact Fee Schedule
- Water Tap Fee (Town of Indian Lake)$2,650.00Town of Indian LakeOne-time water tap fee charged by the Town of Indian Lake: $2,650 for 3/4-inch through 2-inch taps (Ordinance No. 100, 2018); larger taps at cost plus 25%. A $350 water utility expansion fee is also due per dwelling.
- Water Utility Expansion Fee (Town of Indian Lake)$350.00Town of Indian LakeOne-time $350 water utility expansion fee per home, in addition to the water tap fee (Town of Indian Lake Ordinance No. 100, 2018).
- Sewer Connection Fee (Town of Indian Lake)$350.00Town of Indian LakeOne-time $350 sewer connection charge per dwelling under Town of Indian Lake Ordinance No. 100 (2018). Properties within 100 feet of the town sewer must connect.
- City Impact/Parkland Fees (Town of Indian Lake)$0.00Town of Indian LakeThe Town of Indian Lake charges no city impact or parkland fee; its subdivision rules require a 10% park land dedication for subdivisions of 40 acres or more, with no fee in lieu.
- County Impact Fees (Cameron County)$0.00Cameron CountyTexas counties cannot impose Chapter 395 impact fees; Cameron County levies none.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Indian Lake: Multifamily Impact Fees
A new multifamily unit in Indian Lake pays $3,350.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee (Town of Indian Lake, MF) ($2,650.00), Water Utility Expansion Fee (Town of Indian Lake, MF) ($350.00) and Sewer Connection Fee (Town of Indian Lake, MF) ($350.00).
View the Full Indian Lake Impact Fee Schedule
- Water Tap Fee (Town of Indian Lake, MF)$2,650.00Town of Indian LakeTown of Indian Lake water tap fee: $2,650 per tap for 3/4-inch through 2-inch taps (Ordinance No. 100); a building on one tap pays it once.
- Water Utility Expansion Fee (Town of Indian Lake, MF)$350.00Town of Indian LakeOne-time $350 water utility expansion fee per apartment or multifamily unit (Town of Indian Lake Ordinance No. 100, 2018).
- Sewer Connection Fee (Town of Indian Lake, MF)$350.00Town of Indian LakeOne-time $350 sewer connection charge per dwelling unit (Town of Indian Lake Ordinance No. 100, 2018).
- City Impact/Parkland Fees (Town of Indian Lake, MF)$0.00Town of Indian LakeThe Town of Indian Lake charges no city impact or parkland fee; its subdivision rules require a 10% park land dedication for subdivisions of 40 acres or more, with no fee in lieu.
- County Impact Fees (Cameron County, MF)$0.00Cameron CountyTexas counties cannot impose Chapter 395 impact fees; Cameron County levies none.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Indian Lake: Commercial Impact Fees
Commercial development in Indian Lake pays no per-square-foot impact fees, but owes $3,350.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 50,000 sq ft building, that comes to at least $3,350.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Town of Indian Lake) ($2,650.00 one-time), Water Utility Expansion Fee (Town of Indian Lake) ($350.00 one-time) and Sewer Connection Fee (Town of Indian Lake) ($350.00 one-time).
City Impact Fee (Town of Indian Lake, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Indian Lake Impact Fee Schedule
- Water Tap Fee (Town of Indian Lake)$2,650.00 one-timeTown of Indian LakeThe Town of Indian Lake charges a $2,650 water tap for meters up to 2 inches, installed by town crews; larger connections are billed at the cost of meter, connection and tap plus 25%. A separate $350 water utility expansion fee applies to each commercial or industrial connection. Service outside town limits is charged at higher rates.
- Water Utility Expansion Fee (Town of Indian Lake)$350.00 one-timeTown of Indian LakeThe Town of Indian Lake charges a $350 water utility expansion fee for each commercial or industrial connection, in addition to the water tap. The fee funds additional water rights and water plant or system improvements.
- Sewer Connection Fee (Town of Indian Lake)$350.00 one-timeTown of Indian LakeThe Town of Indian Lake charges a $350 sewer connection fee for each commercial or industrial connection to its sewer system; wastewater is treated by the City of Los Fresnos.
