Skip to content
IMPACTFEES.ORG

Los Fresnos, Texas Impact Fees

Los Fresnos applies its own fee schedule. Cameron County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $1,300.00 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Los Fresnos Impact Fees by Project Type

Los Fresnos: Single-Family Impact Fees

A new single-family home in Los Fresnos pays at least $1,300.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Tap Fee (City of Los Fresnos) — 3/4" city-installed ($600.00), Wastewater Connection Fee (City of Los Fresnos) ($350.00) and Water Utility Expansion Fee (City of Los Fresnos) ($350.00).

City Impact/Parkland Fees (City of Los Fresnos) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Los Fresnos Impact Fee Schedule
Water$950.00
  • Water Tap Fee (City of Los Fresnos) — 3/4" city-installed
    City of Los Fresnos
    City of Los Fresnos water tap for a 3/4-inch meter installed by the city: $600 inside city limits ($750 outside), Fee Schedule Sec. 44-13 effective October 2025. A $350 water utility expansion charge also applies.
    $600.00
  • Water Utility Expansion Fee (City of Los Fresnos)
    City of Los Fresnos
    City of Los Fresnos one-time water utility expansion charge: $350 per new water service inside city limits ($437.50 outside), Fee Schedule Sec. 44-13 effective October 2025. Paid in addition to the tap fee.
    $350.00
Sewer$350.00
City$0.00
County$0.00
Total (Los Fresnos): $1,300.00
Sources last checked Official fee schedules:City of Los Fresnos Cameron County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Cameron County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Los Fresnos: Multifamily Impact Fees

A new multifamily unit in Los Fresnos pays at least $1,300.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Tap Fee (City of Los Fresnos, MF) — 3/4" city-installed ($600.00), Water Utility Expansion Fee (City of Los Fresnos, MF) ($350.00) and Wastewater Connection Fee (City of Los Fresnos, MF) ($350.00).

City Impact/Parkland Fees (City of Los Fresnos, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Los Fresnos Impact Fee Schedule
Water$950.00
Sewer$350.00
City$0.00
County$0.00
Total (Los Fresnos): $1,300.00
Sources last checked Official fee schedules:City of Los Fresnos Cameron County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Cameron County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Los Fresnos: Commercial Impact Fees

Commercial development in Los Fresnos pays no per-square-foot impact fees, but owes $1,425.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 50,000 sq ft building, that comes to about $1,425.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (City of Los Fresnos) — 1" ($725.00 one-time), Wastewater Connection Fee (City of Los Fresnos) ($350.00 one-time) and Water Utility Expansion Fee (City of Los Fresnos) ($350.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Los Fresnos Impact Fee Schedule
Water$1,075.00 one-time
  • Water Tap Fee (City of Los Fresnos) — 1"
    City of Los Fresnos
    In-city tap fee for a 1 in. water meter installed by the city, under the city fee schedule effective October 2025. Outside city limits the 1 in. tap is $906.25; taps over 3 in. are actual cost plus 25%. A $350 water utility expansion fee, a $25 meter connection fee and a deposit are also due.
    $725.00 one-time
  • Water Utility Expansion Fee (City of Los Fresnos)
    City of Los Fresnos
    One-time water utility expansion fee for a new in-city connection under the city fee schedule effective October 2025; $437.50 outside city limits. Paid in addition to the tap fee.
    $350.00 one-time
Sewer$350.00 one-time
City$0.00
County$0.00
  • County Impact Fee (Cameron County, Commercial)
    Cameron County
    Cameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Los Fresnos): $1,425.00 one-time (≈ $1,425.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Los Fresnos Cameron County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Cameron County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Los Fresnos: Industrial Impact Fees

Industrial development in Los Fresnos pays no per-square-foot impact fees, but owes $1,425.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 50,000 sq ft building, that comes to about $1,425.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (City of Los Fresnos) — 1" ($725.00 one-time), Wastewater Connection Fee (City of Los Fresnos) ($350.00 one-time) and Water Utility Expansion Fee (City of Los Fresnos) ($350.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Los Fresnos Impact Fee Schedule
Water$1,075.00 one-time
  • Water Tap Fee (City of Los Fresnos) — 1"
    City of Los Fresnos
    In-city tap fee for a 1 in. water meter installed by the city, under the city fee schedule effective October 2025. Outside city limits the 1 in. tap is $906.25; taps over 3 in. are actual cost plus 25%. A $350 water utility expansion fee, a $25 meter connection fee and a deposit are also due.
    $725.00 one-time
  • Water Utility Expansion Fee (City of Los Fresnos)
    City of Los Fresnos
    One-time water utility expansion fee for a new in-city connection under the city fee schedule effective October 2025; $437.50 outside city limits. Paid in addition to the tap fee.
    $350.00 one-time
Sewer$350.00 one-time
City$0.00
County$0.00
  • County Impact Fee (Cameron County, Industrial)
    Cameron County
    Cameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Los Fresnos): $1,425.00 one-time (≈ $1,425.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Los Fresnos Cameron County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Cameron County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Los Fresnos: Office Impact Fees

Office development in Los Fresnos pays no per-square-foot impact fees, but owes $1,425.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 25,000 sq ft building, that comes to about $1,425.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (City of Los Fresnos) — 1" ($725.00 one-time), Wastewater Connection Fee (City of Los Fresnos) ($350.00 one-time) and Water Utility Expansion Fee (City of Los Fresnos) ($350.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Los Fresnos Impact Fee Schedule
Water$1,075.00 one-time
  • Water Tap Fee (City of Los Fresnos) — 1"
    City of Los Fresnos
    In-city tap fee for a 1 in. water meter installed by the city, under the city fee schedule effective October 2025. Outside city limits the 1 in. tap is $906.25; taps over 3 in. are actual cost plus 25%. A $350 water utility expansion fee, a $25 meter connection fee and a deposit are also due.
    $725.00 one-time
  • Water Utility Expansion Fee (City of Los Fresnos)
    City of Los Fresnos
    One-time water utility expansion fee for a new in-city connection under the city fee schedule effective October 2025; $437.50 outside city limits. Paid in addition to the tap fee.
    $350.00 one-time
Sewer$350.00 one-time
City$0.00
County$0.00
  • County Impact Fee (Cameron County, Office)
    Cameron County
    Cameron County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Los Fresnos): $1,425.00 one-time (≈ $1,425.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Los Fresnos Cameron County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Cameron County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Los Fresnos Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Los Fresnos Impact Fee FAQs

What are the total impact fees for a single-family home in Los Fresnos, Texas?

A new single-family home in Los Fresnos pays at least $1,300.00 per unit in combined impact fees (rates sourced November 18, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Los Fresnos?

Commercial development in Los Fresnos pays no per-square-foot impact fees, but owes $1,425.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Los Fresnos charge its own impact fees?

Yes. Los Fresnos levies its own municipal impact or utility fees. Cameron County does not currently add county-level impact fees inside Los Fresnos. The schedule on this page shows every fee that applies to development in Los Fresnos.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Cameron County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.