La Feria Impact Fees by Project Type
La Feria: Single-Family Impact Fees
A new single-family home in La Feria pays at least $900.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Connection Fee (City of La Feria) — 4" connection ($450.00) and Water Connection Fee (City of La Feria) — 5/8" or 1" meter ($450.00).
City Impact/Parkland Fees (City of La Feria) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full La Feria Impact Fee Schedule
- Water Connection Fee (City of La Feria) — 5/8" or 1" meter$450.00City of La FeriaCity of La Feria water connection fee for a 5/8-inch or 1-inch meter: $450 inside city limits ($750 outside), Ordinance 2023-06 (July 2023). Single-family lots outside city limits or not on a recorded city plat also pay a $300 utility expansion fee.
- Sewer Connection Fee (City of La Feria) — 4" connection$450.00City of La FeriaCity of La Feria sewer connection fee for a 4-inch connection: $450 inside city limits ($750 outside), Ordinance 2023-06 (July 2023).
- City Impact/Parkland Fees (City of La Feria)Requires confirmationCity of La FeriaLa Feria levies no roadway or drainage impact fee. New subdivisions dedicate parkland or pay a fee in lieu under a separate city parkland dedication ordinance; no amount is published.
- County Impact Fees (Cameron County)$0.00Cameron CountyTexas counties cannot impose Chapter 395 impact fees; Cameron County levies none.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
La Feria: Multifamily Impact Fees
A new multifamily unit in La Feria pays at least $1,200.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee (City of La Feria, MF) — 5/8" or 1" meter ($450.00) and Sewer Connection Fee (City of La Feria, MF) — 4" connection ($450.00).
Utility Expansion Fee (City of La Feria, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
City Impact/Parkland Fees (City of La Feria, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full La Feria Impact Fee Schedule
- Water Connection Fee (City of La Feria, MF) — 5/8" or 1" meter$450.00City of La FeriaCity of La Feria water connection fee: $450 per 5/8-inch or 1-inch connection inside city limits; 2-inch and larger connections pay 110% of the city's cost (Ordinance 2023-06). A building on one connection pays it once.
- Utility Expansion Fee (City of La Feria, MF)$300.00Requires confirmationCity of La FeriaCity of La Feria utility expansion fee: $300 per dwelling unit for multifamily service requests (Code Sec. 13.03.044); the utilities board makes the final determination of applicability.
- Sewer Connection Fee (City of La Feria, MF) — 4" connection$450.00City of La FeriaCity of La Feria sewer connection fee: $450 per 4-inch connection inside city limits; 6-inch and larger pay 110% of the city's cost (Ordinance 2023-06). A building on one connection pays it once.
- City Impact/Parkland Fees (City of La Feria, MF)Requires confirmationCity of La FeriaLa Feria levies no roadway or drainage impact fee. New subdivisions dedicate parkland or pay a fee in lieu under a separate city parkland dedication ordinance; no amount is published.
- County Impact Fees (Cameron County, MF)$0.00Cameron CountyTexas counties cannot impose Chapter 395 impact fees; Cameron County levies none.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
La Feria: Commercial Impact Fees
Commercial development in La Feria pays no per-square-foot impact fees, but owes $1,500.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 50,000 sq ft building, that comes to about $1,500.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of La Feria) — 1" ($450.00 one-time) and Sewer Connection Fee (City of La Feria) — 4" connection ($450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Utility Expansion Fee (City of La Feria) and Water Utility Expansion Fee (City of La Feria) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full La Feria Impact Fee Schedule
- Water Connection Fee (City of La Feria) — 1"$450.00 one-timeCity of La FeriaIn-city connection fee for a 1 in. water connection (the same $450 applies to 5/8 in.). Outside city limits the 5/8 in. and 1 in. fee is $750. Connections of 2 to 4 in. are charged 110% of the city's cost inside the city and 200% outside. A refundable meter deposit and a $20 activation fee are also due.
- Water Utility Expansion Fee (City of La Feria)$300.00 one-timeRequires confirmationCity of La FeriaOne-time utility expansion fee of $300 per connection, normally charged on every request for service other than a single-family home and on service outside city limits; the city utilities board makes the final determination. Whether a project taking both water and wastewater service pays it once or for each service is not stated in the code.
- Sewer Connection Fee (City of La Feria) — 4" connection$450.00 one-timeCity of La FeriaIn-city fee for a 4 in. sewer connection; $750 outside city limits. Larger connections (6, 8 and 10 in.) are charged 110% of the city's cost inside the city and 200% outside.
- Sewer Utility Expansion Fee (City of La Feria)$300.00 one-timeRequires confirmationCity of La FeriaOne-time utility expansion fee of $300 per connection, normally charged on every request for service other than a single-family home and on service outside city limits; the city utilities board makes the final determination. Whether a project taking both water and wastewater service pays it once or for each service is not stated in the code.