- City Impact Fee (Town of Indian Lake, Commercial)Requires confirmationTown of Indian LakeNo city impact fee has been identified for the Town of Indian Lake.
- County Impact Fee (Cameron County, Commercial)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Indian Lake: Industrial Impact Fees
Industrial development in Indian Lake pays no per-square-foot impact fees, but owes $3,350.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 50,000 sq ft building, that comes to at least $3,350.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Town of Indian Lake) ($2,650.00 one-time), Water Utility Expansion Fee (Town of Indian Lake) ($350.00 one-time) and Sewer Connection Fee (Town of Indian Lake) ($350.00 one-time).
City Impact Fee (Town of Indian Lake, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Indian Lake Impact Fee Schedule
- Water Tap Fee (Town of Indian Lake)$2,650.00 one-timeTown of Indian LakeThe Town of Indian Lake charges a $2,650 water tap for meters up to 2 inches, installed by town crews; larger connections are billed at the cost of meter, connection and tap plus 25%. A separate $350 water utility expansion fee applies to each commercial or industrial connection. Service outside town limits is charged at higher rates.
- Water Utility Expansion Fee (Town of Indian Lake)$350.00 one-timeTown of Indian LakeThe Town of Indian Lake charges a $350 water utility expansion fee for each commercial or industrial connection, in addition to the water tap. The fee funds additional water rights and water plant or system improvements.
- Sewer Connection Fee (Town of Indian Lake)$350.00 one-timeTown of Indian LakeThe Town of Indian Lake charges a $350 sewer connection fee for each commercial or industrial connection to its sewer system; wastewater is treated by the City of Los Fresnos.
- City Impact Fee (Town of Indian Lake, Industrial)Requires confirmationTown of Indian LakeNo city impact fee has been identified for the Town of Indian Lake.
- County Impact Fee (Cameron County, Industrial)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Indian Lake: Office Impact Fees
Office development in Indian Lake pays no per-square-foot impact fees, but owes $3,350.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 25,000 sq ft building, that comes to at least $3,350.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Town of Indian Lake) ($2,650.00 one-time), Water Utility Expansion Fee (Town of Indian Lake) ($350.00 one-time) and Sewer Connection Fee (Town of Indian Lake) ($350.00 one-time).
City Impact Fee (Town of Indian Lake, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Indian Lake Impact Fee Schedule
- Water Tap Fee (Town of Indian Lake)$2,650.00 one-timeTown of Indian LakeThe Town of Indian Lake charges a $2,650 water tap for meters up to 2 inches, installed by town crews; larger connections are billed at the cost of meter, connection and tap plus 25%. A separate $350 water utility expansion fee applies to each commercial or industrial connection. Service outside town limits is charged at higher rates.
- Water Utility Expansion Fee (Town of Indian Lake)$350.00 one-timeTown of Indian LakeThe Town of Indian Lake charges a $350 water utility expansion fee for each commercial or industrial connection, in addition to the water tap. The fee funds additional water rights and water plant or system improvements.
- Sewer Connection Fee (Town of Indian Lake)$350.00 one-timeTown of Indian LakeThe Town of Indian Lake charges a $350 sewer connection fee for each commercial or industrial connection to its sewer system; wastewater is treated by the City of Los Fresnos.
- City Impact Fee (Town of Indian Lake, Office)Requires confirmationTown of Indian LakeNo city impact fee has been identified for the Town of Indian Lake.
- County Impact Fee (Cameron County, Office)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Indian Lake Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Indian Lake Impact Fee FAQs
What are the total impact fees for a single-family home in Indian Lake, Texas?
A new single-family home in Indian Lake pays $3,350.00 per unit in combined impact fees (rates sourced November 18, 2026).
How much are commercial impact fees in Indian Lake?
Commercial development in Indian Lake pays no per-square-foot impact fees, but owes $3,350.00 in one-time water and sewer connection fees. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Indian Lake charge its own impact fees?
Yes. Indian Lake levies its own municipal impact or utility fees. Cameron County does not currently add county-level impact fees inside Indian Lake. The schedule on this page shows every fee that applies to development in Indian Lake.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Cameron County impact fees page.