San Benito Impact Fees by Project Type
San Benito: Single-Family Impact Fees
A new single-family home in San Benito pays $3,345.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Tap Fee (City of San Benito) ($1,500.00), Water Tap Fee (City of San Benito) ($700.00) and Park Settlement Fee-in-Lieu (City of San Benito) ($600.00).
View the Full San Benito Impact Fee Schedule
- Water Tap Fee (City of San Benito)$700.00City of San BenitoCity of San Benito water tap fee, $700 for a new 3/4-inch tap inside city limits ($800 outside), plus a $100 meter fee. Developers pay tap fees before the plat is recorded; street crossings are billed in addition.
- Water Capital Improvement Connection Fee (City of San Benito)$370.00City of San BenitoCity of San Benito water capital improvement fee (Code Sec. 13.03.020(a), Ord. 2409-H-C, adopted 6/17/2025), $370 per single-family lot. Tap and meter fees are charged separately.
- Sewer Tap Fee (City of San Benito)$1,500.00City of San BenitoCity of San Benito sewer tap fee, $1,500 for a 4-inch tap inside city limits ($1,700 outside). Developers pay tap fees before the plat is recorded.
- Wastewater Capital Improvement Connection Fee (City of San Benito)$175.00City of San BenitoCity of San Benito wastewater capital improvement fee (Code Sec. 13.03.020(d), Ord. 2409-H-C, adopted 6/17/2025), $175 per single-family connection. The sewer tap fee is charged separately.
- Park Settlement Fee-in-Lieu (City of San Benito)$600.00City of San BenitoCity of San Benito park settlement (parkland dedication) fee, $600 per dwelling, due at platting.
- County Impact Fees (Cameron County)$0.00Cameron CountyTexas counties cannot impose Chapter 395 impact fees; Cameron County levies none.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
San Benito: Multifamily Impact Fees
A new multifamily unit in San Benito pays $3,060.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Tap Fee (City of San Benito, MF) ($1,500.00), Water Tap Fee (City of San Benito, MF) ($700.00) and Park Settlement Fee-in-Lieu (City of San Benito, MF) ($600.00).
View the Full San Benito Impact Fee Schedule
- Water Tap Fee (City of San Benito, MF)$700.00City of San BenitoCity of San Benito water tap fee, $700 for a new 3/4-inch tap inside city limits, plus a $100 meter fee. Charged per connection, so a building on one tap pays it once; larger taps cost more.
- Water Capital Improvement Connection Fee (City of San Benito, MF)$150.00City of San BenitoCity of San Benito water impact (capital improvement) fee, $150 per apartment unit. A separate water tap fee (by meter size) also applies to the building's master meter.
- Sewer Tap Fee (City of San Benito, MF)$1,500.00City of San BenitoCity of San Benito sewer tap fee, $1,500 for a 4-inch tap inside city limits ($1,700 outside). Charged per connection, so a building on one tap pays it once.
- Wastewater Capital Improvement Connection Fee (City of San Benito, MF)$110.00City of San BenitoCity of San Benito wastewater impact fee, $110 per apartment unit. A separate sewer tap fee also applies to the building connection.
- Park Settlement Fee-in-Lieu (City of San Benito, MF)$600.00City of San BenitoCity of San Benito park settlement (parkland dedication) fee, $600 per dwelling unit, due at platting.
- County Impact Fees (Cameron County, MF)$0.00Cameron CountyTexas counties cannot impose Chapter 395 impact fees; Cameron County levies none.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
San Benito: Commercial Impact Fees
Commercial development in San Benito pays $0.10 per square foot in impact fees, plus $2,365.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 50,000 sq ft building, that comes to about $7,365.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap Fee (City of San Benito) — 4", new tap ($1,500.00 one-time), Water Tap Fee (City of San Benito) — 1", new tap ($800.00 one-time) and Water Capital Improvement Fee (City of San Benito) — commercial, per connection ($65.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full San Benito Impact Fee Schedule
- Water Tap Fee (City of San Benito) — 1", new tap$800.00 one-timeCity of San BenitoWater service is provided by the City of San Benito. A new 1-inch water tap inside the city costs $800; connecting to an existing tap costs $100. Outside the city limits the new tap is $900. Street crossings are charged in addition. Taps of 2 inches and larger are estimates billed at actual cost.
- Water Capital Improvement Fee (City of San Benito) — commercial, per connection$65.00 one-timeCity of San BenitoCharged per water connection in addition to the per-square-foot capital improvement fee for commercial uses.
- Water Capital Improvement Fee (City of San Benito) — store commercial, per sq ft$0.05/sq ftCity of San BenitoCity of San Benito water capital improvement fee of $0.05 per square foot for commercial stores, plus $65 per connection. Offices pay $210 each. The schedule also lists $375 per 1,000 gallons per day under its school group. The rate is 35% of the maximum amount set in the city code (Ordinance 2409-H-C, June 2025).
- Sewer Tap Fee (City of San Benito) — 4", new tap$1,500.00 one-timeCity of San BenitoSewer service is provided by the City of San Benito. A new 4-inch sewer tap inside the city costs $1,500; connecting to an existing tap costs $100. Outside the city limits the new tap is $1,700. Street crossings are charged in addition.
- Wastewater Capital Improvement Fee (City of San Benito) — store commercial, per sq ft$0.05/sq ftCity of San BenitoCity of San Benito wastewater capital improvement fee of $0.05 per square foot for commercial stores. Offices pay $245 each. The rate is 35% of the maximum amount set in the city code (Ordinance 2409-H-C, June 2025).
