Brownsville Impact Fees by Project Type
Brownsville: Single-Family Impact Fees
A new single-family home in Brownsville pays $3,100.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Impact Fee (BPUB) — Zones 2 & 3 ($1,000.00), Water Impact Fee (BPUB) — Zones 2 & 3 ($600.00) and Parkland Dedication Fee-in-Lieu (City of Brownsville) ($500.00).
Roadway Capital Recovery Fee (City of Brownsville) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Brownsville Impact Fee Schedule
- Water Impact Fee (BPUB) — Zones 2 & 3$600.00Brownsville Public Utilities Board (BPUB)Water impact fee (BPUB), by meter size (5/8"x3/4" = 1 ESU = single-family). Highest of two BPUB rate zones (Zones 2 & 3); Zone 1 is half this. Fees are 74.58% of the maximum assessable amount. Zone assignment confirmed by BPUB.
- Wastewater Impact Fee (BPUB) — Zones 2 & 3$1,000.00Brownsville Public Utilities Board (BPUB)Wastewater impact fee (BPUB), by meter size (5/8"x3/4" = 1 ESU = single-family). Highest of two BPUB rate zones (Zones 2 & 3); Zone 1 is half. Fees are 74.58% of maximum assessable.
- Roadway Capital Recovery Fee (City of Brownsville)$1,000.00Requires confirmationCity of BrownsvilleCity of Brownsville roadway capital recovery (impact) fee, $1,000 per dwelling unit at adoption, escalating 5% per year for four years from ~May 2025. Charged on new development within city limits.
- Parkland Dedication Fee-in-Lieu (City of Brownsville)$500.00City of BrownsvilleCity of Brownsville parkland dedication fee-in-lieu, $500 per dwelling unit, due at subdivision platting.
- County Impact Fees (Cameron County)$0.00Cameron CountyTexas counties cannot impose Chapter 395 impact fees; Cameron County levies none.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Brownsville: Multifamily Impact Fees
A new multifamily unit in Brownsville pays $3,100.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Impact Fee (BPUB) — Zones 2 & 3 (MF) ($1,000.00), Water Impact Fee (BPUB) — Zones 2 & 3 (MF) ($600.00) and Parkland Dedication Fee-in-Lieu (City of Brownsville, MF) ($500.00).
Roadway Capital Recovery Fee (City of Brownsville, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Brownsville Impact Fee Schedule
- Water Impact Fee (BPUB) — Zones 2 & 3 (MF)$600.00Brownsville Public Utilities Board (BPUB)Water impact fee (BPUB), by meter size (master-metered MF, 5/8"x3/4" = 1 ESU floor). Highest of two BPUB rate zones (Zones 2 & 3); Zone 1 is half. 74.58% of max assessable.
- Wastewater Impact Fee (BPUB) — Zones 2 & 3 (MF)$1,000.00Brownsville Public Utilities Board (BPUB)Wastewater impact fee (BPUB), by meter size (master-metered MF floor). Highest of two BPUB rate zones (Zones 2 & 3); Zone 1 is half. 74.58% of max assessable.
- Roadway Capital Recovery Fee (City of Brownsville, MF)$1,000.00Requires confirmationCity of BrownsvilleCity of Brownsville roadway capital recovery fee (Ord. 2024-1739), $1,000 per dwelling unit inside city limits, collected when the building permit is issued; collection began May 2026. The ordinance raises the fee 5% a year for four years after implementation, and the city reports a lower $800 rate in certain service areas.
- Parkland Dedication Fee-in-Lieu (City of Brownsville, MF)$500.00City of BrownsvilleCity of Brownsville parkland dedication fee-in-lieu, $500 per dwelling unit, due at platting.
- County Impact Fees (Cameron County, MF)$0.00Cameron CountyTexas counties cannot impose Chapter 395 impact fees; Cameron County levies none.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Brownsville: Commercial Impact Fees
Commercial development in Brownsville pays no per-square-foot impact fees, but owes $4,000.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $4,000.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (BPUB) — Zones 2 & 3, 1" ($2,500.00 one-time) and Water Impact Fee (BPUB) — Zones 2 & 3, 1" ($1,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Roadway Capital Recovery Fee (City of Brownsville, Commercial) and Parkland Fee (City of Brownsville, Commercial) — per acre are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Brownsville Impact Fee Schedule
- Water Impact Fee (BPUB) — Zones 2 & 3, 1"$1,500.00 one-timeBrownsville Public Utilities BoardBrownsville Public Utilities Board water impact fee, due at new service connection by meter size; current fees are 74.58% of the maximum assessable amount. Highest of two rate areas shown (Zones 2 and 3 are double Zone 1); BPUB assigns the zone. Taps and meter installation are charged at actual cost.
- Wastewater Impact Fee (BPUB) — Zones 2 & 3, 1"$2,500.00 one-timeBrownsville Public Utilities BoardBrownsville Public Utilities Board wastewater impact fee, due at new service connection by meter size; current fees are 74.58% of the maximum assessable amount. Highest of two rate areas shown (Zones 2 and 3 are double Zone 1); BPUB assigns the zone. Sewer taps are charged at actual cost.
- Roadway Capital Recovery Fee (City of Brownsville, Commercial)Requires confirmationCity of BrownsvilleThe City of Brownsville roadway capital recovery fee, adopted May 7, 2024 and collected since May 2026, charges nonresidential development 10% of valuation under the ordinance text; the city has described it as 10% of the maximum allowable fee for the project's service area and land use, rising 5% a year for four years. It applies inside city limits; the amount depends on the project.
