Bayview Impact Fees by Project Type
Bayview: Single-Family Impact Fees
A new single-family home in Bayview pays $3,250.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact and Installation Fee — East Rio Hondo WSC, new tap ($2,000 impact + $1,250 installation) ($3,250.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Bayview Impact Fee Schedule
- Water Impact and Installation Fee — East Rio Hondo WSC, new tap ($2,000 impact + $1,250 installation)$3,250.00East Rio Hondo Water Supply CorporationBayview water service is provided by East Rio Hondo Water Supply Corporation. A new single-family service pays a one-time impact fee of $2,000 per service unit plus a $1,250 standard installation fee where no tap exists ($535 where one exists). A refundable $315 membership fee and a water-rights charge set at market price (0.625 acre-feet per service unit) also apply.
- Sewer Connection Fee (Town of Bayview)$0.00Village of BayviewBayview has no public sewer system; homes use on-site septic systems, so no sewer connection fee applies. The town charges septic permit fees.
- City Impact/Parkland Fees (Village of Bayview)$0.00Village of BayviewThe Town of Bayview charges building and septic permit fees but no impact or parkland fees under its zoning ordinance (revised April 17, 2025).
- County Impact Fees (Cameron County)$0.00Cameron CountyTexas counties cannot impose Chapter 395 impact fees; Cameron County levies none.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bayview: Multifamily Impact Fees
A new multifamily unit in Bayview pays $3,250.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact and Installation Fee (MF) — East Rio Hondo WSC, new tap ($2,000 impact + $1,250 installation) ($3,250.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Bayview Impact Fee Schedule
- Water Impact and Installation Fee (MF) — East Rio Hondo WSC, new tap ($2,000 impact + $1,250 installation)$3,250.00East Rio Hondo Water Supply CorporationBayview water service is provided by East Rio Hondo Water Supply Corporation. Each individually metered unit pays a one-time impact fee of $2,000 per service unit plus a $1,250 standard installation fee where no tap exists. A refundable $315 membership fee and a market-priced water-rights charge also apply.
- Sewer Connection Fee (Town of Bayview, MF)$0.00Village of BayviewBayview has no public sewer system; homes use on-site septic systems, so no sewer connection fee applies. The town charges septic permit fees.
- City Impact/Parkland Fees (Village of Bayview, MF)$0.00Village of BayviewThe Town of Bayview charges building and septic permit fees but no impact or parkland fees under its zoning ordinance (revised April 17, 2025).
- County Impact Fees (Cameron County, MF)$0.00Cameron CountyTexas counties cannot impose Chapter 395 impact fees; Cameron County levies none.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bayview: Commercial Impact Fees
Commercial development in Bayview pays no per-square-foot impact fees, but owes $8,125.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 50,000 sq ft building, that comes to at least $8,125.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (East Rio Hondo WSC) — 1" (2.5 SU × ($2,000 + $1,250)) ($8,125.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
City Impact Fee (Village of Bayview, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Bayview Impact Fee Schedule
- Water Connection Fee (East Rio Hondo WSC) — 1" (2.5 SU × ($2,000 + $1,250))$8,125.00 one-timeEast Rio Hondo Water Supply CorporationBayview water is provided by East Rio Hondo WSC: water impact fee $2,000 plus new-tap installation $1,250 per service unit; a 1" meter is 2.5 service units. A refundable membership fee and a water rights charge at market price (0.625 acre-feet per service unit) are also due; line extensions are priced at cost.
- Sewer Connection Fee (Village of Bayview)$0.00Village of BayviewBayview has no public sewer system; development uses on-site septic systems permitted by Cameron County.
- City Impact Fee (Village of Bayview, Commercial)Requires confirmationVillage of BayviewNo city impact fee has been identified for the Village of Bayview.
- County Impact Fee (Cameron County, Commercial)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bayview: Industrial Impact Fees
Industrial development in Bayview pays no per-square-foot impact fees, but owes $8,125.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 50,000 sq ft building, that comes to at least $8,125.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (East Rio Hondo WSC) — 1" (2.5 SU × ($2,000 + $1,250)) ($8,125.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
City Impact Fee (Village of Bayview, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Bayview Impact Fee Schedule
- Water Connection Fee (East Rio Hondo WSC) — 1" (2.5 SU × ($2,000 + $1,250))$8,125.00 one-timeEast Rio Hondo Water Supply CorporationBayview water is provided by East Rio Hondo WSC: water impact fee $2,000 plus new-tap installation $1,250 per service unit; a 1" meter is 2.5 service units. A refundable membership fee and a water rights charge at market price (0.625 acre-feet per service unit) are also due; line extensions are priced at cost.
- Sewer Connection Fee (Village of Bayview)$0.00Village of BayviewBayview has no public sewer system; development uses on-site septic systems permitted by Cameron County.
- City Impact Fee (Village of Bayview, Industrial)Requires confirmationVillage of BayviewNo city impact fee has been identified for the Village of Bayview.
- County Impact Fee (Cameron County, Industrial)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bayview: Office Impact Fees
Office development in Bayview pays no per-square-foot impact fees, but owes $8,125.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 25,000 sq ft building, that comes to at least $8,125.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee (East Rio Hondo WSC) — 1" (2.5 SU × ($2,000 + $1,250)) ($8,125.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
City Impact Fee (Village of Bayview, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Bayview Impact Fee Schedule
- Water Connection Fee (East Rio Hondo WSC) — 1" (2.5 SU × ($2,000 + $1,250))$8,125.00 one-timeEast Rio Hondo Water Supply CorporationBayview water is provided by East Rio Hondo WSC: water impact fee $2,000 plus new-tap installation $1,250 per service unit; a 1" meter is 2.5 service units. A refundable membership fee and a water rights charge at market price (0.625 acre-feet per service unit) are also due; line extensions are priced at cost.
- Sewer Connection Fee (Village of Bayview)$0.00Village of BayviewBayview has no public sewer system; development uses on-site septic systems permitted by Cameron County.
- City Impact Fee (Village of Bayview, Office)Requires confirmationVillage of BayviewNo city impact fee has been identified for the Village of Bayview.
- County Impact Fee (Cameron County, Office)$0.00Cameron CountyCameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Cameron County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bayview Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Bayview Impact Fee FAQs
What are the total impact fees for a single-family home in Bayview, Texas?
A new single-family home in Bayview pays $3,250.00 per unit in combined impact fees (rates sourced November 18, 2026).
How much are commercial impact fees in Bayview?
Commercial development in Bayview pays no per-square-foot impact fees, but owes $8,125.00 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Bayview charge its own impact fees?
Yes. Bayview levies its own municipal impact or utility fees. Cameron County does not currently add county-level impact fees inside Bayview. The schedule on this page shows every fee that applies to development in Bayview.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Cameron County impact fees page.