- City Impact Fee (City of San Benito, Commercial)$0.00City of San BenitoThe City of San Benito has not adopted a roadway or drainage impact fee. Its water and wastewater tap and capital improvement fees are listed separately.
- County Impact Fee (Cameron County, Commercial)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
San Benito: Industrial Impact Fees
Industrial development in San Benito pays $0.10 per square foot in impact fees, plus $2,365.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 50,000 sq ft building, that comes to about $7,365.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap Fee (City of San Benito) — 4", new tap ($1,500.00 one-time), Water Tap Fee (City of San Benito) — 1", new tap ($800.00 one-time) and Water Capital Improvement Fee (City of San Benito) — commercial, per connection ($65.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full San Benito Impact Fee Schedule
- Water Tap Fee (City of San Benito) — 1", new tap$800.00 one-timeCity of San BenitoWater service is provided by the City of San Benito. A new 1-inch water tap inside the city costs $800; connecting to an existing tap costs $100. Outside the city limits the new tap is $900. Street crossings are charged in addition. Taps of 2 inches and larger are estimates billed at actual cost.
- Water Capital Improvement Fee (City of San Benito) — commercial, per connection$65.00 one-timeCity of San BenitoCharged per water connection in addition to the per-square-foot capital improvement fee for commercial uses.
- Water Capital Improvement Fee (City of San Benito) — store commercial, per sq ft$0.05/sq ftCity of San BenitoCity of San Benito water capital improvement fee of $0.05 per square foot for commercial stores, plus $65 per connection. Offices pay $210 each. The schedule also lists $375 per 1,000 gallons per day under its school group. The rate is 35% of the maximum amount set in the city code (Ordinance 2409-H-C, June 2025).
- Sewer Tap Fee (City of San Benito) — 4", new tap$1,500.00 one-timeCity of San BenitoSewer service is provided by the City of San Benito. A new 4-inch sewer tap inside the city costs $1,500; connecting to an existing tap costs $100. Outside the city limits the new tap is $1,700. Street crossings are charged in addition.
- Wastewater Capital Improvement Fee (City of San Benito) — store commercial, per sq ft$0.05/sq ftCity of San BenitoCity of San Benito wastewater capital improvement fee of $0.05 per square foot for commercial stores. Offices pay $245 each. The rate is 35% of the maximum amount set in the city code (Ordinance 2409-H-C, June 2025).
- City Impact Fee (City of San Benito, Industrial)$0.00City of San BenitoThe City of San Benito has not adopted a roadway or drainage impact fee. Its water and wastewater tap and capital improvement fees are listed separately.
- County Impact Fee (Cameron County, Industrial)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
San Benito: Office Impact Fees
Office development in San Benito pays $0.10 per square foot in impact fees, plus $2,365.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 25,000 sq ft building, that comes to about $4,865.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap Fee (City of San Benito) — 4", new tap ($1,500.00 one-time), Water Tap Fee (City of San Benito) — 1", new tap ($800.00 one-time) and Water Capital Improvement Fee (City of San Benito) — commercial, per connection ($65.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full San Benito Impact Fee Schedule
- Water Tap Fee (City of San Benito) — 1", new tap$800.00 one-timeCity of San BenitoWater service is provided by the City of San Benito. A new 1-inch water tap inside the city costs $800; connecting to an existing tap costs $100. Outside the city limits the new tap is $900. Street crossings are charged in addition. Taps of 2 inches and larger are estimates billed at actual cost.
- Water Capital Improvement Fee (City of San Benito) — commercial, per connection$65.00 one-timeCity of San BenitoCharged per water connection in addition to the per-square-foot capital improvement fee for commercial uses.
- Water Capital Improvement Fee (City of San Benito) — store commercial, per sq ft$0.05/sq ftCity of San BenitoCity of San Benito water capital improvement fee of $0.05 per square foot for commercial stores, plus $65 per connection. Offices pay $210 each. The schedule also lists $375 per 1,000 gallons per day under its school group. The rate is 35% of the maximum amount set in the city code (Ordinance 2409-H-C, June 2025).
- Sewer Tap Fee (City of San Benito) — 4", new tap$1,500.00 one-timeCity of San BenitoSewer service is provided by the City of San Benito. A new 4-inch sewer tap inside the city costs $1,500; connecting to an existing tap costs $100. Outside the city limits the new tap is $1,700. Street crossings are charged in addition.
- Wastewater Capital Improvement Fee (City of San Benito) — store commercial, per sq ft$0.05/sq ftCity of San BenitoCity of San Benito wastewater capital improvement fee of $0.05 per square foot for commercial stores. Offices pay $245 each. The rate is 35% of the maximum amount set in the city code (Ordinance 2409-H-C, June 2025).
- City Impact Fee (City of San Benito, Office)$0.00City of San BenitoThe City of San Benito has not adopted a roadway or drainage impact fee. Its water and wastewater tap and capital improvement fees are listed separately.
- County Impact Fee (Cameron County, Office)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
San Benito Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
San Benito Impact Fee FAQs
What are the total impact fees for a single-family home in San Benito, Texas?
A new single-family home in San Benito pays $3,345.00 per unit in combined impact fees (rates sourced November 18, 2026).
How much are commercial impact fees in San Benito?
Commercial development in San Benito pays $0.10 per square foot in impact fees, plus $2,365.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $7,365.00 for a 50,000 sq ft building.
Does San Benito charge its own impact fees?
Yes. San Benito levies its own municipal impact or utility fees. Cameron County does not currently add county-level impact fees inside San Benito. The schedule on this page shows every fee that applies to development in San Benito.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Cameron County impact fees page.