- Parkland Fee (City of Brownsville, Commercial) — per acreContact jurisdiction/utility to verifyCity of BrownsvilleBrownsville charges a nonresidential parkland fee of $2,000 per subdivided acre, paid when the property is platted (FY2027 Master Fee Schedule; UDC 5.2.3.E). It is charged on land area, not building area, so it is not included in per-square-foot totals.
- County Impact Fee (Cameron County, Commercial)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Brownsville: Industrial Impact Fees
Industrial development in Brownsville pays no per-square-foot impact fees, but owes $4,000.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $4,000.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (BPUB) — Zones 2 & 3, 1" ($2,500.00 one-time) and Water Impact Fee (BPUB) — Zones 2 & 3, 1" ($1,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Roadway Capital Recovery Fee (City of Brownsville, Industrial) and Parkland Fee (City of Brownsville, Industrial) — per acre are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Brownsville Impact Fee Schedule
- Water Impact Fee (BPUB) — Zones 2 & 3, 1"$1,500.00 one-timeBrownsville Public Utilities BoardBrownsville Public Utilities Board water impact fee, due at new service connection by meter size; current fees are 74.58% of the maximum assessable amount. Highest of two rate areas shown (Zones 2 and 3 are double Zone 1); BPUB assigns the zone. Taps and meter installation are charged at actual cost.
- Wastewater Impact Fee (BPUB) — Zones 2 & 3, 1"$2,500.00 one-timeBrownsville Public Utilities BoardBrownsville Public Utilities Board wastewater impact fee, due at new service connection by meter size; current fees are 74.58% of the maximum assessable amount. Highest of two rate areas shown (Zones 2 and 3 are double Zone 1); BPUB assigns the zone. Sewer taps are charged at actual cost.
- Roadway Capital Recovery Fee (City of Brownsville, Industrial)Requires confirmationCity of BrownsvilleThe City of Brownsville roadway capital recovery fee, adopted May 7, 2024 and collected since May 2026, charges nonresidential development 10% of valuation under the ordinance text; the city has described it as 10% of the maximum allowable fee for the project's service area and land use, rising 5% a year for four years. It applies inside city limits; the amount depends on the project.
- Parkland Fee (City of Brownsville, Industrial) — per acreContact jurisdiction/utility to verifyCity of BrownsvilleBrownsville charges a nonresidential parkland fee of $2,000 per subdivided acre, paid when the property is platted (FY2027 Master Fee Schedule; UDC 5.2.3.E). It is charged on land area, not building area, so it is not included in per-square-foot totals.
- County Impact Fee (Cameron County, Industrial)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Brownsville: Office Impact Fees
Office development in Brownsville pays no per-square-foot impact fees, but owes $4,000.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to at least $4,000.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (BPUB) — Zones 2 & 3, 1" ($2,500.00 one-time) and Water Impact Fee (BPUB) — Zones 2 & 3, 1" ($1,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Parkland Fee (City of Brownsville, Office) — per acre and Roadway Capital Recovery Fee (City of Brownsville, Office) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Brownsville Impact Fee Schedule
- Water Impact Fee (BPUB) — Zones 2 & 3, 1"$1,500.00 one-timeBrownsville Public Utilities BoardBrownsville Public Utilities Board water impact fee, due at new service connection by meter size; current fees are 74.58% of the maximum assessable amount. Highest of two rate areas shown (Zones 2 and 3 are double Zone 1); BPUB assigns the zone. Taps and meter installation are charged at actual cost.
- Wastewater Impact Fee (BPUB) — Zones 2 & 3, 1"$2,500.00 one-timeBrownsville Public Utilities BoardBrownsville Public Utilities Board wastewater impact fee, due at new service connection by meter size; current fees are 74.58% of the maximum assessable amount. Highest of two rate areas shown (Zones 2 and 3 are double Zone 1); BPUB assigns the zone. Sewer taps are charged at actual cost.
- Parkland Fee (City of Brownsville, Office) — per acreContact jurisdiction/utility to verifyCity of BrownsvilleBrownsville charges a nonresidential parkland fee of $2,000 per subdivided acre, paid when the property is platted (FY2027 Master Fee Schedule; UDC 5.2.3.E). It is charged on land area, not building area, so it is not included in per-square-foot totals.
- Roadway Capital Recovery Fee (City of Brownsville, Office)Requires confirmationCity of BrownsvilleThe City of Brownsville roadway capital recovery fee, adopted May 7, 2024 and collected since May 2026, charges nonresidential development 10% of valuation under the ordinance text; the city has described it as 10% of the maximum allowable fee for the project's service area and land use, rising 5% a year for four years. It applies inside city limits; the amount depends on the project.
- County Impact Fee (Cameron County, Office)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Brownsville Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Brownsville Impact Fee FAQs
What are the total impact fees for a single-family home in Brownsville, Texas?
A new single-family home in Brownsville pays $3,100.00 per unit in combined impact fees (rates sourced November 25, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Brownsville?
Commercial development in Brownsville pays no per-square-foot impact fees, but owes $4,000.00 in one-time water and sewer connection fees (assuming a 1-inch meter). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Brownsville charge its own impact fees?
Yes. Brownsville levies its own municipal impact or utility fees. Cameron County does not currently add county-level impact fees inside Brownsville. The schedule on this page shows every fee that applies to development in Brownsville.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.