Palm Valley Impact Fees by Project Type
Palm Valley: Single-Family Impact Fees
A new single-family home in Palm Valley pays at least $2,250.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Tap Fee (City of Palm Valley) — New tap ($450.00).
Water Meter Tap Fee (City of Palm Valley) — 1" new tap is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
City Impact/Parkland Fees (City of Palm Valley) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Palm Valley Impact Fee Schedule
- Water Meter Tap Fee (City of Palm Valley) — 1" new tap$1,800.00Requires confirmationCity of Palm ValleyCity of Palm Valley water meter for a new home is 1 inch: $1,800 with a new tap, $1,600 where a tap exists, per the city's posted rates and charges. The $50 account activation fee is separate.
- Sewer Tap Fee (City of Palm Valley) — New tap$450.00City of Palm ValleyCity of Palm Valley sewer tap: $450 for a new tap, $250 where a tap exists, per the city's posted rates and charges.
- City Impact/Parkland Fees (City of Palm Valley)Requires confirmationCity of Palm ValleyNo separate city impact or parkland dedication fee identified for the City of Palm Valley.
- County Impact Fees (Cameron County)$0.00Cameron CountyTexas counties cannot impose Chapter 395 impact fees; Cameron County levies none.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Palm Valley: Multifamily Impact Fees
A new multifamily unit in Palm Valley pays at least $2,250.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Tap Fee (City of Palm Valley, MF) — New tap ($450.00).
Water Meter Tap Fee (City of Palm Valley, MF) — 1" new tap is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
City Impact/Parkland Fees (City of Palm Valley, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Palm Valley Impact Fee Schedule
- Water Meter Tap Fee (City of Palm Valley, MF) — 1" new tap$1,800.00Requires confirmationCity of Palm ValleyCity of Palm Valley water meter tap: $1,800 for a 1-inch meter with a new tap, $1,600 where a tap exists, per the city's posted rates and charges. Charged per connection; a 2-inch meter costs more.
- Sewer Tap Fee (City of Palm Valley, MF) — New tap$450.00City of Palm ValleyCity of Palm Valley sewer tap: $450 for a new tap, $250 where a tap exists, per connection.
- City Impact/Parkland Fees (City of Palm Valley, MF)Requires confirmationCity of Palm ValleyNo separate city impact or parkland dedication fee identified for the City of Palm Valley.
- County Impact Fees (Cameron County, MF)$0.00Cameron CountyTexas counties cannot impose Chapter 395 impact fees; Cameron County levies none.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Palm Valley: Commercial Impact Fees
Commercial development in Palm Valley pays no per-square-foot impact fees, but owes $2,250.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 50,000 sq ft building, that comes to at least $2,250.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap Fee (City of Palm Valley) — New tap ($450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Meter and Tap Fee (City of Palm Valley) — 1", new tap is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
City Impact Fee (City of Palm Valley, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Palm Valley Impact Fee Schedule
- Water Meter and Tap Fee (City of Palm Valley) — 1", new tap$1,800.00 one-timeRequires confirmationCity of Palm ValleyWater service is provided by the City of Palm Valley. A new 1-inch meter with a new tap costs $1,800; where a tap already exists, $1,600. Only 1-inch and 2-inch meters are listed. Fire service ($90 commercial) and drainage ($60 commercial) fees are billed separately.
- Sewer Tap Fee (City of Palm Valley) — New tap$450.00 one-timeCity of Palm ValleySewer service is provided by the City of Palm Valley. One-time sewer tap fee of $450 for a new tap, or $250 where a tap already exists.
- City Impact Fee (City of Palm Valley, Commercial)Requires confirmationCity of Palm ValleyTexas cities may levy impact fees only for water, wastewater, roadway and drainage. No one-time Palm Valley impact fee has been identified; the per-gallon charge the city code calls an impact fee is part of the monthly utility bill. Utility tap and meter fees are listed separately.
- County Impact Fee (Cameron County, Commercial)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Palm Valley: Industrial Impact Fees
Industrial development in Palm Valley pays no per-square-foot impact fees, but owes $2,250.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 50,000 sq ft building, that comes to at least $2,250.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap Fee (City of Palm Valley) — New tap ($450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Meter and Tap Fee (City of Palm Valley) — 1", new tap is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
City Impact Fee (City of Palm Valley, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Palm Valley Impact Fee Schedule
- Water Meter and Tap Fee (City of Palm Valley) — 1", new tap$1,800.00 one-timeRequires confirmationCity of Palm ValleyWater service is provided by the City of Palm Valley. A new 1-inch meter with a new tap costs $1,800; where a tap already exists, $1,600. Only 1-inch and 2-inch meters are listed. Fire service ($90 commercial) and drainage ($60 commercial) fees are billed separately.
- Sewer Tap Fee (City of Palm Valley) — New tap$450.00 one-timeCity of Palm ValleySewer service is provided by the City of Palm Valley. One-time sewer tap fee of $450 for a new tap, or $250 where a tap already exists.
- City Impact Fee (City of Palm Valley, Industrial)Requires confirmationCity of Palm ValleyTexas cities may levy impact fees only for water, wastewater, roadway and drainage. No one-time Palm Valley impact fee has been identified; the per-gallon charge the city code calls an impact fee is part of the monthly utility bill. Utility tap and meter fees are listed separately.
- County Impact Fee (Cameron County, Industrial)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Palm Valley: Office Impact Fees
Office development in Palm Valley pays no per-square-foot impact fees, but owes $2,250.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 25,000 sq ft building, that comes to at least $2,250.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap Fee (City of Palm Valley) — New tap ($450.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Meter and Tap Fee (City of Palm Valley) — 1", new tap is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
City Impact Fee (City of Palm Valley, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Palm Valley Impact Fee Schedule
- Water Meter and Tap Fee (City of Palm Valley) — 1", new tap$1,800.00 one-timeRequires confirmationCity of Palm ValleyWater service is provided by the City of Palm Valley. A new 1-inch meter with a new tap costs $1,800; where a tap already exists, $1,600. Only 1-inch and 2-inch meters are listed. Fire service ($90 commercial) and drainage ($60 commercial) fees are billed separately.
- Sewer Tap Fee (City of Palm Valley) — New tap$450.00 one-timeCity of Palm ValleySewer service is provided by the City of Palm Valley. One-time sewer tap fee of $450 for a new tap, or $250 where a tap already exists.
- City Impact Fee (City of Palm Valley, Office)Requires confirmationCity of Palm ValleyTexas cities may levy impact fees only for water, wastewater, roadway and drainage. No one-time Palm Valley impact fee has been identified; the per-gallon charge the city code calls an impact fee is part of the monthly utility bill. Utility tap and meter fees are listed separately.
- County Impact Fee (Cameron County, Office)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Palm Valley Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Palm Valley Impact Fee FAQs
What are the total impact fees for a single-family home in Palm Valley, Texas?
A new single-family home in Palm Valley pays at least $2,250.00 per unit in combined impact fees (rates sourced November 18, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Palm Valley?
Commercial development in Palm Valley pays no per-square-foot impact fees, but owes $2,250.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Palm Valley charge its own impact fees?
Yes. Palm Valley levies its own municipal impact or utility fees. Cameron County does not currently add county-level impact fees inside Palm Valley. The schedule on this page shows every fee that applies to development in Palm Valley.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Cameron County impact fees page.