- City Impact Fee (City of La Feria, Commercial)$0.00City of La FeriaThe City of La Feria has not adopted a roadway or drainage impact fee. Water and sewer connection and utility expansion fees are listed separately.
- County Impact Fee (Cameron County, Commercial)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
La Feria: Industrial Impact Fees
Industrial development in La Feria pays no per-square-foot impact fees, but owes $1,500.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 50,000 sq ft building, that comes to about $1,500.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of La Feria) — 1" ($450.00 one-time) and Sewer Connection Fee (City of La Feria) — 4" connection ($450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Utility Expansion Fee (City of La Feria) and Water Utility Expansion Fee (City of La Feria) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full La Feria Impact Fee Schedule
- Water Connection Fee (City of La Feria) — 1"$450.00 one-timeCity of La FeriaIn-city connection fee for a 1 in. water connection (the same $450 applies to 5/8 in.). Outside city limits the 5/8 in. and 1 in. fee is $750. Connections of 2 to 4 in. are charged 110% of the city's cost inside the city and 200% outside. A refundable meter deposit and a $20 activation fee are also due.
- Water Utility Expansion Fee (City of La Feria)$300.00 one-timeRequires confirmationCity of La FeriaOne-time utility expansion fee of $300 per connection, normally charged on every request for service other than a single-family home and on service outside city limits; the city utilities board makes the final determination. Whether a project taking both water and wastewater service pays it once or for each service is not stated in the code.
- Sewer Connection Fee (City of La Feria) — 4" connection$450.00 one-timeCity of La FeriaIn-city fee for a 4 in. sewer connection; $750 outside city limits. Larger connections (6, 8 and 10 in.) are charged 110% of the city's cost inside the city and 200% outside.
- Sewer Utility Expansion Fee (City of La Feria)$300.00 one-timeRequires confirmationCity of La FeriaOne-time utility expansion fee of $300 per connection, normally charged on every request for service other than a single-family home and on service outside city limits; the city utilities board makes the final determination. Whether a project taking both water and wastewater service pays it once or for each service is not stated in the code.
- City Impact Fee (City of La Feria, Industrial)$0.00City of La FeriaThe City of La Feria has not adopted a roadway or drainage impact fee. Water and sewer connection and utility expansion fees are listed separately.
- County Impact Fee (Cameron County, Industrial)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
La Feria: Office Impact Fees
Office development in La Feria pays no per-square-foot impact fees, but owes $1,500.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 25,000 sq ft building, that comes to about $1,500.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (City of La Feria) — 1" ($450.00 one-time) and Sewer Connection Fee (City of La Feria) — 4" connection ($450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Utility Expansion Fee (City of La Feria) and Water Utility Expansion Fee (City of La Feria) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full La Feria Impact Fee Schedule
- Water Connection Fee (City of La Feria) — 1"$450.00 one-timeCity of La FeriaIn-city connection fee for a 1 in. water connection (the same $450 applies to 5/8 in.). Outside city limits the 5/8 in. and 1 in. fee is $750. Connections of 2 to 4 in. are charged 110% of the city's cost inside the city and 200% outside. A refundable meter deposit and a $20 activation fee are also due.
- Water Utility Expansion Fee (City of La Feria)$300.00 one-timeRequires confirmationCity of La FeriaOne-time utility expansion fee of $300 per connection, normally charged on every request for service other than a single-family home and on service outside city limits; the city utilities board makes the final determination. Whether a project taking both water and wastewater service pays it once or for each service is not stated in the code.
- Sewer Connection Fee (City of La Feria) — 4" connection$450.00 one-timeCity of La FeriaIn-city fee for a 4 in. sewer connection; $750 outside city limits. Larger connections (6, 8 and 10 in.) are charged 110% of the city's cost inside the city and 200% outside.
- Sewer Utility Expansion Fee (City of La Feria)$300.00 one-timeRequires confirmationCity of La FeriaOne-time utility expansion fee of $300 per connection, normally charged on every request for service other than a single-family home and on service outside city limits; the city utilities board makes the final determination. Whether a project taking both water and wastewater service pays it once or for each service is not stated in the code.
- City Impact Fee (City of La Feria, Office)$0.00City of La FeriaThe City of La Feria has not adopted a roadway or drainage impact fee. Water and sewer connection and utility expansion fees are listed separately.
- County Impact Fee (Cameron County, Office)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
La Feria Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
La Feria Impact Fee FAQs
What are the total impact fees for a single-family home in La Feria, Texas?
A new single-family home in La Feria pays at least $900.00 per unit in combined impact fees (rates sourced November 18, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in La Feria?
Commercial development in La Feria pays no per-square-foot impact fees, but owes $1,500.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does La Feria charge its own impact fees?
Yes. La Feria levies its own municipal impact or utility fees. Cameron County does not currently add county-level impact fees inside La Feria. The schedule on this page shows every fee that applies to development in La Feria.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Cameron County impact fees page.